1. EXCVATION WORK
1.01. Site clearing, grubing and removing trees,
bushes and so on… 1 12.50
around demessie site 4.10
1 29.50 7.10
3.50 363.88 m3
103.25 m2
around asheber site
1 19.00 1 10.00
4.10 3.50
77.90 m2 4.87
170.45 m3
181.15 m2 Total
1 12.50
4.10 2 27.50
7.10 2.30
363.88 m3 126.50 m2
677.30 m3 Total
Ditto but soft rock or soft material not classified
as hard material or ordinary soil irrespective of 2 15.00
depth 2.30
around demessie site 0.225
L = 11.5m 15.53 m3
1 14.50 W = 4.10m
4.10 Davg. = 5.97m 2 15.00
5.97 0.35
354.92 m3 0.10
around asheber site 1.05 m3
L = 6.5m
1 6.50 W = 3.50m 2 15.00
3.50 Davg. = 7.10m 0.60
7.10 0.04
161.53 m3 0.72 m3
5. REINFORCEMENT
5.01. STEEL BAR required for
Total Steel reinforcement
structure.
a. High yield steel reinforcement bar
2,991.62 kg
Total
2. CONCRETE WORK
2.01. C-5 lean concrete under retaining wall
around demessie site
Total
L = 24m
W3 = 0.6m
Davg. = (0.265+0.325)/2 = 0.3m
Total