You are on page 1of 1

ACCEPTANCE OF ELEVATOR

(HANDING OVER/ TAKING OVER OF ELEVATOR)

CUSTOMERS ORDER NO. : E20905070-A1, DATED: 18.11.2005

TKE’S ORDER NO./ JOB NO. TKEE-2-09-06-005

NAME OF SITE/BLDG/PROJECT:Bank of Maharastra Building,Udaipole, Udaipur.

THE ELEVATOR (S) HAS/ HAVE BEEN EXAMINED IN ACCORDANCE WITH


THE ORDER/ CONTRACT AND HERE BY ACCEPTED.

THE SAME / THE FREE MAINTENANCE PERIOD SHALL COMMENCE ON


DATE VALID UPTO .

HANDED OVER BY TAKEN OVER BY

THYSSENKRUPP ELEVATOR (INDIA) PVT. LTD. CUSTOMER’S

REPRESENTED BY REPRESENTED BY

Mr. Sandeep Mathur Mr.

SIGNATURE SIGNATURE .

You might also like