1. Understand company profile and scope of work

Monday 17/02/20
- - - -

1. Presented company profile and introduce all product that Tsubaco can supply to
- customer.
T.P.S.S Engineering Engineering P'Tay
2. TPSS required pump which can use for viscous substance, for example sauce.
Tuesday 18/02/20

TRINC 1. TRINC, Customer (sumsung) interested static-eliminating devices equipped for All staff
new product so present how product used and suitable for them

1. Learn how to use SWIFT program and create PO.


Wednesday 19/02/20 2. Learn how to calculate chain's price. Minnie's trainer

Sandee Rice End User 1. Sandee Rice, Customer required to add conveyor chain around 16m+13m(x2) Baitoey/Tsubaki
Thursday however its special chain's type so Tsubaco had to measure customer's chain.
20/02/20 1. Learn how to use SWIFT program and create PO.
Minnie's trainer

1. Sent power lock to customer and asked why customer didn't order thermal
Tounetsu End User couple like before. They has changed new supplier because lower price than P'Tay
21/02/20 Tsubaco offer.
Friday
1. Transfer scope of work from P'Milk to P'tay and introduce new staff which has
Cleanvy End User to substitute. P'Tay
WEEKLY EMPLOYEE NAME : KANTIMA FONGPRAPUN

WORK REPORT FROM 24/02/20 TO 28/02/20

2nd DATE CUSTOMER SUPPLIER INDUSTRIAL TYPE CONTACT DETAIL/STATUS GO with

1. Presented all problem meet and how to solve these problems, then
Monday 24/02/20 reported customer's advancement Head Office
2. Assigned weekly customer schedule.
TAKEBE (THAILAND) CO.,LTD. Chassy, Frame 1. TAKABE, Sent invoice and asked inquiry for a new lot of Tsubaki's chain order. P'Ked/Amata
GOSHEN INDUSTRIAL Sprocket, Chain k'เหมียว (sales executive) 2. GOSHEN, Tsubaco required special chain for LAO's power plant for using in the furnace. These P'Poom,P'Ked/Amata
Tuesday 25/02/20
chain should be cheap and made form china that same the spec. customer used. They will check the spec. of these
chains and contact later.
KIDEN (THAILAND) CO., LTD. Stainless Tank 1. KIDEN, transfer customer P'Tay/ T'Tos
2. V.VATTANA, desired to ordered 20 power cylindes for NISSAN MOTOR and all proces will be over before
26/02/20 V VATTANA SOLUTION ENGINERING Conveyor(Machine Maker) k'สมชาย (engineer) 13/04/20. Then, k'สมชาย confirm spec. later. P'Tay/ T'Tos
Wednesday
3. AWAGI, wanted to change โซ่ถัก and cable carrier so tsubaco went to measured for customer and sent the P'Tong/P'Poom/Tsubaki
AWAJI MATERIAL (THAILAND) Coupling, Elbow quotation
CT GLASS (ช. เคมีไทย) Siligate 1.CT GLASS, wanted to install blower to cool down room temperature so SHOWA suggested wind racer which may be P'Milk/P'Tum(SHOWA)
meet customer requirement.
Thursday
27/02/20 BANDO MANUFACTURING (THAILAND) Conveyor Belt 2. BANDO, want to trap some substrance and SHOWA will be confirmed equipment spec. later.

NHK SPRING Car Seat k'เจนณรงค/์ k'วุฒิพงศ์ 1. NHK, will increase production line in the end of this year. P'Tay
Friday 28/02/20 (engineer)
WEEKLY EMPLOYEE NAME : KANTIMA FONGPRAPUN

WORK REPORT FROM 2/3/2020 TO 6/3/2020

1st DATE CUSTOMER SUPPLIER INDUSTRIAL TYPE CONTACT DETAIL/STATUS GO with

1. Learn Tsubaki's products (Drive chain &sprocket/Small chain Conveyor)


Monday 2/3/2020 Head Office

1. NHK SPRING, 0.4kw motor was break down and they wanted to upsize motor 0.4kw to 1.5 kw however TSUBAKI could not respond in this
NHK SPRING
position because out of scope supply and product still in the other supplier's warrantee.
Tuesday 3/3/2020 AUTOMOTIVE PART (SEAT) Head Office

1. HONDA, has used RS-100-RP around 2 years and they found unbalance left and right because of unequal stretching of both sides chain so
TSUBAKI, recommended RS-100-SUP instead, its extend the chain's life more than RS-100-RP.

โซ่ยด

BODY
BODY

4/3/2020

2.HONDA, want to use free flow chain for conveyor the dolly instead of human man-hour, distance around 80m and they have budget for
Wednesday HONDA @PRACHINE BURI AUTOMOTIVE
this project around 3,000,000 Baht (37,500 baht/m) . P'Tos/N'Poom

4
NO HUMAN USED
1

P'Poom
Thursday KEYENCE
1. Consulted the sensor system w/ KEYENCE. Customer want to assemble the motorcycle gear and need to inspect with the sensor system.
5/3/2020
P'Ked
2. Visited Tsubaki's warehouse
1. Checked the products delivered.
Friday 6/3/2020 CONNECT P'Milk
WEEKLY EMPLOYEE NAME : KANTIMA FONGPRAPUN

WORK REPORT FROM 9/3/2020 TO 13/03/20

nd
2 DATE CUSTOMER SUPPLIER INDUSTRIAL TYPE CONTACT DETAIL/STATUS GO with

1. Presented all problem meet and how to solve these problems, then
Monday 9/3/2020 reported customer's advancement Head Office

Y.M.P. (Thailand) Co., Ltd. SHOWA DENKI FURNACE K' ขวั ญชนก 1. Delivered the blower to customer. P' Poom
Tuesday 10/3/2020 TRUSCO 2. Checked pipe cleaner, joint cleaner, brush etc.
P'Tay
1. Calculated chain's price.
Wednesday 11/3/2020 2. Searched new customer information at Asia Industrial Estate Head Office

Thursday 12/3/2020 HITASHI COMPRESSOR  RECIPROCATING COMPRESSOR K'ไพฑูล (QA DEPARTMENT) 1. Visited old customer and presented oxygen absorber. Baiteoy
FOR REFRIGERATORS

1.1 HONDA, looking for 2 die heating burners (Gas Type, use LNG as fuel) which used for preheating the mold
from 30°C to 350 °C
1.2 HONDA, have budget around 280,000/unit (1 unit include 1 burner and 1 supporting car for converyor the
burner. Burner temperature around 300-500 °C.
1.3 Period
13/03/20 HONDA AUTOMOBILE (AYUTTHAYA) AUTOMOTIVE K'มณฑล (CASTING DEPARTMENT) MAY JUNE Baiteoy/P' Aek

3 days 10 days 7 days 10 days

RFQ Clear and confirm Quotation Compare Bidding


spec. maker
Friday
WEEKLY EMPLOYEE NAME : KANTIMA FONGPRAPUN

WORK REPORT FROM 16/3/2020 TO 20/03/20

rd
3 DATE CUSTOMER SUPPLIER INDUSTRIAL TYPE CONTACT DETAIL/STATUS GO with

1. Presented all problem meet and how to solve these problems, then
Monday 16/3/2020 reported customer's advancement HEAD OFFICE
2. updated how to increasing sales of small size conveyor chain by air program.
TRUSCO 1. Checked pipe cleaner, joint cleaner, brush etc. P'Tay
Tuesday 17/3/2020 2. Quotation for PTS @AMATA

1. Surveyed company's location in Asia Industrial Estate (Suvarnabhumi)


Wednesday 18/3/2020

19/3/2020 FUJIKURA KASEII COLOR 1. Searched new customer information at Asia Industrial Estate and selected 3 company which interested. HEAD OFFICE
Thursday THAI DELMAR FOOD
THAI AMTEC DETERGENT
1. Pick up check form SORIME.
2. Surveyed company's location at Bangplee
20/03/20 3. Serched new customer information at Bangplee and selected 5 company which interested -
Friday 4. Quotation for IDAKA.
WEEKLY EMPLOYEE NAME : KANTIMA FONGPRAPUN

WORK REPORT FROM 23/3/2020 TO 27/03/20

th
4 DATE CUSTOMER SUPPLIER INDUSTRIAL TYPE CONTACT DETAIL/STATUS GO with

1. Presented all problem meet and how to solve these problems, then
Monday 23/3/2020 reported customer's advancement HEAD OFFICE

AM HEAD OFFICE 1. Quotation for Tounetsu, OHK Haiya. HEAD OFFICE


Tuesday 24/3/2020
PM TRUSCO TRADING K'ปลา 2. Checked pipe cleaner, joint cleaner, brush etc. w/ customer P'TAY
AM TRUSCO TRADING K'ปลา 1. Checked pipe cleaner, joint cleaner, brush etc. w/ customer
25/3/2020
Wednesday
PM HEAD OFFICE 2. Colleted current situation of using small size conveyor chain.
PM HEAD OFFICE 3. Quotation for IDAKA, OHK Haiya.
AM/PM HEAD OFFICE 1. Contacted the customer in Asia Estate industrial and attach in advancement file @ATTACHMENT. HEAD OFFICE
Thursday 26/3/2020
PM HEAD OFFICE 2. Prepared schedule project delivery plan for RAKEN ENGINEEIRNG to P'Tong HEAD OFFICE
AM/PM TSUBAKI's WAREHOUSE 1. Trained Tsubaki's product and how to cut and connect chain. P'TAY P'TONG

Friday 27/03/20
PM MAYEKAWA 2. Bring the invoice to customer signed
WEEKLY EMPLOYEE NAME : KANTIMA FONGPRAPUN

WORK REPORT FROM 30/3/2020 TO 3/4/2020

st
1 DATE CUSTOMER SUPPLIER INDUSTRIAL TYPE CONTACT DETAIL/STATUS GO with

AM HEAD OFFICE 1. Presented all problem meet and how to solve these problems, then
Monday 30/3/2020 reported customer's advancement
PM HEAD OFFICE
AM WFH 1. Quotation for Tounetsu, OHK Haiya.
Tuesday 31/3/2020
PM LAT KRABANG 2. Surveyed company's location in Lat Krabang Industrial Estate (Suvarnabhumi)
AM AMPUS AUTOMOTIVE (MIRROR) 1. Delivered the O-ring, bearing to customer.
1/4/2020
Wednesday
PM SIAM TMC  JIG/DOLLY/SPARE PART 2. Biiling note to customer

AM/PM WFH 1. Quotatuin for IKE, IDAKA.


Thursday 2/4/2020 2. Learned chain's catalog (Drive, Small).

AM TSUBAKI's WAREHOUSE 1. Trained Tsubaki's product (Drive Chain).


Friday 3/4/2020
PM TSUBAKI's WAREHOUSE 2. Trained Tsubaki's product (Small Size Conveyor Chain).
WEEKLY EMPLOYEE NAME : KANTIMA FONGPRAPUN

WORK REPORT FROM 6/4/2020 TO 10/4/2020

2nd DATE CUSTOMER SUPPLIER INDUSTRIAL TYPE CONTACT DETAIL/STATUS GO with

Monday 6/4/2020

AM WFH 1. Learned chain's catalog (large size).


Tuesday 7/4/2020 2. Listed New Customer in Food Industry at Samutprkarn.
PM HEAD OFFICE 3. Quotation for RAKEN
AM/PM WFH 1. Called up new customer @ATTACHMENT
8/4/2020
Wednesday

AM/PM WFH 1. Called up new customer @ATTACHMENT


Thursday 9/4/2020

AM HEAD OFFICE
PM MINEZAWA TRADING 1. Delivered cableveyor to Minezawa.
Friday 10/4/2020
NGK AUTOMOTIVE (CERAMIC) 2. Delivered sprocket to NGK.
IKE AUTOMOTIVE 3. Delivered cableveyor and separator to IKE.
WEEKLY EMPLOYEE NAME : KANTIMA FONGPRAPUN

WORK REPORT FROM 13/4/2020 TO 17/4/2020

3rd DATE CUSTOMER SUPPLIER INDUSTRIAL TYPE CONTACT DETAIL/STATUS GO with

AM/PM WFH 1. Listed new customer.


Monday 13/4/2020

AM/PM HEAD OFFICE 1. Called up new customer @ATTACHMENT.


Tuesday 14/4/2020

AM/PM HEAD OFFICE 1. Called up new customer @ATTACHMENT.


15/4/2020
Wednesday

AM TSUBAKI's WAREHOUSE 1. Trained Tsubaki's product (Power Cylinder).

PM BANGKOK RANCH FOOD


k'ส้ม (PURCHASE), 2. Bangkok Ranch, wanted to modify conveyor system, to reduce the slope level of the conveyor system P'Tay
16/4/2020 02-175-7200 ต่อ 2413

Thursday

AM/PM TSUBAKI's WAREHOUSE 1. Trained Cam Clutch.


TOUNETSU FURNACE 2. Delivered power lock to TONETSU.
Friday 17/4/2020
GOLD STAR TOOL TRADING 3. Delivered timing belt to GOLD STAR.
WEEKLY EMPLOYEE NAME : KANTIMA FONGPRAPUN

WORK REPORT FROM 20/4/2020 TO 24/4/2020

4th DATE CUSTOMER SUPPLIER INDUSTRIAL TYPE CONTACT DETAIL/STATUS GO with

AM/PM HEAD OFFICE 1. Listed new customer.


Monday 20/4/2020 2. Prepare Company Profile

AM THAI SHINMEWA 1. THAI SHINMEWA, Safety Training


2. GREENDAY, to meet customer for introduced company profile and presented products suah as conveyor system, Blower,
Tuesday 21/4/2020 Ageless. Customer interest AGELESS.

PM GREENDAY FOOD K'สิทธิพัฒน์ (ต๋อง) (MAINTENACE)


085-2242800
AM HINO AUTOMOTIVE 1. Delivered sprockets to HINO
2. TFM, to meet customer for introduced company profile and presented products suah as conveyor system, Blower. Customer
22/4/2020 PM THAI FLOUR MILL FOOD K'วิฑูรย์ (MAINTENACE)
Wednesday use Europe's machine and interested conveyor system.
(086-8841413)

AM HEAD OFFICE

PM BANGKOK RANCH FOOD k'สมชาย (MAINTENACE), 1. Bangkok Ranch, get more details of conveyor system such as dimension, drawing as ATTACHMENT P'Note , P'Por
23/4/2020 081-554-8078

2.865 m
Thursday
k'อั ๋น (MAINTENACE),
061-856-2318

10.583 m

AM THAI YAMAZAKI ELECTRICAL WIRE 1. Billing Note to THAI YAMAZAKI.


PM WFH 2. Get more details such as Schedule / Drawing of Thai Shinmaywa.
Friday 24/4/2020
WEEKLY EMPLOYEE NAME : KANTIMA FONGPRAPUN

WORK REPORT FROM 27/4/2020 TO 1/5/2020

5th DATE CUSTOMER SUPPLIER INDUSTRIAL TYPE CONTACT DETAIL/STATUS GO with

AM VKC
AUTOMOTIVE PART FOR TOYOTA 1. Installation of pressing machine
Monday 27/4/2020
PM KJ MACHINE TOOLS 2. Receive check from KJ machine tools.

AM/PM TSUBAKI's WAREHOUSE 1. Trained Torqe Limiter, Torqe Guard, Schock Relay
Tuesday 28/4/2020

AM/PM VKC
AUTOMOTIVE PART FOR TOYOTA 1. Test run of pressing machine

Wednesday 29/4/2020

AM/PM WFH 1. Quotation for IDAKA


Thursday 30/4/2020

AM/PM BANGKOK RANCH FOOD k'วั ฒนา (maintenace) 1. Measure dimension of wax's duck conveyor. Tsubaki suggest RF2080 (same pitch = 50.8mm as chain's customer) however the P'NOTE
width of customer's chain doesn’t fit with Tsubaki's standard so we will consider and discuss later. Maybe use RF2040 Instead.
Friday 1/5/2020 (HOLIDAY) 2. Maker (พี่ เชาว์) quit form this job because the high risk of this project. พี่ เชาว์ ให้เหตุผลว่า รอบความเร็ วในการกวาดสู ง ไม่อยากเสี่ยง. N'POOM (TSUBAKI)
We should supply chain part only.
3. Customer have use other chain parts for conveyor box (weight = 250kg) C-C 4m x 3 sets but all dimension doesn't fit the
Tsubaki's standard. We will offer this part after finish the wax's duck conveyor.
WEEKLY EMPLOYEE NAME : KANTIMA FONGPRAPUN

WORK REPORT FROM 4/5/2020 TO 8/5/2020

st
1 DATE CUSTOMER SUPPLIER INDUSTRIAL TYPE CONTACT DETAIL/STATUS GO with

AM/PM TSM Hydralic Tube See as attachment


Monday 4/5/2020 (HOLIDAY)

AM/PM TSM Hydralic Tube See as attachment


Tuesday 5/5/2020

AM/PM HOLIDAY
6/5/2020
Wednesday

AM/PM TSM Hydralic Tube See as attachment


Thursday 7/5/2020

AM/PM TSM Hydralic Tube See as attachment

Friday 8/5/2020
THAI SHINMAYWA REPORT THAI SHINMAYWA REPORT
DAY ITEM DESCRIPTION DAY ITEM DESCRIPTION
MONDAY 1 Unload Equipment/area arrangement THRUSDAY 1 New Center Line and rearrangment.
4/5/2563 7/5/2563

2 Centering 2 Reinstallation the rail.

TUESDAY 1 Install Take-up Unit, Curve and Rail to oven FRIDAY 1 Installation the rail behide the paint booth and inside the oven
5/5/2563 8/5/2563

Takeup Unit
Curve and Rail

OVEN

2 Install rail to paint booth

Rail

Paint Booth

Paint Booth
Manual
X-Lift

OVEN
Not Centering

Problem The rail wasn't centering the Paint booth so the customer's part which conveyor by the rail
can not enter.
Solution 1. Recheck the dimension from drawing and we found the oven isn't followed dimension
from drawing.
2. We must follow the new centering from oven instead. Curve and Rail