The document is a roll inspection report from the Rolling Mill - II department that contains details of roll inspections including roll number, diameter, supplier, date of inspection, hardness measurements of the barrel and neck, and checks of dimensions A, A-1, D, threads on both ends, chamfers, and physical condition. It also includes spaces to document whether the roll was accepted or not and requires sign off from the inspection manager and department head.
The document is a roll inspection report from the Rolling Mill - II department that contains details of roll inspections including roll number, diameter, supplier, date of inspection, hardness measurements of the barrel and neck, and checks of dimensions A, A-1, D, threads on both ends, chamfers, and physical condition. It also includes spaces to document whether the roll was accepted or not and requires sign off from the inspection manager and department head.
The document is a roll inspection report from the Rolling Mill - II department that contains details of roll inspections including roll number, diameter, supplier, date of inspection, hardness measurements of the barrel and neck, and checks of dimensions A, A-1, D, threads on both ends, chamfers, and physical condition. It also includes spaces to document whether the roll was accepted or not and requires sign off from the inspection manager and department head.