6 DAY OPERATIONAL FORECAST

Well................................ Rig
Date............ 12-May-20
Initial POL... 111 Max POL next 6 days #N/A

Tuesday 12 May Wednesday 13 May Thursday 14 May Friday 15 May Saturday 16 May Sunday 17 May
0:00 P & A the Well 0:00 P & A the Well 0:00 P & A the Well 0:00 P & A the Well 0:00 P & A the Well 0:00 P & A the Well
1:00 1:00 1:00 1:00 1:00 1:00
2:00 2:00 2:00 2:00 2:00 2:00
3:00 3:00 3:00 3:00 3:00 3:00
4:00 4:00 4:00 4:00 4:00 4:00
5:00 5:00 5:00 5:00 5:00 5:00
6:00 6:00 6:00 6:00 6:00 6:00
7:00 7:00 7:00 7:00 7:00 7:00
8:00 8:00 8:00 8:00 8:00 8:00
9:00 9:00 9:00 9:00 9:00 9:00
10:00 10:00 10:00 10:00 10:00 10:00
11:00 11:00 11:00 11:00 11:00 11:00
12:00 12:00 12:00 12:00 12:00 12:00
13:00 13:00 13:00 13:00 13:00 13:00
14:00 14:00 14:00 14:00 14:00 14:00
15:00 15:00 15:00 15:00 15:00 15:00
16:00 16:00 16:00 16:00 16:00 16:00
17:00 17:00 17:00 17:00 17:00 17:00
18:00 18:00 18:00 18:00 18:00 18:00
19:00 19:00 19:00 19:00 19:00 19:00
20:00 20:00 20:00 20:00 20:00 20:00
21:00 21:00 21:00 21:00 21:00 21:00
22:00 22:00 22:00 22:00 22:00 22:00
23:00 23:00 23:00 23:00 23:00 23:00
EQUIPMENT TO RIG EQUIPMENT TO RIG EQUIPMENT TO RIG EQUIPMENT TO RIG EQUIPMENT TO RIG EQUIPMENT TO RIG

EQUIPMENT FROM RIG EQUIPMENT FROM RIG EQUIPMENT FROM RIG EQUIPMENT FROM RIG EQUIPMENT FROM RIG EQUIPMENT FROM RIG

(To Rig) CREWCHANGE (From Rig) (To Rig) CREWCHANGE (From Rig) (To Rig) CREWCHANGE (From Rig) (To Rig) CREWCHANGE (From Rig) (To Rig) CREWCHANGE (From Rig) (To Rig) CREWCHANGE (From Rig)
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
POB #N/A POB #N/A POB #N/A POB #N/A POB #N/A POB #N/A
Tuesday 12 May Wednesday 13 May Thursday 14 May Friday 15 May Saturday 16 May Sunday 17 May
WELL PS222-H TIME ESTIMATES

Start Time Operation Description Time Time Rate


21:00 Thu 16 Jul Rig down, move and rig up 261 267.00
00:00 Tue 28 Jul Check the rig for Acceptance 12 60.00
12:00 Thu 30 Jul R/U Gesco Hammer, P/U 20" conductor, Drill and Hammer to 162 ft 24 44.00
08:00 Sat 01 Aug M/U 17 1/2" Ass., wait for bit sub, clean cond & ream down 3 13.50
21:30 Sat 01 Aug got return f/ celler & perform top cmt job, wait for cmt 3 9.50
07:00 Sun 02 Aug RIH with 17 1/2" BHA, tag Bottom. 2 2.00
09:00 Sun 02 Aug Drill 17 1/2" surface hole to 2922ft, low rop. 75 84.00
21:00 Wed 05 Aug Circ. Hole Clean. 3 3.00
00:00 Thu 06 Aug dropped totco & spot hvp on btm 1 1.00
01:00 Thu 06 Aug POOH to surface for Bit change. 8 7.00
08:00 Thu 06 Aug RIH with 17 1/2" BHA, tag Bottom. 7 7.00
15:00 Thu 06 Aug wash & ream last 6 jt's 2 2.00
17:00 Thu 06 Aug Drill 17 1/2" surface hole to 3425', had bit balled up. 45 60.00
05:00 Sun 09 Aug wiper trip & dropped totco & POOH to surface forclean out balled bit. 19 19.00
00:00 Mon 10 Aug RIH with 17 1/2" slick asssy. tag Bottom. 15 14.00
14:00 Mon 10 Aug WAIT ON DIESEL, circ & cond mud 15 32.50
22:30 Tue 11 Aug Drill 17 1/2" surface hole to t/3548', had eng#2 repair 7 7.00
05:30 Wed 12 Aug Circ. Hole Clean & pooh & rih back to btm. 22 22.00
03:30 Thu 13 Aug Drill 17 1/2" surface hole to t/3554', had eng#3 repair 1 1.00
04:30 Thu 13 Aug Circ. Hole Clean while repair eng no.3 4.5 4.50
09:00 Thu 13 Aug Drill 17 1/2" surface hole to CP. 48 60.50
21:30 Sat 15 Aug Circ. Hole Clean. 3 3.00
00:30 Sun 16 Aug Perform Wiper Trip to top Moghra Shale. 7 21.50 #REF!
22:00 Sun 16 Aug POOH for casing. 8 8.00 #REF!
06:00 Mon 17 Aug R/U 13 3/8" casing running Equip. & RIH W/CSG 36 2.50 #REF!
08:30 Mon 17 Aug M/U, RIH and test shoe track. 2 2.50 #REF!
11:00 Mon 17 Aug RIH with 13 3/8" casing tot 55/126 Joints change sakson elevator. 20 19.50 #REF!
06:30 Tue 18 Aug RIH with 13 3/8" casing tot 60/126 Joints had rig spider elevator stucked. 2 2.00 #REF!
08:30 Tue 18 Aug repair rig elevator then csg stucked work on same till get free 13 13.00 #REF!
21:30 Tue 18 Aug pooh with 13 3/8" casing tot 60 Joints for cond trip. 12 15.00 #REF!
12:30 Wed 19 Aug rih w/ cond trip held down @ 2218' [ 3 hr's repair time] 9 8.50 #REF!
21:00 Wed 19 Aug wash & ream to btm 20 17.00 #REF!
14:00 Thu 20 Aug Circ. & cond mud, spot hvp drop totco 7 7.00
21:00 Thu 20 Aug POOH for casing. 8 6.00
03:00 Fri 21 Aug R/U 13 3/8" casing running Equip. 2 1.50
04:30 Fri 21 Aug M/U, RIH and test shoe track. 2 1.00
05:30 Fri 21 Aug RIH with 13 3/8" casing 126 Joints. 20 24.00
05:30 Sat 22 Aug RIH with 13 3/8" casing 126 Joints. 6 12.00
17:30 Sat 22 Aug M/U Cement Head and cement lines. 2 6.00 #REF!
23:30 Sat 22 Aug Perform Cement Job. 6 6.00 #REF!
05:30 Sun 23 Aug WOC, R/D Cementing Equipment. 12 14.00
19:30 Sun 23 Aug Cut 13 3/8" casing, N/D Diverter system and bell nipple. 6 4.00
23:30 Sun 23 Aug Install, Weld and test 13 5/8" Braden Head. 6 6.00
05:30 Mon 24 Aug N/U BOP and test same. 6 8.00
13:30 Mon 24 Aug Set wear Bushing. 1 1.00
14:30 Mon 24 Aug M/U, RIH with 12 1/4" TCI Bit. 8 6.00
20:30 Mon 24 Aug DOC, Shoe track and 10ft new formation. 5 5.00
01:30 Tue 25 Aug Circ. Condition mud. 3 2.00
03:30 Tue 25 Aug Perform FIT. 2 2.00
05:30 Tue 25 Aug Drill 12 1/4" vertical hole to depth 6500ft. 120 130.00
15:30 Sun 30 Aug Circ. Hole Clean. 3 3.00 #REF!
18:30 Sun 30 Aug POOH for Bit & BHA change. 6 12.00 #REF!
06:30 Mon 31 Aug Resume drilling 12 1/4" hole to 5941 ft. 133 150.00 #REF!
12:30 Sun 06 Sep D/P parted , fishing operations 30 35.00
23:30 Mon 07 Sep RIH W/ DRLG ASSY. TO CONT. DRLG T/6200 48 48.00
23:30 Wed 09 Sep POOH FOR CHANGE BHA 9 8.00
07:30 Thu 10 Sep M/U & RIH W/ DIRECTION ASSY. TO CONT DRLG T/8800' 96 96.00
07:30 Mon 14 Sep COND TRIP & Perform OH Logs. 20 20.00
03:30 Tue 15 Sep Change Rams. 2 5.00 #REF!
08:30 Tue 15 Sep R/U Casing Running Equip. 2 4.00
12:30 Tue 15 Sep RIH with Casing, 220 Jts. 21 30.00
18:30 Wed 16 Sep R/D Casing Running. 1 4.00
22:30 Wed 16 Sep R/U Cementing Equip. 2 #REF!
00:00 Thu 17 Sep Perform Cement Job. 7 #REF!
07:00 Thu 17 Sep WOC. 8 #REF!
15:00 Thu 17 Sep Hang BOP, Slack Off, Install Casing Hanger. 4 #REF!
19:00 Thu 17 Sep N/D BOP. 4 #REF!
23:00 Thu 17 Sep Install THS. Test Same. 5 #REF!
04:00 Fri 18 Sep N/U BOP and test same. 5 #REF!
09:00 Fri 18 Sep Install Wear Bushing. 2 #REF!
10:30 Fri 18 Sep P/U and M/U 8 1/2" BHA. 4 #REF!
14:30 Fri 18 Sep RIH to bottom. 6

Page 2 475549378.xls
WELL PS222-H TIME ESTIMATES

Start Time Operation Description Time Time Rate


20:30 Fri 18 Sep Drill 8 1/2" Directional hole to 10,500ft. 102 #REF!
02:30 Wed 23 Sep Circ., Hole clean. 3 #REF!
05:30 Wed 23 Sep Perform Wiper Trip. 6 #REF!
11:30 Wed 23 Sep POOH for Bit change. 12
23:30 Wed 23 Sep RIH. To bottom 9 #REF!
08:30 Thu 24 Sep Resume drilling 8 1/2" hole to 11,820ft. 79 #REF!
15:42 Sun 27 Sep Circulate Hole clean. 4
19:42 Sun 27 Sep Perform A wiper trip. 5
00:42 Mon 28 Sep POOH for logging. 12
12:42 Mon 28 Sep R/U Logging Equip. 2
14:42 Mon 28 Sep Record 8 1/2" OH Logs. 60
02:42 Thu 01 Oct P & A the Well 48

#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

Page 3 475549378.xls
WELL PS222-H TIME ESTIMATES

Comments/NPT (days) (m)


#REF!
4.33

16.42
YUSR57
TIME / DEPTH CURVE
16.50
#REF!
#REF!

#REF!

Ac t ual

30.15
Tar get

31.04
31.38
31.48
31.58
#REF!

36.85
37.10
#REF!
37.94
38.10
38.35
38.69
#REF!
38.98
39.19
39.27
39.35
#REF!
44.90
45.40
51.65
53.10
55.10
55.44
59.44
Measured Depth (m MD-RT)

60.27
60.48
60.65
61.90
#REF!
62.13
62.42
62.75
62.92
63.08
63.29
63.50
63.56
63.73
63.98

Page 4 475549378.xls
WELL PS222-H TIME ESTIMATES

Comments/NPT (days) (m)


68.23
68.60
69.10
69.48
YUSR57
72.78 TIME / DEPTH CURVE
72.95
73.15
73.65
73.74
-40010.88
-40010.88

-40010.88
-40010.88
-40010.88
-40010.88
-40010.88
-40010.88
-40010.88
-40010.88 Ac t ual

-40010.88
-40010.88
Tar get

-40010.88
-40010.88
-40010.88
-40010.88
-40010.88
-40010.88
-40010.88
-40010.88
-40010.88
-40010.88
-40010.88
-40010.88
-40010.88
-40010.88
-40010.88
-40010.88
-40010.88
-40010.88
-40010.88
-40010.88
-40010.88
-40010.88
-40010.88
-40010.88
-40010.88
-40010.88
-40010.88
-40010.88
-40010.88
-40010.88
-40010.88
-40010.88
-40010.88
Measured Depth (m MD-RT)

-44,970 -39,970 -34,970 -29,970 -24,970 -19,970


Duration (days) -14,970 -9,970 -4,97

Page 5 475549378.xls
WELL PS222-H TIME ESTIMATES

VE

Ac t ual AFE

Tar get

Page 6 475549378.xls
WELL PS222-H TIME ESTIMATES
6

VE

Ac t ual AFE

Tar get

10

12
ys) -14,970 -9,970 -4,970 30

Page 7 475549378.xls
Wednesday 17 Jun Thursday 18 Jun Friday 19 Jun Saturday 20 Jun Sunday 21 Jun
Equipment to Rig Equipment to Rig Equipment to Rig Equipment to Rig Equipment to Rig
Rig Move cranes One load fresh water for comp One load fresh water for comp One load fresh water for comp One load fresh water for comp
Rig move trucks. Drilling plan 10 loads drill water trucks 10 loads drill water trucks
Rig move add. Forklift
Drilling program Forklift for mud chemical move.
17 1/2" drill bits.

Equipment from Rig Equipment from Rig Equipment from Rig Equipment from Rig Equipment from Rig
Weatherford scrapers.
Monday 22 Jun Tuesday 23 Jun Wednesday 24 Jun Thursday 25 Jun
Equipment to Rig Equipment to Rig Equipment to Rig Equipment to Rig
5 loads drill water 5 loads drill water One load fresh water for camp One load fresh water for camp
One load fresh water for camp One load fresh water for camp 8 loads drill water 10 loads drill water
One set 8" drilling jars. 40 JTS x 13 3/8" Casing (68 ppf-k-55, btc) W. Ford. 13 3/8" casing handling tools
cement tanks 22" x 13 3/8" Base plate
30,000 lit diesel Cement pump 13 5/8"-5M Running tool & Braden head
10 bow type 13 3/8" centerlizer & stop collar
17 1/2" Pathfinder Stabilizers (1 NB & 2 String)
2 x 13 3/8" positive centerlizer.
13 3/8" casing F. shoe, collar, btc
13 3/8" btm & top plugs+ Can w/ casing dope
16 x 12 1/2" long x 1 5/8" Bolts W/ nuts
2 cans thread lock
Equipment from Rig Equipment from Rig Equipment from Rig Equipment from Rig
Friday 26 Jun Saturday 27 Jun Sunday 28 Jun Monday 29 Jun
Equipment to Rig Equipment to Rig Equipment to Rig Equipment to Rig
One load fresh water for camp One load fresh water for camp One load fresh water for camp One load fresh water for comp
loads fresh water 5 loads drill water 3 loads drill water 4 loads drill water
17.5" XR - Smith bits 70 jt's 9 5/8" csg, 47 ppf, L-80
17.5" Str. Stabilizers (Pathfinder) 10 ft long 9 5/8" csg, 47 ppf, L-80 pup jt Total safty equipment
Two sets 8" Jar 20 ft long 9 5/8" csg, 47 ppf, L-80 pup jt
9 5/8" F. Shoe, F. collar, top & btm plugs
WG 9 5/8" hanger with running tool
9 5/8" WG slips
Compl. Sec. B well head & accessories.
2 x 9 5/8" x 13 5/8" positive centralizer.
15 x 9 5/8" x 12 1/4" bow centralizer.
Equipment from Rig Equipment from Rig Equipment from Rig Equipment from Rig
Tuesday 30 Jun Wednesday 01 Jul Thursday 02 Jul Friday 03 Jul Saturday 04 Jul
Equipment to Rig Equipment to Rig Equipment to Rig Equipment to Rig Equipment to Rig
One load fresh water for comp One load fresh water for comp 1 Water truck for freshwater to rig & camp
1 Water truck for freshwater to rig & camp
1 Water truck for freshwater to rig & camp
5 loads drill water 5 loads drill water 5 loads drill water 5 loads drill water 5 loads drill water

Direction equipments
SCHLM logging unit & tools Cement lab test and plan for cmt plug Job
Cement chemical

1 Water truck for freshwater to cmt plugs

1 x 12 1/4" N.B.S + 2 x 12 1/4" ST.S


SCHLM logging unit & tools
Sunday 05 Jul Monday 06 Jul Tuesday 07 Jul Wednesday 08 Jul
Equipment to Rig Equipment to Rig Equipment to Rig Equipment to Rig
1 Water truck for freshwater to rig & camp
1 Water truck for freshwater to rig & camp
1 Water truck for freshwater to rig & camp
1 Water truck for freshwater to rig & camp
5 loads drill water 5 loads drill water 5 loads drill water 5 loads drill water
Thursday 09 Jul Friday 10 Jul Saturday 11 Jul Sunday 12 Jul
Equipment to Rig Equipment to Rig Equipment to Rig Equipment to Rig
1 Water truck for freshwater to rig & camp
1 Water truck for freshwater to rig & camp
1 Water truck for freshwater to rig & camp
1 Water truck for freshwater to rig & camp

SCHLM logging unit & tools 9 5/8" Weatherford scraper SCHLM logging unit & tools for CBL

11" x 3 1/8"-3M "WG" ahaptor flange 11" x 3 1/8"-3M "WG" ahaptor flange
3 1/8"-3M X-Mass tree 3 1/8"-3M X-Mass tree
Back press. Valve & running tool. Back press. Valve & running tool.

Equipment from Rig Equipment from Rig


SCHLM logging unit & tools
Rest of 9 5/8" csg 9 5/8" Weatherford scraper
9 5/8" Weatherford equipment SCHLM logging unit & tools for CBL
one set of 8 1/2" jar 12 1/4" bit
Dowel batchmixer
Monday 13 Jul Tuesday 14 Jul Wednesday 15 Jul Thursday 16 Jul
Equipment to Rig Equipment to Rig Equipment to Rig Equipment to Rig
1 Water truck for freshwater to rig & camp
1 Water truck for fresh water to rig & camp
1 Water truck for freshwater to rig & camp
1 Water truck for freshwater to rig & camp
Friday 17 Jul Saturday 18 Jul Sunday 19 Jul Monday 20 Jul Tuesday 21 Jul
Equipment to Rig Equipment to Rig Equipment to Rig Equipment to Rig Equipment to Rig
1 Water truck for freshwater to rig & camp
1 Water truck for freshwater to rig & camp
1 Water truck for freshwater to rig & camp
1 Water truck for freshwater to rig & camp
1 Water truck for freshwater to rig & camp

Equipment from Rig Equipment from Rig


Wednesday 22 Jul Thursday 23 Jul Friday 24 Jul Saturday 25 Jul
Equipment to Rig Equipment to Rig Equipment to Rig Equipment to Rig
1 Water truck for freshwater to rig & camp
1 Water truck for freshwater to rig & camp 1 fresh water truck for camp 1 fresh water truck for camp
Cement Equipment (TBC) 17.5" XR - Smith bits w/ Two sets of Nozzles
7jts, 20" Conductor Pipes One 17.5" Bit (Ulterra)
loads to fill water pit
Mud materials, Chemicals and Lab (TBC)

Equipment from Rig Equipment from Rig Equipment from Rig


Sunday 26 Jul Monday 27 Jul Tuesday 28 Jul Wednesday 29 Jul
Equipment to Rig Equipment to Rig Equipment to Rig Equipment to Rig
1 fresh water truck for camp 1 fresh water truck for camp 1 fresh water truck for camp 1 fresh water truck for camp
50,000litre Diesel loads to fill Water pit loads to fill Water pit loads to fill Water pit
loads to fill water pit Gesco Hammer (D-30) with all Access Scomi Solid Control Equip.
2 Ea, 17.5" Str. Stabilizers (Pathfinder, TBC)
Two sets 8" Jar (TBC)

Gesco Hammer (D-30) with all Access. (TBC)


Thursday 30 Jul Friday 31 Jul
Equipment to Rig Equipment to Rig
1 fresh water truck for camp 1 fresh water truck for camp
drill wtr
13 3/8" csg
13 3/8" csg accessories
cmt batch mixers

l Access. (TBC)
Saturday 01 Aug Sunday 02 Aug Monday 03 Aug Tuesday 04 Aug Wednesday 05 Aug
Equipment to Rig Equipment to Rig Equipment to Rig Equipment to Rig Equipment to Rig
1 fresh water truck for camp 1 fresh water truck for camp 1 fresh water truck for camp 1 fresh water truck for camp 1 fresh water truck for camp
drill wtr drill wtr 30,000 lit. Diesel truck load 30,000 lit. Diesel truck load
13 3/8" csg 13 3/8" csg drill wtr drill wtr
13 3/8" csg accessories
cmt batch mixers test plug test plug test plug
test plug wear bushing wear bushing wear bushing
wear bushing one set 8 1/4" jar one set 8 1/4" jar one set 8 1/4" jar
one set 8 1/4" jar

Equipment from Rig Equipment from Rig Equipment from Rig Equipment from Rig Equipment from Rig

csg crew cmt crew


Thursday 06 Aug
Equipment to Rig
1 fresh water truck for camp

Equipment from Rig


Friday 07 Aug Saturday 08 Aug Sunday 09 Aug Monday 10 Aug
Equipment to Rig Equipment to Rig Equipment to Rig Equipment to Rig
One load fresh water for camp One load fresh water for camp One load fresh water for camp
30,000 lit. Diesel truck load drill wtr One load fresh water for camp drill wtr
drill wtr 30,000 lit. Diesel truck load 8 1/4" back up jar
one set 8 1/4" jar drill wtr 40,000 lit. Diesel truck load
cmt lab test

Equipment from Rig


Tuesday 11 Aug Wednesday 12 Aug Thursday 13 Aug Friday 14 Aug Saturday 15 Aug
Equipment to Rig Equipment to Rig Equipment to Rig Equipment to Rig Equipment to Rig
One load fresh water for camp One load fresh water for camp One load fresh water for camp One load fresh water for camp
One load fresh water for camp drill wtr drill wtr drill wtr
cold cutter crew

cold cutter crew


b. head welding crew
sakson power tong back up

13 3/8" csg spider slips


13 3/8" csg spider elevator
sakson fill up tools
sakson power tong
sakson power unit
Sunday 16 Aug Monday 17 Aug Tuesday 18 Aug Wednesday 19 Aug Thursday 20 Aug
Equipment to Rig Equipment to Rig Equipment to Rig Equipment to Rig Equipment to Rig
One load fresh water for camp One load fresh water for camp One load fresh water for camp One load fresh water for camp One load fresh water for camp
drill wtr 20 jts 9 5/8" csg, 47 ppf, L-80.

drill wtr

30,000 lit. Diesel truck load


30,000 lit. Diesel truck load
Friday 21 Aug Saturday 22 Aug Sunday 23 Aug Monday 24 Aug Tuesday 25 Aug
Equipment to Rig Equipment to Rig Equipment to Rig Equipment to Rig Equipment to Rig
One load fresh water for camp One load fresh water for camp One load fresh water for camp One load fresh water for camp One load fresh water for camp
drill wtr drill wtr drill wtr drill wtr drill wtr
cold cutter crew 12 1/4" PDC Back- up used bit.
b. head welding crew
well head eng. 200 jt's 9 5/8" csg, 47 ppf, L-80
New 8 1/4" jar back up set 10 ft long 9 5/8" csg, 47 ppf, L-80 pup jt
12 1/4" bits. 20 ft long 9 5/8" csg, 47 ppf, L-80 pup jt
12 1/4" strg stab. 2ea

Total safety

2 x 17 1/2" st. stabilizer cold cutter


one set 8 1/4" jar
Wednesday 26 Aug Thursday 27 Aug Friday 28 Aug Saturday 29 Aug Sunday 30 Aug
Equipment to Rig Equipment to Rig Equipment to Rig Equipment to Rig Equipment to Rig
One load fresh water for camp One load fresh water for camp One load fresh water for camp One load fresh water for camp One load fresh water for camp
7 loads water for mud
Schl. Unit & logging tools 9 5/8" csg & accessories
two set of 6 1/2" jar 40000 lit diesel
8 1/2" PDC bit
8 1/2" tri- cone bit
8" pathfinder motor
8 1/2" NBS + 2 x 8 1/2" St. Stab's.

2 x 8 1/2" st. stabilizer


6 3/4" motors
Monday 31 Aug Tuesday 01 Sep Wednesday 02 Sep Thursday 03 Sep Friday 04 Sep
Equipment to Rig Equipment to Rig Equipment to Rig Equipment to Rig Equipment to Rig
One load fresh water for camp One load fresh water for camp One load fresh water for camp One load fresh water for camp One load fresh water for camp
2 loads water for mud 7 loads water for mud 2 loads water for mud 2 loads water for mud 2 loads water for mud

NEW 8 1/8" HYD. JAR DIESEL.


BACK LOAD 2 12 1/4" STRG STAB.
BACK LOAD 13 3/8" CSG
BACK LOAD 8 14" HYD. JAR

All cmt equipment


Schl. Unit & equipment One set 6 1/2" jar
Saturday 05 Sep Sunday 06 Sep Monday 07 Sep Tuesday 08 Sep Wednesday 09 Sep
Equipment to Rig Equipment to Rig Equipment to Rig Equipment to Rig Equipment to Rig
One load fresh water for camp One load fresh water for camp One load fresh water for camp One load fresh water for camp One load fresh water for camp

30000 lit diesel

LOGGGING TOOLS
9 5/8" CSG ACCESSORIES Cmt lab test
SCHL. CMT EQUIPMENT cmt chemical
CMT OPERATORS. Batch mixer
8 1/2 " BITS
Thursday 10 Sep Friday 11 Sep Saturday 12 Sep Sunday 13 Sep Monday 14 Sep
Equipment to Rig Equipment to Rig Equipment to Rig Equipment to Rig Equipment to Rig
One load fresh water for camp One load fresh water for camp One load fresh water for camp One load fresh water for camp One load fresh water for camp
Tuesday 15 Sep
Equipment to Rig
One load fresh water for camp
On Wednesday 17 Jun Off On Thu 18 Jun Off On Fri 19 Jun Off On
1

0 Wed 17 Jun 0 0 Thu 18 Jun 0 0 Fri 19 Jun 0 1


Total POL ### Total POL ### Total POL ###
Sat 20 Jun Off On Sun 21 Jun Off On Mon 22 Jun Off On
IT Engineer 1 3 Pre-spud meeting Cairo drilling team 3 1
6 Pre-spud meeting service companies. 6
4 ESC crew 1
1 Baroid mud engineer. 1
2 Dowell 2 17

Sat 20 Jun 1 0 Sun 21 Jun 0 16 Mon 22 Jun 12 19


Total POL ### Total POL ### Total POL ###
Tue 23 Jun Off On Wed 24 Jun Off On Thu 25 Jun Off On
Mud Eng 3 Dowell cmt crew.
2 Weatherford csg crew
DSV 1

EDC Crew change 17 3 Vetco inspection crew 3 1 NDSV

Tue 23 Jun 18 3 Wed 24 Jun 3 6 Thu 25 Jun 0 0


Total POL ### Total POL ### Total POL ###
Fri 26 Jun Off On Sat 27 Jun Off On Sun 28 Jun Off On
Dowell cmt crew. 3 3 Inspection crew for 9 5/8" csg 3
Weatherford csg crew 2

Fri 26 Jun 2 0 Sat 27 Jun 3 3 Sun 28 Jun 3 1


Total POL ### Total POL 117 Total POL 117
Mon 29 Jun Off On Tue 30 Jun Off On Wed 01 Jul Off On

4 Schl. Logging crew.

Total safety eng

Mon 29 Jun 0 0 Tue 30 Jun 0 1 Wed 01 Jul 1 0


Total POL 118 Total POL 118 Total POL 118
Thu 02 Jul Off On Fri 03 Jul Off On Sat 04 Jul Off On
Schl. Logging crew. 4 3 Dowell cmt crew.

2 Direction engineer
Total safety eng 1 2 MWD engineer

Dowell cmt crew.

Thu 02 Jul ### ### Fri 03 Jul 0 4 Sat 04 Jul 0 0


Total POL ### Total POL ### Total POL ###
Sun 05 Jul Off On Mon 06 Jul Off On Tue 07 Jul Off On
Mahmoud Shebl(DSV) 1
1 Ibrahim A. Hakeem(DSV)

Sun 05 Jul 0 0 Mon 06 Jul 0 0 Tue 07 Jul 0 0


Total POL ### Total POL ### Total POL ###
Wed 08 Jul Off On Thu 09 Jul Off On Fri 10 Jul Off On

4 Schl. Logging crew.

Wed 08 Jul 0 0 Thu 09 Jul 0 ### Fri 10 Jul #REF! ###


Total POL ### Total POL ### Total POL #REF!
Sat 11 Jul Off On Sun 12 Jul Off On Mon 13 Jul Off On

Sat 11 Jul ###### Sun 12 Jul ### ### Mon 13 Jul ### 0
Total POL ### Total POL ### Total POL ###
Tue 14 Jul Off On Wed 15 Jul Off On Thu 16 Jul Off On

Tue 14 Jul 0 0 Wed 15 Jul 0 0 Thu 16 Jul 0 0


Total POL ### Total POL ### Total POL ###
Fri 17 Jul Off On Sat 18 Jul Off On Sun 19 Jul Off On

Fri 17 Jul 0 0 Sat 18 Jul ### ### Sun 19 Jul 0 0


Total POL ### Total POL ### Total POL ###
Mon 20 Jul Off On Tue 21 Jul Off On Wed 22 Jul Off On

Mon 20 Jul 0 0 Tue 21 Jul 0 0 Wed 22 Jul 0 0


Total POL ### Total POL ### Total POL ###
Thu 23 Jul Off On Fri 24 Jul Off On Sat 25 Jul Off On
1 Burapetco Night DS 1 Mud Engineer 1
4 Cement Crew

Thu 23 Jul 0 1 Fri 24 Jul 0 5 Sat 25 Jul 0 1


Total POL ### Total POL ### Total POL ###
Sun 26 Jul Off On Mon 27 Jul Off On Tue 28 Jul Off On
Burapetco S. DSV 4 GESCO Hammering Crew, (TBC) 4 Management, Rig Visit
1 HSE supervisor

Sun 26 Jul 0 4 Mon 27 Jul 0 5 Tue 28 Jul 0 0


Total POL ### Total POL ### Total POL ###
Wed 29 Jul Off On Thu 30 Jul Off On Fri 31 Jul Off On
GESCO Hammering Crew, TBC 4 GESCO Hammering Crew, TBC GESCO Hammering Crew, TBC
Management, Rig Visit 4

Wed 29 Jul 8 0 Thu 30 Jul 0 0 Fri 31 Jul 0 0


Total POL ### Total POL ### Total POL ###
Sat 01 Aug Off On Sun 02 Aug Off On Mon 03 Aug Off On
GESCO Hammering Crew, TBC

Sat 01 Aug 0 0 Sun 02 Aug 0 0 Mon 03 Aug 0 0


Total POL ### Total POL ### Total POL ###
Tue 04 Aug Off On Wed 05 Aug Off On Thu 06 Aug Off On

Tue 04 Aug 0 0 Wed 05 Aug 0 0 Thu 06 Aug 0 0


Total POL ### Total POL ### Total POL ###
Fri 07 Aug Off On Sat 08 Aug Off On Sun 09 Aug Off On

Fri 07 Aug 0 0 Sat 08 Aug 0 0 Sun 09 Aug 0 0


Total POL ### Total POL ### Total POL ###
Mon 10 Aug Off On Tue 11 Aug Off On Wed 12 Aug Off On

Mon 10 Aug 0 0 Tue 11 Aug 0 0 Wed 12 Aug 0 0


Total POL ### Total POL ### Total POL ###
Thu 13 Aug Off On Fri 14 Aug Off On Sat 15 Aug Off On

Thu 13 Aug 0 0 Fri 14 Aug 0 0 Sat 15 Aug 0 0


Total POL ### Total POL ### Total POL ###
Sun 16 Aug Off On Mon 17 Aug Off On Tue 18 Aug Off On

Sun 16 Aug 0 0 Mon 17 Aug 0 0 Tue 18 Aug 0 0


Total POL ### Total POL ### Total POL ###
Wed 19 Aug Off On Thu 20 Aug Off On Fri 21 Aug Off On

Wed 19 Aug 0 0 Thu 20 Aug 0 0 Fri 21 Aug 0 0


Total POL ### Total POL ### Total POL ###
Sat 22 Aug Off On Sun 23 Aug Off On Mon 24 Aug Off On

Sat 22 Aug 0 0 Sun 23 Aug 0 0 Mon 24 Aug 0 0


Total POL ### Total POL ### Total POL ###
Tue 25 Aug Off On Wed 26 Aug Off On Thu 27 Aug Off On
Mahmoud Shebl(DSV) 1
1 Ibrahiem A.Ha keem (DSV)

Tue 25 Aug 0 1 Wed 26 Aug 1 0 Thu 27 Aug 0 0


Total POL ### Total POL ### Total POL ###
Fri 28 Aug Off On Sat 29 Aug Off On Sun 30 Aug Off On

Fri 28 Aug 0 0 Sat 29 Aug 0 0 Sun 30 Aug 0 0


Total POL ### Total POL ### Total POL ###
Mon 31 Aug Off On Tue 01 Sep Off On Wed 02 Sep Off On
1

Mon 31 Aug 0 0 Tue 01 Sep 0 0 Wed 02 Sep 0 1


Total POL ### Total POL ### Total POL ###
Thu 03 Sep Off On Fri 04 Sep Off On Sat 05 Sep Off On
WG Eng. For setting BPV.

Thu 03 Sep 0 0 Fri 04 Sep 0 0 Sat 05 Sep 0 0


Total POL ### Total POL ### Total POL ###
Sun 06 Sep Off On Mon 07 Sep Off On Tue 08 Sep Off
DD ENG PATHDINDER 6 Gesco hammar crew & welders.

Sun 06 Sep 0 0 Mon 07 Sep 0 6 Tue 08 Sep 0


Total POL ### Total POL ### Total POL ###