POLYTECH MAINTENANCE COMPANY

JOB LOG
Customer POLYTECH MAINTENANCE COMPANY Location ARAMCO UTHALIYAH

Date 28.12.2022 Job REF #02


number
LUBE OIL FLUSHING OF NEW LO INLET
Scope of Work & OUTLET SS PIPING AT SAUDI Shift DAY SHIFT
ARAMCO UTHALIYAH PLANT
Unit / Equipment No. Lube Oil System M39-077-U-0017 Supervisor M. ANAND

ACTIVITIES FOR LUBE OIL FLUSHING


Preparation for oil flushing works started by spot out the locations, after that we clear
that area for the Lube oil flushing then we lay down blue tarpaulin and rearranging the
related equipments needed for lube oil flushing works, after that the area set up finished,
then internal hook up started and barrication done.

Personnel on Site Equipment Consumables used


M.Anand Oil Flushing Pump, SS
M. Jaheer Oil Flushing SS Console w/Immersion
Heater
Dinesh shreshtha SS Manifold
Basket Filter SS
Oil Flushing hoses and SS Fittings
Pick Up (Support Vehicle)
Boom truck

CLIENT APPROVAL

PT/JM-JOBLOG-002REV.00 02.01.2023