ERECTION INSPECTION CHECK LIST

PT. Nippon Indosari Corpindo Tbk PT. Patama Adijaya Steel


Date : 25-02-2020 Revisi :

PROJECT TITLE : Ekspansi Line WB Sari Roti DRAWING NO. :


Plant Palembang
LOCATION : TIME INSPECTION :
GRID / LINE : DATE :

INTERNAL CHECK BY CONTRACTOR


(internal check by contractor must be conduct to avoid major finding or at least minimize minor finding during joint inspection)

1. PERSIAPAN SESUAI TIDAK PERBAIKAN


K3
Crane
Kunci moment
Pipa support
lain-lain

2. PEMASANGAN SESUAI TIDAK PERBAIKAN


Posisi As Kolom
Posisi Angkur
Kelurusan Angkur
Verticality Kolom
Elevasi

3. PERAKITAN SESUAI TIDAK PERBAIKAN


Material
Dimensi
Ukuran Baut
Jumlah Baut
Pengencangan Baut

JOINT INSPECTION (by contractor and MK)

Notes:

Result of Inspection:

Approved to Realese Concrete


Not Approved

Prepared by PT PATAMA Checked/Reviewed/Approved by PT INDO SWISSATAMA

QA/QC MK

Name

Sign

Date