PREVENTIVE MAINTENANCE CHECK LIST

Unit equipment : Hour/ Odo meter :


Merk/ type : Tgl. Pemeriksaan :
Kapasitas :
Prev.
Maint Time Aktual Kondisi
Uraian Rencana Keterangan
Interval
No. P Ok No
Alarm dan asesoris C A G 5
Petunjuk sudut boom (manual) C A G 5
Petunjuk beban (Safe load indicator) C A G 5
Petunjuk level (level indicator) C A G 5
Lock swing C A G 5
Swing & Back up alarm C A G 5
HARIAN

Klakson, Kaca cermin (spion), wiper C A G 5


Rem dan kopling C A G 5
Oli mesin C 5
Oli hidrolik C 5
Oli transmisi C 5
Battery/ accu C 5
Radiator coolant C 5
V-belt C 5
Ban dan roda C 5
Boom section wear pads P 5
Lift cylinder base & rod shaft P 5
Boom pivot/ anchor shaft P 5
Oscillating lockout cylinder base P 5
Oscillating lockout crane P 5
WEEKLY

Hook block swivel bearing P 5


Cross joint shaft axle P 5
Shaft housing hose reel P 5
Cross joint propeller shaft P 5
Front & rear steer tie rod shaft P 5
Vertical pin front & rear axle P 5
Tie rod front & rear axle P 5
Swing gear or turn table P 5
Keterangan
G : Ganti A : Adjustment (pengaturan)
C : Check/Periksa D : Drain and Flushing (dikuras)
B : Bersihkan P : Pelumasan
Operator Maintenance Disetujui