Slug Catcher Type

Parameter
Vessel type Finger (multiple-pipe) type
Slug volume < 100 m3 (Note 1) >100 m3
High Design Pressure (Note 3) √ (Note 3)
Fabrication √ (Note 2) √ (Note 2)
Onshore installation √ √
Offshore installation √
Cost √ (Note 2,3) √ (Note 2,3)

Note:
1. 200 m3 slug volume is still preferable for using vessel type. However, it needs to be approved by COMPANY.
2. If high slug volume then vessel type is used. It would be costly and difficult to fabricated
and finger type should be selected instead.

3. Design pressure is high then vessel thickness and consequently vessel cost will be higher. Finger type

will be more economical.


√ : Good
by COMPANY.

Description Unit Value


N2 %mole 0.03
C1 %mole 91.66
C2 %mole 4.48
C3 %mole 2.27
iC4 %mole 0.54
nC4 %mole 0.56
iC5 %mole 0.01
nC6 %mole 0.00
Total 100.00

LNG Density kg/m3 455.20


Temperature oC -159.00
Pressure atm 1.00
Heating value BTU/Scf 1,065 - 1,165
STUDY
ENGINEERING
(CONCEPT &
(BASIC & DETAIL)
FEASIBILITY)

OPERATION & COMMISSIONING &


MAINTENANCE START-UP

BOG Handling System


(Ship)

LNG Carrier from Subsea Pipeline


FSU-FRU or FSRU
Bontang
(Ship)
(Ship)
Cap: 22,500 m3 Vaporizer technology IFV
(Intermediate Fluid Vaprizer)

LNG Carrier from


FSU-FRU or FSRU
Bontang
(Ship)
(Ship)
Cap: 22,500 m3

LNG Feeder Jetty


(Ship)
Cap.: 7,500 m3
BANGKA-BELITUNG-NIAS
PROCUREMENT

FABRICATION AND
CONSTRUCTION

Utility Support
(Ship)

Onshore Pipelin
MPP/IPP
Gas Metering
West Kalimantan

LNG Regasification
LNG Storage Utility Support
(Vaporizer Tech.: AAV)

BOG Handling System Gas Metering


BOG Handling System Gas Metering

Onshore Pipeline
MPP
Bangka/Belitung/Nias
Residu Gas

LPG
Feed Gas HC Liquid
JAMBI GAS EXTRACTION & LOADING
REFRIGERATION
SYSTEM FRACTIONATION
STATION PLANT PLANT

Condensate
Utility Support

EG FUEL GAS HOT OIL AIR SYSTEM POWER


REGENERATION SYSTEM SYSTEM GENERATORS
SYSTEM

WATER TREATMENT FIRE WATER CLOSED & OPEN


FLARE SYSTEM
SYSTEM SYSTEM DRAIN SYSTEM

LNG Carrier FSU-FRU or


from Bontang FSRU
(Ship) (Ship)
Cap: 22,500 m3

LNG Feeder Jetty LNG


Regasification
(Ship) LNG Storage Utility Support
Cap.: 7,500 m3 (Vaporizer
Tech.: AAV)

BOG Handling
Gas Metering
System

Onshore Pipeline
BANGKA-BELITUNG-NIAS

MPP
Bangka/Belitun
g/Nias
Residu Gas

LPG
Feed Gas HC Liquid
JAMBI GAS EXTRACTION & LOADING
REFRIGERATION
FRACTIONATION
STATION SYSTEM PLANT PLANT

Condensate

Utility Support

EG FUEL GAS POWER


SYSTEM HOT OIL SYSTEM AIR SYSTEM GENERATORS
REGENERATION
SYSTEM

WATER TREATMENT FIRE WATER CLOSED & OPEN


SYSTEM SYSTEM DRAIN SYSTEM FLARE SYSTEM

LNG Carrier FSU-FRU or


from Bontang FSRU
(Ship) (Ship)
Cap: 22,500 m3

Jetty LNG
LNG Feeder Regasification
(Ship) LNG Storage Utility Support
Cap.: 7,500 m3 (Vaporizer
Tech.: AAV)

BOG Handling Gas Metering


System

Onshore Pipeline
BANGKA-BELITUNG-NIAS

MPP
Bangka/Belitun
g/Nias

LPG/LNG Storage
LPG/LNG Plant (Loading/ Unloading)

Compression H2S/CO2 Dehydration Unit


Gas Metering LPG/LNG Plant
Sytem Removal / DPCU

GAS

Wellhead
(Onshore/ Production Condensate Cond. Storage
Condensate Mercaptan (loading/
Offshore) Separator Stabilizer Treatment unloading)
CONDENSATE
WATER
Note:
1. The system is required for remove H2S and CO2 in the sales gas.
Water 2. Dehydration unit is required to reduce water/HC content
Treatment 3. Cond. Stabilizer is utilized to reduce vapor pressure to prevent condensate
System vaporize during holding in storage.

Gas Injection
System

Compression H2S/CO2 Dehydration Unit


Fuel Gas System
Sytem Removal / DPCU

GAS
Wellhead
Production Crude Oil Crude Storage
(Onshore/ Desalter Mercaptan
Crude Oil
(loading/
Offshore) Separator Stabilizer
Treatment unloading)

CONDENSATE/C
WATER RUDE OIL

Water
Treatment
System