Purpose of revising :
Existing booklet is not full filling more requirements down the line. Hence need to chage .
Streamline the billing process of contractor's payments doing more stages. 4 Stages
extended to 6 stages to get payments faster.
Some of the building owners are demanding landing sills first before rails inside the shaft,
to carryout their architraves with lobby flooring civil work. Hence stage 1 and stage 2 is
broken.
Demands of more check charts not to miss any requirement.
Requirements of safety check charts per stages to cautious everyone before entering in to
next stage.
To increase performance charts to achieve high quality norms
Key revisions :
Stage 1 is broken in to 2 stages.
1) 1 A - For template setting and readings
2) 1 B - For rail alignment and setting m/c room equipment
Stagewise erection procedure is added to show which stage is carrying what type of work
and weightage value per activity per stage.
Erection schedule with bar chart is added to get the time frame of the erection job
Installation field quality audit chart is newly added to set the % wise quality ratings of
individual jobs