You are on page 1of 1

10/1/2020 WEEKLY TRAINING LOG

WEEKLY TRAINING LOG


Date : 14/09/2020 Training Week : 9

(Please specify training information by descriptive statement, tables, sketches, figure etc.)

Entry Description / Remarks


i. Preparing packaging label MONDAY (14/9/2020) i. Preparing packaging label by laminating all the ship out label
containing MTA Label, Packing list and Shipping mark for Cable gland, Cable Tray
SBN, Gasket,clamps and isolation pad, Hook up Tubing and Fittings, Loose structure,
tubing,Fittings and clamp, U-Bolt and ULI Cable Tray. TUESDAY (15/9/2020) i.
Continuing laminating ship out label ii. Went with Miss Dinie (Project Engineer) to
manufacturing factory to put on label on the label for the U-Bolt, Pressure Gauges and
Gasket for its MTA Label, Packing list and Shipping Mark. WEDNESDAY (16/9/2020) i.
Public Holiday (Malaysia's Day) THURSDAY (17/9/2020) i. Continuing preparing ship
out label by laminating MTA Label, Packing list and Shipping mark FRIDAY
(18/9/2020) i. Continuing preparing ship out label by laminating MTA Label, Packing list
and Shipping mark

Note : Please include attachment whenever necessary

______________________________________ ______________________________________
Signature Student Signature Industry Supervisor
Date : Date :

https://portal.utem.edu.my/iSMP/LIndustri/Frm_LI_CetakBukuLog.asp?strnomatrik=B051710149&strminggu=W09 1/1

You might also like