NAVI MUMBAI METRO LINE 1

Mast Calculation - Panchanand Depot


Loc.No: 2024 Mast: 8 X 8 BFB(9.0m)
1.Specifications:
Cables & Wires
nominal tension with
section diam weight
Description material tension wind
2
mm mm kg kg(35' ) kg(35' )
Earth cable Steel 93.3 12.5 0.437 500 738
Catenary wire Cu Cd 65 10.5 0.597 1200 1200
Contact wire Hard Copper 150 14.5 1.34 1200 1200
Anticreep cable Cu Cd 65 10.5 0.597 1000 594

2 Mast:8 X 8 BFB(9.0m)
Width of moment of moment of Section of Section of
Weight Depth of sec. Area of sec.
sec. 2
Inertia X-X Inertia Y-Y modulus X-X modulus Y-Y
(kg/m) (mm) (cm ) 4 4 3 3
(mm) (cm ) (cm ) (cm ) (cm )
52 203.2 203 66.5 5263 1770 510 174

3 Layout:

4 Schematic drawing :

0.195

Heights are with


respect to
Foundation level
Hopc

- + Hcw 6.00
Hm

stagger Hm 7.65
2.50 HOPC 7.46
Stagger 1 -0.300
Hcw

0.203 Stagger 2 -0.300


0.5
1.35

1/3
Loc.No: 2024

Ref.Line: Centre Line of Track(Considered as Tangent) + ve - ve

1.Radial Tension
Deviation from left side Deviation from right side
Radial Tension = X Tension of the
Left Span Right Span conductor

Left Span = 18.00 Avg Span = 18.00


Right Span = 18.00
Left side Versine = 338 Right side Versine= 330

Track Left Centre Right

OHE 1.352 1.320


-0.300 -0.300 -0.300
1.052 -0.300 1.020
1.352 1.320
((1.352/ 18) + (1.32 /18)) X 2400 = 356 kg

OPC -2.500 -2.500 -3.000

1.352 1.320

-0.203 -0.203 -0.203

-1.351 -2.703 -1.883

1.352 0.820
((1.352/18) + (0.82/18)) X 738 = 89 kg

2.Wind Load (Perpendicular to Track)

OHE = 0.67X150X(25)/1000 X1.05X18.00= 47 kg Conductor = 0.67


OPC = 0.67X150X12.5/1000X18= 23 kg Mast(Safety Factor) = 1
Mast = 1 X 150 X 0.203 X 8.15= 233 kg Wind Pressure = 150
2
kg/m

3.Lever Arm

IR 2.5+(.203/2)-0.300 = 2.302 m

4.Vertical Load
OHE (1.34+0.597) X 18 = 35 kg
Bracket = 60 kg
Mast 7.65 X 52 = 398 kg
OPC 0.437X18 = 8 kg

5. Wind load parallel to track


Mast = 1 X 150 X 0.203 X 7.65 = 233 kg
Bracket(for each) = 60 kg

2/3
Design of OHE Mast
Loc.No: 2024 Displacement of Bracket OHE
Type of Mast 8 X 8 BFB(9.0m) d=L T 0.291 Avg.span(m) 18.00 Implantation 2.50
Wind Perpendicular to track Wind parallel to track
Type of Load Lever arm X - axis Y - axis Type of load Lever arm X - axis Y - axis Y - axis
(m) Load (Kg) BM (Kg-m) BM (Kg-m) (m) Load (Kg) BM (Kg-m) BM (Kg-m) Load (Kg) BM (Kg-m)
Permanent (Horiz. point load) Lp d*BM / i Temporary Wind load Lw d*BM / i load Lw
OHE 6.50 356 2314 269 OHE 6.50 47 306 36
OPC 7.46 89 663 OPC 7.46 23 171
Total 445 2978 269 Mast 3.83 233 891 233 891
H1 M1 M3 Bracket 6.45 60 387

Vertical load
X-axis Y-axis
Lever arm Load BM BM (Kg-m)
(m) (kg) (kgm) d*BM / i
OHE+B/2+M
an+kit 2.302 145 334 39 Total 303 M5= 1368.2 M7= 36 H3= 293 M6= 1278
H2 M1= 2977.5 M3= 269 X-axis M3= 269
1/2*Bracket 30 M2= 334 M4= 39 M1= 2978 M4= 39
Mast 398 M2= 334
OPC 8 Wind Perpendicular to track Wind parallel to track
x-axis y-axis x-axis y-axis
Total 581 334 39 Total BM at top of Foundation 4680 344 3312 1586
V1 M2 M4
Proposed FBM Code : 147

3/3