Professional Documents
Culture Documents
Group 8 Turning Joint: 1. Removal and Install
Group 8 Turning Joint: 1. Removal and Install
2) INSTALL
1 2
(1) Carry out installation in the reverse order
to removal.
Ɠ Take care of turning joint direction.
Ɠ Assemble hoses to their original positions.
Ɠ Confirm the hydraulic oil level and check
the hydraulic oil leak or not.
8-132
2. DISASSEMBLY AND ASSEMBLY
1) STRUCTURE
10 13 6 3
14
15
8
2
12 11
8-133
2) DISASSEMBLY
14
Ɠ Before the disassembly, clean the turning
15
joint.
3
(1) Remove bolts(14), washer(15) and
cover(3).
Work bench
8-134
3) ASSEMBLY
Ɠ Clean all parts.
Ɠ As a general rule, replace oil seals and O-
ring.
Ɠ Coat the sliding surfaces of all parts with
engine oil or grease before installing.
8-135
(7) Install cover(3) to body(1) and tighten
bolts(14). 14
şTorque : 10~12.5kgfşm 15
3
8-136