10/1/2020 WEEKLY TRAINING LOG

WEEKLY TRAINING LOG

Date : 01/09/2020 Training Week : 7


(Please specify training information by descriptive statement, tables, sketches, figure etc.)

Entry Description / Remarks


PROJECT : JAWA-1 COMBINED CYCLE GAS TURBINE POWER PLANT (1760MW) MONDAY (31/8/2020) - Malaysia's National Day TUESDAY (1/9/2020) i. Completing
i. Painting & Blasting Inspection Report ii. Identify loose spools pipe Painting & Blasting Inspection Report for traffic purple pipe, structural and ladder and
handrail by Microsoft Excel. WEDNESDAY (2/9/2020) i. Completing Painting &
Blasting Inspection Report for signal green pipe and light blue pipe through Microsoft
Excel. THURSDAY (3/9/2020) i. Double check RT film by its sheet number, its joints
and its spools by referring to fit-up visual of Area 11, Area 21 and Area 11 Regen ii.
Went to manufacturing factory to find the loose spools pipe which has no tagging. Put
on the tagging. FRIDAY (4/9/2020) i. Went to manufacturing factory and continuing
identify which loose pipe which has no tagging. Put on the tagging.

Note : Please include attachment whenever necessary

______________________________________ ______________________________________
Signature Student Signature Industry Supervisor
Date : Date :