05 Manual Handling
05 Manual Handling
Method
task/operation being Task Carried assessment: Ongoing
Statement Action by
Sajimon KK assessed: out by? 15 January 09
by When?
Site
Ref No: Rev – 02 – RA – 2009 - Depa Cross reference to N.B. Residual risk:
SSOW/method Other on site The risk left
statement: (Highlight SSOW/Method statement control measures after all control
one below) Ref No: may be required measures have
Page No: due to weather been put in
YES NO M/S 001 conditions/other place – see
Risk Persons at risk reasons at time risk matrix at
severity of footer:
E C P Oth
(before task/operation:
Activity/ Significant ers
controls Control measures Work must not
Operation hazard
are in required: start until the
place) risks have
been assessed:
05 Slip / Trip / High Yes Yes Yes Prior to the Make sure the load is Project Site Engineer
Fall commencement not carried for long Manager
Manual of the activity distance. Supervisor
Handling Construction
Activities Make sure the shape Manager Foreman
and size of material.
Site Manager Charge hand
Make sure the material
is not too hot or cold if Project Workers
so use necessary PPE. Engineer
Helpers
Collapse of High Yes Yes Yes When materials are HSE Manager Medium
stacked loaded, keep feet,
materials fingers clear of pinch
point.