manufacture time
The probability of failure
No ITEM by estimate
DISCIPLINE
(months)
Design Corrosion Fatigue
Communica
Communication &
33 tion & 7 10 20 20
navigation system
navigation
FLOATING LNG TERMINAL AT PORT QASIM
INSPECTON LEVEL ASSESSMENT
(Preliminary )
The consequence of
ty of failure
failure
Mechanical Operating Reparation
P failure Production C failure RISK
damage Frequency Cost
20 75 10 20 10 0.4 30
50 78 10 20 10 0.4 31.2
50 78 10 50 10 0.7 54.6
50 99 40 20 20 0.8 79.2
50 123 10 20 10 0.4 49.2
20 78 10 20 10 0.4 31.2
50 123 30 20 20 0.7 86.1
20 48 40 40 20 1 48
20 93 20 20 10 0.5 46.5
50 87 20 20 10 0.5 43.5
30 109 20 20 20 0.6 65.4
20 60 20 20 30 0.7 42
LoW Level-1 N
Medium Level-2 N
Low Level-1 N
Low Level-1 N
Low Level-1 N
Very LoW Level-0 N
Medium Level-2 N
Low Level-1 N
Low Level-1 N
Low Level-1 N
Low Level-1 N
Low Level-1 N
Medium Level-2 CI