IF Fast-form

Fast form Formworks

Drop Head

Props

Aluminum Frame
+ Plywood Panel Truss Support Filler beam
Product Advantages

 Early stripping design:


Early-stripping design:
After 36 to 48 hours of the concrete pouring or the concrete strengthen achieve
50% (GB50204-2002 National Standard), the panels could be dismantled to move
the next floor, so as to save one floor panel. For example, Brazil construction
date-seven to ten days to finish one floor, so the whole project just need one floor
panels and two floor shoring jacks(props).

 Light Weight:
The max panel is 1.8mX1.2m, 30kg weight. One worker can hand move.

 Fast to Install:
Only need four workers as one team to install, no need any install experiences.

 IInstallation time:
ll i i
One worker can install 25 ㎡/hour, and dismantle 50 ㎡, so it can reduce
construction time.
Construction Solution
Beam Bottom Solution
 Beam Bottom Solution 1: use beam bottom panel, integrated application.

600 1200b
600x1200beam b
bottom
tt panell

If beam bottom depth ≥350mm,


≥350mm choose this solution.
solution If the beam depth≤350mm,
depth≤350mm choose this solution.
solution
Beam Bottom Solution
 Beam Bottom 2 :Work with traditional wood panel

Filler Beam: Connect the wood panel with the IF panel


Wall Solution
 Wall Solution Steel Prop + Drop 1800x600mm
800 600 Panel
a e
H d
Head Filler Beam

Wood panel
Filler Beam

Steel Prop + Drop


Wall batten head

Wall side Connection


Column Solution
 Column Solution Wood Batten (g
(green color))

Filler Beam Wood panel

Wood Batten

Column Solution
((Distance between Column and column ≥300mm))
Over High Floor
 Over height Floor
1 meter and 1.5 meter extension feet Two Steel props with truss support
Cantilever Platform
 Cantilever Platform Solution:
Wood batten

Steel Guardrail

Cantilever Bar
Projects(2019-2020)
Projects(2019 2020)
 Philippines Davao:
Multi-Beams Structure 4 workers as one team Large jobsite space Over Height Floor
Projects(2019-2020)
Projects(2019 2020)
 Thailand, Bangkok
Work together with wall formworks Cantilever Structure Work together with aluminum formworks

W k with
Work ith traditional
t diti l wood
d forms
f J b it will
Jobsite ill has
h large
l space C
Concrete
t surface
f smoothly
thl
Projects(2019-2020)
Projects(2019 2020)
 Australia
. Projects(2019-2020)
Projects(2019 2020)
 USA, New York

7 Meter High
Projects(2019-2020)
Projects(2019 2020)
 Mauritius
Thank you
Welcome

Contact:
Ragnar Zhang

Email:
ragnar@kitsen.com

M/Phone: +86
13809225083

Address:
KITSEN
Technologies, Co.,
Ltd, Yangdong
District, Yangjiang
City, Guangdong
Province, China

You might also like