Professional Documents
Culture Documents
QHSE MANAGEMENT
MV “ ”
Checklist for Testing Of Inactive Functions
Note: Responsibilities are to be rotated to ensure all personnel are familiar with the
equipment. In case a PMS based system already exists for the above equipment
ensure all above mentioned items are covered in it in addition to ship specific
items, identified as inactive function and updated promptly. In such case filing of
this checklist may be waived, if deemed necessary by the Chief Engineer.
AESM