Professional Documents
Culture Documents
Form - 2 Crane and Lifting Equipment REV
Form - 2 Crane and Lifting Equipment REV
[Subjects] □ Truck Crane □ Crawler Crane □ Tower Crane □ Vehicle with Crane □ Side Boom
Result Column (Ö ): Yes/Good, Acceptable, (X): Not/Bad, Not to use, (NA): Not applicable
EQUIPMENT CARRY-IN CERTIFICATE
Type : Police No. :
Machine No : Certificate No :
Serial No. : Certificate Validity :
Capacity : Operator Name :
Manufacturer : Operator License :
Subcontractor : Operator License Validity :
Date of Inspection : Validity of Inspection :
Place of Inspection : Type of Inspection High Risk / 3
Monthly
Month
This form must be completed by the operator and company user before entering the equipment to be operated in the
site project area, and at any time of setting location. All equipment condition must meet to the Safety Regulation and
GTU Management Plan
Page 1 of 4
Form/2/Crane & Lifting Equipment
PT WIDI JAYA ANGGUN
Page 2 of 4
Form/2/Crane & Lifting Equipment
PT WIDI JAYA ANGGUN
Inspector Instruction:
Page 3 of 4
Form/2/Crane & Lifting Equipment
PT WIDI JAYA ANGGUN
Inspection Result:
NOT SAFE to Operate SAFE to Operate
Page 4 of 4
Form/2/Crane & Lifting Equipment