I.A Sub-structure
1 Footing
Soil excavation 244.63 1 m³ 244.63
F1 0.90 0.9 1.85 2.00 1 m³ 3.00
3 Stump Column
Formwork 4.32 1 m² 4.32
SC1 0.20 0.2 1 58.00 1 m² 46.40
I.B Super-structure
1 E0 (included stairs)
E0 Beam
Lean concrete(use footing area x 0.05m 4.76
4.76 1 m³
thk x 1.2)
E0 Stair
Formwork 58.40 1 m² 58.40
ពុមពបត 9.31 1 1 3.00 1 m² 27.93
2 E1
E1 Beam
Formwork 176.45 1 m² 176.45
B1-1 1 m² 92.16
0.20 0.30 3.20 48
B1-2 1 m² 2.21
0.20 0.30 1.23 3
B1-2 1 m² 30.42
0.20 0.30 3.90 13
B1-2 1 m² 17.16
0.20 0.30 2.20 13
B1-2 1 m² 22.62
0.20 0.30 2.90 13
B1-3 1 m² 5.88
0.20 0.20 1.23 12
B1-3 1 m² 6.00
0.20 0.20 2.50 6
B1-4 1 m² 2.60
0.25 0.13 1.40 6
B1-1 1 m³ 9.22
0.20 0.30 3.20 48
B1-2 1 m³ 0.22
0.20 0.30 1.23 3
B1-2 1 m³ 3.04
0.20 0.30 3.90 13
B1-2 1 m³ 1.72
0.20 0.30 2.20 13
B1-2 1 m³ 2.26
0.20 0.30 2.90 13
B1-3 1 m³ 0.59
0.20 0.20 1.23 12
B1-3 1 m³ 0.60
0.20 0.20 2.50 6
B1-4 1 m³ 0.27
0.25 0.13 1.40 6
B1-4 1 m³ 0.41
0.25 0.13 2.10 6
B1-5 1 m³ 0.70
0.25 0.16 2.90 6
Reinforcement bar SD390 2.94 1 tons 2.94
Diameter 6mm 10mm 16mm 18mm
E1 Slab
Formwork 179.76 1 m² 179.76
S1-1 11.10 1 0.1 8.00 1 m² 88.80
5 Er
Er Beam
Formwork 176.55 1 m² 176.55
1 m² 24.58
B2-1 0.20 0.3 3.2 12.00
1 m² 20.74
B2-2 0.20 0.25 3.2 12.00
1 m² 20.74
B2-3 0.20 0.25 3.2 12.00
1 m² 26.88
B2-4 0.20 0.25 3.2 12.00
1 m² 14.49
B2-5 0.20 0.25 3.45 6.00
1 m² 5.95
B2-5 0.20 0.25 1.225 9.00
1 m² 63.18
B2-6 0.20 0.25 9 13.00
Concrete C30 15.50 1 m³ 15.50
1 m³ 2.30
B2-1 0.20 0.3 3.2 12.00
1 m³ 1.92
B2-2 0.20 0.25 3.2 12.00
1 m³ 1.92
B2-3 0.20 0.25 3.2 12.00
1 m³ 1.92
B2-4 0.20 0.25 3.2 12.00
1 m³ 1.04
B2-5 0.20 0.25 3.45 6.00
1 m³ 0.55
B2-5 0.20 0.25 1.225 9.00
1 m³ 5.85
B2-6 0.20 0.25 9 13.00
Reinforcement bar SD390 2.25 1 tons 2.25
Diameter 6mm 10mm 14mm 16mm
1 tons 0.22
S2-1 216
1 tons 0.80
S2-1 799.2
1 tons 0.58
S2-1 583.2
1 tons 0.11
S2-2 114.48
1 tons 0.07
S2-3 72
1 tons 0.27
S2-4 270