You are on page 1of 12

CategoryType Group Category Sub Category

BE Construction Management

BE Construction Management

BE Construction Management

Construction Management

Construction Management

Construction Management
Construction Management
Construction Management
Construction Management
Construction Management
Construction Management
Construction Management

Construction Management

Construction Management
Construction Management
Construction Management
Construction Management
Construction Management
Construction Management
Construction Management
Construction Management

Construction Management

Construction Management
Construction Management

Construction Management
Construction Management

Construction Management

Construction Management

Construction Management
Construction Management
Construction Management
Construction Management
Construction Management
Construction Management
Construction Management
Construction Management
Construction Management
Construction Management
Construction Management
Construction Management
Construction Management
Construction Management
Construction Management
Construction Management
Construction Management
Construction Management

Construction Management
Construction Management
Construction Management
Construction Management
Comprehension Question A B

The
The compoun
discounte ding
d future present
cash flows cash flows
Present worth is to the to the
present future

Following document define the legal rights and obligations of General


the parties and may be Condition
described as the regulations under which the contract will be s of
performed. Specificati Contract
ons

Before During
commenc implemen
ement of tation of
the the
project project
Project monitoring is required

While designing a project by an engineer,_________should be


taken into
account to protect cultural heritage All possible No protecti

Project feasibility report is aimed at; Informing Attracting

Arbitratio
n
The first preferred way to resolve a dispute between the contract Litigation
Economic saving of time results by crashing cheapest cricheapest no
The process of incorporating changes and rescheduling or replannlevelling resource s
Slack time refers to an activity an event
For which of the following materials, the output of power shovelsMoist loamGood comm
the fund
for
rebuilding
a
structure
when its
economic meet
life is over maintena
Sinking fund is raised to nce costs
The probability of completion of any activity within its expected 50% 84.10%

If the expected time of completion of a project is 60 weeks


with a standard deviation of 5 weeks, the probability of 97.7%
mpleting the project in 50 weeks and 65 weeks respectively 2.3% and and
will be 84.1% 84.1%

If the gross vehicle weight of a truck is 30 t and rolling


resistance is 30 kg/tonne, then the tractive effort required to ep
the truck moving at a uniform speed is 30 kg 300 kg
Which of the following excavators is most suitable for digging u Hoe Clam shell
Updating may result in change of crdecrease o
The direct cost of a project with respect to normal time is minimum maximum
The time with which direct cost does not reduce with the increasnormal tim optimistic
The independent float affects only preceding asucceeding
Free float is mainly used to identify theactivity ide
Total float for any activity is defined as the difference between its latest f its latest s

At a work site, statistical quality control of concrete means measurement


applying th

The original cost of an equipment is Rs.10,000/-. Its salvage


value at the end of
its total useful life of five years is Rs. 1,000/-. Its book value at
the end of two
years of its useful life (as per straight line method of evaluation
of
depreciation) will be Rs. 8,800/- Rs. 7,600/-
Grader is used mainly for trimming anshaping an

For excavating utility trenches with precise control of depth,


the excavation
equipment used is Hoe Shovel
Sensitivity analysis is a study of comparisoncomparison

Which one of the following is not an excavating & moving type o Bulldozer Clam shell

In time-cost optimization of a project, crashing is done.


on all the a on all the a

variation
in cost in
materials
element,
labour
element
and
petrol-oil-
lubricant
During the construction period, price variation clause in contract increase in element
The performance of a specific task in CPM is known as dummy event
The final technical authority of a project is Assistant E Executive
Time and progress chart of a construction is also known as Bar chart Gantt chart
free float
of the
activity
must be independ
zero but ent float
independ must be
ent float zero but
need not free float
be need not
Whenever an activity has zero total float, then zero be zero
Total float for any activity is defined as the difference between its latest f its latest s
Select the incorrect statement. A critical A critical
Critical path is always lo is always s
Economic saving of time results by crashing cheapest cricheapest no
In resources levelling total durat total durat
In company’s environment, company’s customers are part of whicInternal en Micro envi
A company's ability to meet its short-term financial obligations liquidity ra profitabilit
An event is A definite j A definite
An activity requires events time and r
Gantt chart is drawn for time versusresources v
CPM means computer critical pa
CPM net work is event orienslack orien
If the value of variance is more, then certainty i probability

Modular co-ordination of construction means proper planning execution


Various activities of a project, are shown on bar chart by Vertical lin Horizontal l
For the execution of a project, a contractor is a person an agency
A dual event? is the head consumes n
C D CorrectAnswer Question Level Reference / Justifica Bloom's Taxonomy

The
current The
market opportuni
value of ty cost at
the the
investme present
nt value.
C

Special pro Bill of QuanB

At any
stage of
the
After project
completio deemed
n of the necessary
project D

No care
Minimum pr A

Giving
details of
resources
Justifying C

NegotiationMediation C
costliest crinon-criticalD
updating critical pat A
both event none of th B
We|l blasted rock WetA
a part of
the
money
kept in
reserve
for
the total providing
sum to be additional
paid to
the structures
municipal and
authoritie structural
s by the modificati
tenants ons A
99.90% 100% B

97.7 % 15.9%
and and
15.9% 97.7% A

900 kg 1000 kg B
Dipper shovDrag line B
increase of the above B
zero infinite A
crash time standard ti A
the particulnone of th B
identify th none of ab C
its latest s its earliest B

reduction
in costs
for the
removal
of defects
reduction i B

Rs. 6,400/- Rs. 5,000/- C


finishing a finishing, D

Drag line None of th C


change in oeconomics oC

Dump
truck
Scraper D

on
original
critical
activities
only on and those
activities that
lying on become
the critical at
original any stage
critical of
path and crashing
having in the
flatter order of
cost ascending
slopes cost slope D

variation i rate of infl B


activity constant B
Superinten Chief EnginD
Modified many of the D
free float
free float and
and independ
independ ent float
ent float both need
both must not be
be zero zero C
its latest s its earliest B
Critical act Critical act D
may be lon may be shoA
costliest cricostliest noA
uniform de cost of projC
Macro enviexternal e C
activity ra leverage r A
The terminaA definite pC
resources energy and A
activity ve progress veA
controlling crucial pr B
activity ori resources oriented
uncertaintyprobability C

all the
above
designing D
Dots Crosses A
a firm all the abo D
is the begi is any even D