You are on page 1of 3

Assignment No.

03 Total Marks: 20
Semester: Spring 2019
CS615 Software Project Management Due Date: 18th July 2019

Assignment no. 3 covers Lec#23 to Lec#27.

Objectives of Assignment:

 You will learn the project and its management along with software process models.

Uploading instructions:

 Your assignment must be in .doc format.(Any other formats like scan images, PDF, Zip, rar, bmp, docx
etc will not be accepted).
 No assignment will be accepted through email.

Rules for Marking:

It should be clear that your assignment will not get any credit if:

 The assignment is submitted after due date.


 The submitted assignment does not open or file is corrupted.
 Your assignment is copied from internet, handouts or from any other student
(Strict disciplinary action will be taken in this case).

Assignment

Question 1: 20 Marks

Success of any project depends on planning. So life cycle planning is very critical and important in organizations.
You are required to identify the name of life cycle from the given life cycle names and name of each activity
against the given details relevant to that life cycle. Life cycles (Business life cycle, product life cycle and project
life cycle).

Lifecycle Relationship 1

Life Cycle Name: ______________________


 How these things need to be done?

 Which service and facilities are going to


introduce and revised?
 Kind of product

 Is this concept durable?


 Is it workable?
 Is it cost effective?
 Is it manageable?
 Will it help to improve the efficiency
and performance?

 Continues long term plan to migrate


from one system to the new system

 Requirement Analysis
 Situation audit
 Need assessment
 Policy of organization
 Policy of the users
 Who intends to use the facility?
 Overall policy of the product
 To what extents the technology should
be introduced?

Lifecycle Relationship 2

Life Cycle Name: __________________


 Put into the operation and do all those
convertible things which are required
so that new facility going to be used.

 Put that product or facility into use


 Acquire that product or facility
 Materializing the product
 Product has been made available

 Proposed kind of services


 Kind of product which has been
demanded as a result of assessment and
to comply the policy statement
 Technical viability
 Financial viability

Lifecycle Relationship 3

Life Cycle Name: _______________

 This phase start after performing all the


tasks and trainings

 Commissioning of the facility

 Build team
 Generate the resources
 Allocate resources
 Software life cycle selection
 Development process starts
 Product test and verified

 Why the user need this facility?

Note: you are required to watch video lessons and consult handouts to solve this assignment.

Deadline: Your assignment must be uploaded/submitted on or before 18th July 2019.

You might also like