Professional Documents
Culture Documents
[Subjects] □ Truck Crane □ Crawler Crane □ Tower Crane □ Vehicle with Crane □ Side Boom
Result Column (Ö ): Yes/Good, Acceptable, (X): Not/Bad, Not to use, (NA): Not applicable
EQUIPMENT CARRY-IN CERTIFICATE
Type : Police No. :
Machine No : Certificate No :
Serial No. : Certificate Validity :
Capacity : Operator Name :
Manufacturer : Operator License :
Subcontractor : Operator License Validity :
Date of Inspection : Validity of Inspection :
Place of Inspection : Type of Inspection Monthly
This form must be completed by the operator and company user before entering the equipment to be operated in the
site project area, and at any time of setting location. All equipment condition must meet to the Safety Regulation and
GTU Management Plan
7 : 7 Swivel Bearing :
8 : 8 Hook :
9 Safety Latch
Machine
I : Yes No N/A U : Yes No N/A
1 Starting Motor : 9 Bolting :
2 Battery and Wire : 10 Engine Mounting :
3 Wiring System : 11 Engine Guard :
4 Charging System : 12 Turbo Charges :
5 Fueling System : 13 Fueling Lines :
6 Lubricating System : 14 Water Leaking :
7 Cooling System : 15 Oil Leaking :
8 Oil Filter and Air Filter : 16 Fuel Leaking :
Indicator System
J : Yes No N/A V : Yes No N/A
1 Tachometer : 5 Oil Pressure :
2 Traveling Lamps : 6 Hydraulic Oil Pressure :
3 Traveling Alarm : 7 Air Pressure :
4 Water Cooling : 8 Ampere Meter :
Page 3 of 4
EPC PEMIPAAN CIPAKU – POND J
Inspector Instruction:
Inspection Result:
NOT SAFE to Operate SAFE to Operate
Page 4 of 4