ANGLO-EASTERN GROUP

QHSE MANAGEMENT
MV “ ”
Checklist for Testing Of Inactive Functions

No.: E / 008 Date: 01Aug 05 Revision: 0 Prep: C/ E Appr: Suptd Page 1 of 1

ACTION: FILE & LOG

Sr. Machinery Interval In Last Date Sign


No: Charge done Due
1. Ship’s whistle Fwd / Aft D 2/E
2. Standby and Other Pumps M 2/E
3. A/C Compressor & Stand by Fridge Compressor M 2/E
4. Steering gear room bilge pumping out 3M 2/E
arrangement
5. SCBA Compressor W 4/E
6. Hold Bilge Alarms W 4/E
7. Engine Room Bilge Alarms D 4/E
8. Batteries Checking W E/O
9. E/R Crane Safeties M 2/E
10. Provision Crane Safeties M 2/E
11. Change Over of All Pumps M 2/E
12. Provision Room Alarm M 2/E
13. Gangway Safeties M 3/E
14. Main Engine Safeties incl. O/speed trip test 3M C/E
15. Aux. Engine Safeties incl. O/speed trip test M 3/E
16. EM. Bilge Pump Stop from deck M 4/E
17. F. O. transfer pump stop from deck M 4/E
18. Sewage Plant Isolating V/V’s M 4/E
19. Sludge Pump stop from deck M 4/E
20. Inert Gas Plant running test M C/E
21. Gas detector calibration and function test M C/O
22. Sea Suction & Overboard v/v Free & Grease M 4/E
23. Valve gearing for remote operation of v/v’s M 4/E
24. Alternator reverse power / over current trips 3M 2/E
25. Tank level alarms 3M 4/E
26. Cargo pump alarms and trips 3M C/E
27. Cargo compressor alarms & trips 3M C/E
28. Inert gas plant alarms & trips 3M C/E
29. Remote Stops 3M C/E
30. Emergency Steering 3M C/E
31. Emergency fire pump room bilge’s 3M C/E
32. Bunker manifold last pressure test 6M C/E
33. Hospital alarm 3M E/O

Note: Responsibilities are to be rotated to ensure all personnel are familiar with the
equipment. In case a PMS based system already exists for the above equipment
ensure all above mentioned items are covered in it in addition to ship specific
items, identified as inactive function and updated promptly. In such case filing of
this checklist may be waived, if deemed necessary by the Chief Engineer.