JABATAN KERJA RAYA MALAYSIA

KERJA-KERJA PENGGANTIAN 29 UNIT LIF DAN LAIN-LAIN KERJA


BERKAITAN DI APARTMENT A,
PANGKALAN TLDM LUMUT, PERAK

NO. KONTRAK: JKR / IP / CKM / 192 / 2019

WORK METHOD STATEMENT


(CORBEL HACKING WORKS)

KONTRAKTOR

FESMA SDN BHD


71-1, JALAN SBC 1,
TAMAN SRI BATU CAVES,
68100 BATU CAVES, SELANGOR
Rev: 2020-01
Hack-Core-EN
CORBEL HACKING WORKS
Date: 6 Aug 2020
Page: i
WMS WORK METHOD STATEMENT
PROJECT TLDM LUMUT Pack

WORK METHOD STATEMENT

CORBEL HACKING WORKS

VER. 2020-01

6 AUGUST 2020

Prepared By Revised By
Revision Description Date
Name Date Name Date
1 Initial Release Mohd Hasif 6 Aug 2020 IR SM Salim Abu Yusof 10 Aug 2020 10 Aug 2020

71-1, JALAN SBC 1, TAMAN SRI BATU CAVES, 68100 BATU CAVES, SELANGOR. TEL : 03-61774655 FAX : 03-61774135 EMAIL : fesma.mne@gmail.com
Rev: 2020-01
Hack-Core-EN
CORBEL HACKING WORKS
Date: 6 Aug 2020
Page: ii
WMS WORK METHOD STATEMENT
PROJECT TLDM LUMUT Pack

Table of Contents

1.0 INTRODUCTION ............................................................................................ 1


2.0 HAZARD IDENTIFICATION ............................................................................ 2
3.0 SAFETY PRECAUTION ................................................................................... 3
4.0 HIRARC FORM .............................................................................................. 4
3.0 MATERIALS ................................................................................................... 5
4.0 EQUIPMENT ................................................................................................. 5
5.0 WORK FLOW ................................................................................................ 6
6.0 WORK METHODOLOGY ................................................................................ 7
7.0 DETAIL DRAWING......................................................................................... 9

71-1, JALAN SBC 1, TAMAN SRI BATU CAVES, 68100 BATU CAVES, SELANGOR. TEL : 03-61774655 FAX : 03-61774135 EMAIL : fesma.mne@gmail.com
Rev: 2020-01
Hack-Core-EN
CORBEL HACKING WORKS
Date: 6 Aug 2020
Page: 1
WMS INTRODUCTION
PROJECT TLDM LUMUT Pack

1.0 INTRODUCTION

Project Description
This project involves the replacement works of twenty-nine (29) lift units and other related works
at Apartment A, Pangkalan TLDM Lumut, Perak. The blocks involved in this project are A1, A3,
A4, A5, A6, A7, A8, A9, A10, A11, A12, A13, A14, A25 and A26.
The project scope includes dismantling of the old lifts, installation of the new lifts, obtaining
approval from the JKKP, and other related works. The main priority of the project team is to
complete the project within the allocated time and budget as per contract.
The project duration for this project is 97 weeks from the date of commencement. Whereas the
defect liability period is a year from the date of handover to client. In this project, the lift model
of ACRA-PA17-C090 from Sigma Elevator will be supplied.

Objective
The purpose of this work method statement is to provide guidance of the corbel hacking works
at lift landing door.

71-1, JALAN SBC 1, TAMAN SRI BATU CAVES, 68100 BATU CAVES, SELANGOR. TEL : 03-61774655 FAX : 03-61774135 EMAIL : fesma.mne@gmail.com
Rev: 2020-01
Hack-Core-EN
CORBEL HACKING WORKS
Date: 6 Aug 2020
Page: 2
WMS HAZARD IDENTIFICATION
PROJECT TLDM LUMUT Pack

2.0 HAZARD IDENTIFICATION


In order to identify hazards in organized fashion, they have been grouped into three categories.
The most common hazards that may occur during the process include:
1. Slip, trip, or fall

A person can slip, trip or fall to the ground as a result of unexpected


change in the contact between the feet and the ground. Examples
of these hazards are:

 Slippery floors
 Poor footing
 Inappropriate footwear

2. Struck by a moving object or hit an object

This hazard involves object in motion or people in motion, such as


being struck by a moving object or material falling on a person.
Examples of these hazards are:

 Incompatible hacking and drilling equipment


 Improperly secured equipment
 Resistance when cutting material

3. Exposure to noise and dust

A person can be exposed to excessive noise or remain inhaling


harmful dust for an extended period of time while doing task.
Examples of these hazards are:

 Silica dust
 Asbestos
 Resulting noise from demolishing work

71-1, JALAN SBC 1, TAMAN SRI BATU CAVES, 68100 BATU CAVES, SELANGOR. TEL : 03-61774655 FAX : 03-61774135 EMAIL : fesma.mne@gmail.com
Rev: 2020-01
Hack-Core-EN
CORBEL HACKING WORKS
Date: 6 Aug 2020
Page: 3
WMS SAFETY PRECAUTION
PROJECT TLDM LUMUT Pack

3.0 SAFETY PRECAUTION

Follow the Covid-19 SOP as suggested by KKM and wear the


required minimum PPE such as safety helmet, vest, gloves,
and safety shoes. Additionally, wear the additional PPE when
appropriate.

Maintain a good housekeeping practice at site. Make


sure that all the construction materials and equipment
are stored properly when not in use to prevent materials
damage as well as slip or trip hazards.

Use appropriate tools or machines when lifting. Tasks


that require lifting more than 25 kg should be supported
by tools or machines to limit the potential injuries.

Conduct safety audit and procedures to report,


evaluate, and address any accidents or near misses that
occur at the site.

71-1, JALAN SBC 1, TAMAN SRI BATU CAVES, 68100 BATU CAVES, SELANGOR. TEL : 03-61774655 FAX : 03-61774135 EMAIL : fesma.mne@gmail.com
Rev: 2020-01
Hack-Core-EN
CORBEL HACKING WORKS
Date: 6 Aug 2020
Page: 4
WMS HIRARC FORM
PROJECT TLDM LUMUT Pack

4.0 HIRARC FORM

HIRARC FORM
Company : Fesma Sdn Bhd
Conducted by :
Process / Pengkalan Tentera Laut DiRaja (Name,
Location : Malaysia (TLDM), Lumut Designation)

Approved by : Date: …. / …. / 2020 to …. / …. / 2020

Date : …. / …. / 2020 Review Date : …. / …. / 2020

1. Hazard Identification 2. Risk Analysis 3. Risk Control

Which Existing PIC


Work can Risk Likeli Seve Recommendati (Due
No. Hazard Risk
Activities cause / Control hood rity on Date /
effect (if any) Status)

Wear safety
Slip trip Physical boots and
1 ii L
and fall injuries practice good
housekeeping

Struck by Wear PPE and


Hacking and moving Physical use the
Coring 2 i L
1. objects or Injuries appropriate
Works hit objects tools

Wear earplugs
Exposure Hearing
and respiratory
to noise or Lung 1 ii L
protection
and dust Damage
while working

71-1, JALAN SBC 1, TAMAN SRI BATU CAVES, 68100 BATU CAVES, SELANGOR. TEL : 03-61774655 FAX : 03-61774135 EMAIL : fesma.mne@gmail.com
Rev: 2020-01
Hack-Core-EN
CORBEL HACKING WORKS
Date: 6 Aug 2020
Page: 5
WMS MATERIALS AND EQUIPMENT
PROJECT TLDM LUMUT Pack

3.0 MATERIALS

1. Cement plaster

4.0 EQUIPMENT

1. Hacking machine
2. Hand tools
3. Hammer
4. Electric drill
5. Tape measure
6. Ladder
7. Oxy Cutter

71-1, JALAN SBC 1, TAMAN SRI BATU CAVES, 68100 BATU CAVES, SELANGOR. TEL : 03-61774655 FAX : 03-61774135 EMAIL : fesma.mne@gmail.com
Rev: 2020-01
Hack-Core-EN
CORBEL HACKING WORKS
Date: 6 Aug 2020
Page: 6
WMS WORK FLOW
PROJECT TLDM LUMUT Pack

5.0 WORK FLOW

71-1, JALAN SBC 1, TAMAN SRI BATU CAVES, 68100 BATU CAVES, SELANGOR. TEL : 03-61774655 FAX : 03-61774135 EMAIL : fesma.mne@gmail.com
Rev: 2020-01
Hack-Core-EN
CORBEL HACKING WORKS
Date: 6 Aug 2020
Page: 7
WMS WORK METHODOLOGY
PROJECT TLDM LUMUT Pack

6.0 WORK METHODOLOGY

Prework Procedure
1. Carry out site inspection at the hacking location if needed.
2. Submit the proposed method statement for hacking work to S.O. for approval.
3. Mark the hacking area on plan specific to the site.
4. Place temporary barricade and warning signs around the work area.

Mid-work Procedure
1. The hacking work will be carried out using hacking machine and other associated
equipment.
2. Temporary support or propping should be installed if needed to support other
structure and prevent crack effect on the concrete while doing the hacking work.
3. Machines and equipment that have high loading should not be unloaded on floor
while hacking works is carried out.
4. All removed concrete must be dismantled carefully from the existing structure using
equipment as applicable to prevent crack effect on concrete.
5. The reinforcement shall be remained while the demolishing work is commencing.
6. Once the concrete has broken away, the reinforcement shall be cut off and rebar
works must follow as original detailing.

After Work Procedure


1. Clean rubbish, debris, and surplus material regularly.
2. Protect the rebar using primer immediately after cleaning.
3. Apply a continuous coat of cement plaster or appropriate primer before continue
reinforcement work and recast of the concrete.
4. Keep the site clean and tidy at all time.
5. Make good of any damage done to the structure.

71-1, JALAN SBC 1, TAMAN SRI BATU CAVES, 68100 BATU CAVES, SELANGOR. TEL : 03-61774655 FAX : 03-61774135 EMAIL : fesma.mne@gmail.com
Rev: 2020-01
Hack-Core-EN
CORBEL HACKING WORKS
Date: 6 Aug 2020
Page: 8
WMS DETAIL DRAWING
PROJECT TLDM LUMUT Pack

7.0 DETAIL DRAWING

Corbel Hacking Works at Lift Landing Door

Figure shows the detail of Existing Corbel location at lift landing door