You are on page 1of 3

Zhejiang Hangzhen Boiler Sales

Contract
Exporting countries:
Sign;Hangzhou, zhejiang contract no. : 2018-1208-2
The date: 2018-12-08
This sales contract is entered into by and between the seller and the buyer with respect to the
products agreed herein. In the principle of fairness, justice, equality and mutual benefit, the seller
agrees to enter into this contract in Hangzhou on the following terms and conditions. The buyer is
willing to purchase and the seller is willing to sell according to the following terms and
conditions.
The sales contract signed below is a legally binding document.
Seller: Hangzhou Juran Boiler Equipment Co., LTD
Address : no. 78 Changbin road Gongshu district Hangzhou city China
Contact person/telephone: luo xinmin / 0086-571-88011325
Buyer:
Address:
Contact person/telephone:
Products and prices
1. Gas steam boiler configuration list and price of the subject matter hereof
Type And Sum price
No. Device Name Quantity Brand/Place of origin
Specification (US dollar)

1 Boiler host WNS1.5-1.0-Q 1 set 11337 Zhejiang Hangzhen

2 Gas burner TBG150P 1 set 3605 BALTUR

3 Electric cabinet 1 set 363 Zhejiang Hangzhen

Hangzhou Nanyuan
4 Vertical feed pump CDL2-26/3KW 1 set 349
Pump

Primary Valve Domestic quality


5 1 set 654
instrument brand

6 Chimney φ360, 10m 1 set 291 Zhejiang Hangzhen

7 Steam manifold φ273 1 set 291 Zhejiang Hangzhen

Fin type energy-


8 YJ1.5 1 set 1119 Zhejiang Hangzhen
saving tube

Automatic water
9 1.5T/H 1 set 291 FLECK
treatment system

10 Total Price of devices 18300


11 Packing fee 450

12 Transportation freight to Shanghai port 450

13 Total Price 19200

1.1. The contract does not specifically mention that both parties shall settle in usd.(note;Neither
party shall make any unreasonable claim on the fluctuation factor of the us dollar exchange
rate.Payment according to the contract amount.
1.2. The seller shall provide the buyer with the equipment listed in the appendix hereto and the
services specified herein, and the buyer shall, in accordance with this contract,
The total contract price paid to the seller shall be USD 19,200 (say USD 19,200 only).
• description of goods (see configuration list for details)
1.3. Above total contract price is gas boiler equipment FOB Shanghai price,without the
commodity inspection cost, not including the installation of boiler material in the boiler
configuration list provided by the seller, does not contain debugging fee (if the buyer may require
the seller to guide the installation and debugging, Hangzhou to ( ) travel, eat, live abroad,
lines and other expenses shall be borne by the buyer), the debugging cost is calculated at $120 /
day *people.
2. The delivery time
Delivery time: within 50 days after receiving the deposit.
3. Location (port) and transportation
3.1. place of delivery: Shanghai port.
3.2.delivery method: container car transportation is adopted from Hangzhou to Shanghai port.
3.3. transportation cost: the seller shall be responsible for the transportation from Hangzhou to
Shanghai port.Other expenses shall be borne by the buyer.
3.4. the buyer shall not bear any costs and liabilities other than the total contract price before the
delivery of the equipment.
4. Terms of payment
4.1. the buyer shall remit the money according to the company account designated by the seller.
4.2. payment method (wire transfer)
1) 30% advance payment shall be paid within 7 working days after signing the contract, i.e.
USD 5,760, in words of USD;Five thousand seven hundred and sixty dollars down payment.After
the deposit is paid, the buyer can go to the seller's factory to confirm whether the equipment has
been manufactured according to the production schedule established by both parties through
negotiation.
2) After loading all the goods factory, the buyer can arrange related personnel, together with
the seller inventory goods, to ensure that the inventory items is correct, if the buyer can't arrange
check the goods together, pack all the goods is completed by the seller, the seller send pictures or
video to the buyer, after certain goods, the buyer to the seller immediately pay 70% of the contract
sum payment (USD $13440, capital one Wan San thousand HK dollars) spreading spreading.Upon
receipt of all payment, the seller shall ship all the goods to the port of Shanghai and deliver them
to the buyer.The buyer shall be responsible for all the work after the handover.
4.3. The payee
Hangzhou Juran Boiler Equipment Co., LTD
Taxpayer identification number: 9133010576824300XJ
Add: Gongshu district Changbin road 78 0571-88011325
Opening bank and account number: Hangzhou United Bank 201000208922994
Date:2018. 12.08
Seller: Hangzhou Juran Boiler Equipment Co., LTD Buyer:
Authorized signature Authorized signature

You might also like