FLOATING

manufacture time
The probability of failure
No ITEM by estimate
DISCIPLINE
(months)
Design Corrosion Fatigue

1 Process Gas Loading Arm 12 10 50 50


2 Process DSAW pipe 4 1 40 30
3 Process Process valve 6 10 50 20
4 Process Metering& analysis Skid 8 10 20 30
5 Process Pipe fittings 2 1 20 10
6 Process Gangway 7 10 70 30
7 Process Pressure Vessel 5 10 20 10
8 Process Filter Skid 7 10 20 40
9 Process Regulation Skid 7 10 30 70
10 Process Water Bath Heater 10 10 20 70
11 instrument Instrument valve 7 10 20 80
12 instrument FGS system 6 10 10 10
13 instrument DCS system 6 10 10 10
14 instrument ESD system 6 10 10 10
15 instrument Transmiter 3 1 10 10
16 instrument Fire Alam system 5 10 10 10
17 instrument Instrument cable 3 1 10 10
Temperature/pressure
18 instrument 2 1 10 50
gage
Fire-fighting
water sea water firefighting
19 12 10 80 30
supply and pump
drainage
Fire-fighting
water
20 Fire-fighting equipment 7 10 30 30
supply and
drainage
Fire-fighting
water
21 Fire-fighting valve 3 1 20 20
supply and
drainage
Fire-fighting
water
22 Plastic pipe 1 1 10 10
supply and
drainage
23 electrical Power cable 3 1 10 10
24 electrical HV/LV switchgear 4 10 10 20
25 electrical Cable tray 3 1 40 10
26 All Bulk material 2 1 30 10
27 electrical UPS 5 10 10 40
28 electrical Power distribution box 3 1 10 10
29 electrical Lighting fixture 3 1 40 10
Electric automation
30 electrical 4 10 10 10
system
31 electrical Power transformer 3 10 30 20
32 electrical DC power panel 4 1 10 20

Communica
Communication &
33 tion & 7 10 20 20
navigation system
navigation
FLOATING LNG TERMINAL AT PORT QASIM
INSPECTON LEVEL ASSESSMENT
(Preliminary )
The consequence of
ty of failure
failure
Mechanical Operating Reparation
P failure Production C failure RISK
damage Frequency Cost

30 175 60 20 50 1.3 227.5


20 117 20 20 20 0.6 70.2
20 129 30 20 50 1 129
20 96 30 20 50 1 96
10 53 20 20 20 0.6 31.8
10 161 50 20 50 1.2 193.2
20 72 30 20 20 0.7 50.4
20 108 30 20 50 1 108
20 159 30 20 50 1 159
20 144 60 20 50 1.3 187.2
20 156 40 20 40 1 156
50 87 40 50 30 1.2 104.4
50 87 40 50 30 1.2 104.4
50 87 40 50 30 1.2 104.4
50 78 20 30 30 0.8 62.4
50 87 40 50 30 1.2 104.4
50 78 10 20 10 0.4 31.2

30 106 10 20 10 0.4 42.4

20 186 50 10 50 1.1 204.6

20 111 10 20 40 0.7 77.7

20 75 10 20 10 0.4 30

50 78 10 20 10 0.4 31.2

50 78 10 50 10 0.7 54.6
50 99 40 20 20 0.8 79.2
50 123 10 20 10 0.4 49.2
20 78 10 20 10 0.4 31.2
50 123 30 20 20 0.7 86.1
20 48 40 40 20 1 48
20 93 20 20 10 0.5 46.5
50 87 20 20 10 0.5 43.5
30 109 20 20 20 0.6 65.4
20 60 20 20 30 0.7 42

60 124 40 20 50 1.1 136.4


INSPECTION
INSPECTION LEVEL CRITICALITY
CRITICALITY

Medium Level-2 LLI & CI


Low Level-1 CI
Medium Level-2 CI
Medium Level-2 CI
Very Low Level-0 N
Medium Level-2 N
Low Level-1 CI
Medium Level-2 CI
Medium Level-2 CI
Medium Level-2 LLI & CI
Medium Level-2 CI
Medium Level-2 CI
Medium Level-2 CI
Medium Level-2 CI
Low Level-1 N
MEdium Level-2 CI
Very LoW Level-0 N

LoW Level-1 N

Medium Level-2 LLI & CI

Medium Level-2 N

Very Low Level-0 N

Very Low Level-0 N

Low Level-1 N
Low Level-1 N
Low Level-1 N
Very LoW Level-0 N
Medium Level-2 N
Low Level-1 N
Low Level-1 N
Low Level-1 N
Low Level-1 N
Low Level-1 N

Medium Level-2 CI