Emergency Rescue Plan

Work activity: Operation and maintenance (O&M) Date:27/4/2020

Site: - TPP& WHRB – JKLC , SIROHI

Communication:
What Communication systems will be used between the suspended worker and supervisor /rescue team?

Direct Voice Communication Mobile Phone


Whistle Two-way Radios/Hand –sets

Others; PA System

Emergency Contact:

In the event of a rescue requirement, the supervisor will immediately alert the rescue team.

Rescue Team and supporting Member: 1. Mr. Hardik Patel - Station Manager (TPP)

2. Mr. Dilip Singh - Station manager (WHRB)

3. Mr. Gurbinder Singh – Operation Manager (TPP)

4. Shashi Kumar – Safety Officer (Both Side)

5. Mr. Ashok Kumar Admin officer (TPP)

6. Mr. Nilesh Dubey – Admin officer (WHRB)

7. Mr. Anil Sharma – Sr. Electrical engineer (TPP)

8. Mr. Nitesh Dubey – Sr. Electrical Engineer (WHRB)

9. Mr. Sandeep Kundara – Sr. Instrument Engineer (TPP)

10.Mr. Kunhal Pareta - Instrument Engineer (WHRB)

11. Mr. Raju Chouhan – Maintenance Manager (TPP)

12. Mr. Jignesh Rathor – Sr. Mechanical Engineer (TPP)

13.Mr. Bhirgu Medhi – Mechanical Engineer (TPP)

14. Mr. Rajendra Solanki – Sr. Chemist (WHRB)

15. Mr. Lalit Rajpurohit – Sr. Chemist (TPP)

16. Mr. Vikram Parihar – Store Officer

ENC: 9785455800 OHC:2299/9785455958 FIRE:2222/3000/9785455577


OHS/FT39
Emergency Rescue Plan

Location: JKLC, SIROHI Supervisor: -------------

First Aid Attendant(S): 30 members are available here at JKLC both site and his name is displayed near every
first aid box

Safety of Rescuers:

Are Rescuers trained and competent to use of rescue equipment? Yes/No


Are there a sufficient number of rescuers available? Yes/No YES

Is Rescue Equipment appropriate for nature of work? Yes/No YES


YES

What obstructions are in the way of reaching the location? (Ambulance , Fire Tender, etc.)
NIL

Have assessment been made of anchor point and are acceptable? Yes/No
Has Consideration been given to the method of attaching the Casualty? Yes/No

How will Rescuers get to casualty?


Rescue ladder Pull casualty up through floor 1root
Remote rescue kit Climb repel down building 1 structure
Keys to building and roof Suspended access equipment
Elevator Arial Equipment from ground
Pull casualty through window/ balcony Crain Man basket

What equipment is needed to ensure rescue

Rescue ladder Low Height rescue kit


Rescue Kit-Winch Crane Man Basket
Decent rescue Kit Stretcher
Suspended Access Equipment First Aid Kit
Climbing on rope rescue system others; ______________________

If a person injured
Is a qualified first aider available? Yes/No
YES

Who will alert emergency service and OHC:- Thermax Control Room Centre and JKLC Main gate
OHS/FT39
Emergency Rescue Plan

How will accident scene be protected?


Prevent further Injury or damage Preserve wreckage Notify employee
Set up Barriers Take Photograph Notify to HM
Other Considerations; __________________

Weather Condition:

High Temp: 48 °C Low Temp: 18 °C Mean Temp: 27 °C


Humidity: 25% Dew Point: 9 °C Wind: 9 km/h
Visibility: 8 km

Language Barriers (agency/Contractor Staff):


Hindi / English

Approval of Work at height rescue Plan:

Name Designation Contact No Signature Remark

NIL

NIL
OHS/FT39
Emergency Rescue Plan

EMERGENCY PREPAREDNESS
AND RESPONSE MANUAL

Name of Site :-  (3X18) MW TPP & (1X15) MW WHRB


J K LAKSHAMI CEMENT(JKLC), SIROHI (RAJ)

Date :- 27/4/2020
OHS/FT39
Emergency Rescue Plan

1 SCOPE

This plan details, the emergency procedures in place at

Site Name: (3X18) MW TPP & (1X15) MW WHRB


Site Address: JK Lakshami Cement, Jay Kay Puram
Sirohi. DIST, (Raj)

2 Objective

This plan has been developed to:


1.1 Describe the procedure to be followed when an emergency is declared so that immediate
specific actions by people or on plant can be taken to lessen the loss of life and property.
1.2 Control or limit any effect that an emergency or potential emergency may have on (3X18)
MW TPP & (1X15) MW WHRB Site.
1.3 Facilitate emergency response and provide assistance on the site as may be appropriate
to the occasion.
1.4 Ensure communication of all vital information to appropriate internal and external parties as
soon as possible.
1.5 Facilitate reorganization activities so that operations can be resumed.
1.6 Provide training so that an appropriate level of preparedness can be continually maintained.
1.7 Provide for a basis for updating and reviewing emergency procedures.

3 DEFINITION

3.1 Emergency
An emergency is any condition or situation, which requires assistance over and above the
capability of personnel present and which has the potential to cause serious injury or loss of
life, major damage to property and disruptions on-site and/or off-site and requires the use of
outside resources to handle it effectively.
3.2 Emergency Response Plan
The Emergency Plan basically provides a clear statement of definite assignments of
responsibilities and authorities of the Emergency Organization. Its objective is to help
contain and control incidents, to safeguard employees and others who may be affected and
to minimize damage.
3.3 Site main Controller
The Site main Controller is overall responsible for establishing and operating the
emergency plan; schedules and reviews trials of the emergency plan; ensures emergency
coordinators have trained emergency squads; and decides the best use of resources during
emergency.
3.4 Incidence Controller
The Incidence Controller is the head of emergency operation team. He controls the
activities of all emergency coordinators being physically present at site and gives feed back
to Site main Controller.
OHS/FT39
Emergency Rescue Plan

3.5 Fire Team Coordinator


Fire team Coordinator refers to someone responsible for ensuring trained fire fighters are
available round the clock in plant with required equipments to meet any fire hazard and
ensures that suitably trained alternate is available.
3.6 First Aid Team Coordinator
First Aid / Rescue Coordinator refers to someone responsible for ensuring that there is
available a group of trained ‘First Aiders’ to provide assistance to victims in emergency;
identifies an emergency sick bay in conjunction with the emergency controller; and ensures
basic first aid kits and equipment are available for emergency purposes.
3.7 Mechanical Service Coordinator
Mechanical Service Coordinator refers to someone responsible for ensuring that support
services with regards to any mechanical system is in place; trained squad is available to
provide support for mechanical system; and suitably trained alternate is available.
3.8 Electrical Service Coordinator
Electrical Service Coordinator refers to someone responsible for ensuring that plant and
site main switches are identified and could be safely isolated during emergency.
3.9 Emergency Control Centre
Emergency Control Centre is a place safe away from danger zone having all
communication media to command and control the operation team as well as to seek help
from external sources.
Emergency Control Centre of (3X18) MW TPP & (1X15) MW WHRB is at Control room.
3.10 Communication officer
Communication officer refers to a person is authorized to establish the
Communication with customer, Govt. authorities and also seek help from other external agencies.
3.11 Assembly point

Assembly point is the safer place defined for people to be assembled during emergency
where the head counter will ensure that all people are evacuated safely from hazardous
area.
The assembly points defined for JKLC , Sirohi site is
1. Assembly point I : In front of Thermax office,
2. Assembly point II : Near DM Plant at TPP area,
3. Assembly point III : In front of AHP at TPP area,
4. Assembly point IV : In front of ACC Fan at WHRB area

4 Organisation chart of emergency control team


OHS/FT39
Emergency Rescue Plan

Site Main Controller

Incident Controller

Safety Officer ERT Team Members Communication


Officer

Fire fighting crew Engineers, Electrician,


Operators, Helpers

First Aid Team

ROLE OF SITE MAIN CONTROLLER:-Site main controller is the main controller who will lead the
controlling of the fire incident. He will -

 Call the fire tender.


 Ensure that unwanted persons are safely removed from the effected area
 Direct the fire tender to reach the affected area
 Ensure that have gathered in the demarcated area, called Assembly point.
 Extend medical help for wounded.
 Remove casualties.

ROLE OF INCIDENT CONTROLLER:-In absence of site main controller he will act as main

 Site controller. He will –


 Inform site main controller about the incident.
 Call the fire tender.
 Ensure that unwanted persons are safe removed from the effected area.
 Direct the fire tender to reach the affected area.
 Ensure that have gathered in the demarcated area, called Assembly point.
 Provide Safety Appliance.
 Guide external fire tender to approach the affected area.
 Help in searching for casualties.
 Collect and preserve evidence fire further inquiry.
OHS/FT39
Emergency Rescue Plan

ROLE OF TEAM MEMBER: - Team member are the field operating staff that will be always available at
site. During fire fighting operation they will assist the fire man.

Note: If client has its own emergency plan and as per that the roles and responsibilities of
individuals and teams are defined and in case of emergency the effects spread beyond our site,
Thermax (Site main controller) has to inform client for getting help of Emergency Services like Fire
brigade, additional ambulance, security, etc.

5 EMERGENCY CONTACT NUMBERS

5.1.1.1 INTERNAL EMERGENCY TELEPHONE NUMBERS:

Name Contact Number

Emergency control center TPP , 3x 18 MW 9785455800

Emergency control center WHRB , 1x15 MW 9694097256

Site main controller Mr. Hardik Patel (TPP) 9428389418

Incident controller Mr. Gurbinder Singh (TPP) 8289028759

Site main controller Mr. Dilip Singh (WHRB) 9694097258

Safety officer Mr. Shashi Kumar 9785455967

(TPP & WHRB)

Fire fighting team leader Mr. Raju Chouhan (TPP) 9826647885

First aid team leader Mr. Ashok Mali (TPP) 8347055030

First aid team leader Mr. Nilesh Dubey (WHRB) 8305025821

Team Member Mr. Mohammad Hussain 9983048188


(TPP)

Team Member Mr. Anil Sharma (TPP) 7227004742

Team Member Mr. Lalit Rajpurohit (TPP) 9785608165

Team Member Mr. Rajesh Shaw (TPP) 9439114948

Team Member Mr. Vikram Parihar (TPP) 8426041451

Team Member 6260618361


Mr. Aditya Sisodhiya (TPP)

Team Member Mr. Ujjwal Kheto (TPP) 8637073620


OHS/FT39
Emergency Rescue Plan

Team Member Mr. Kunhal Pareta (TPP) 9887357310

Team Member Mr. Rajender Singh (TPP) 7740931939

Team Member Mr. Bhrigu Medhi (TPP) 9915292653

Team Member Mr. Balram Mali (TPP) 9887878944

Team Member Mr. Yogendra Yadav(TPP) 9456836583

Team Member Mr.Prashant Bhera (TPP) 9437259588

Team Member Mr. Vikash Saini ( TPP) 7014419652

Team Member Mr. Nitesh Dubey (WHRB) 9057579669

Team Member Mr. Manoj Rawal (WHRB) 9694532083

Team Member Mr. Vishal Kumar(WHRB) 8290066159

Team Member 9413774819


Mr. Ravindra Mali (WHRB)

Team Member 9610249579


Mr. Rajendra Singh (WHRB)

Team Member Mr. Asutosh Kumar 8895207267


(WHRB)

Team Member Mr. Rakesh Singh 8146718742

Team Member Mr. Vijay Sawami (WHRB) 9624057205

Team Member Mr. Naresh Mali (WHRB) 6350498422

Team Member Mr.Kanhiya Lal (WHRB) 9782522971

5.2.1.2 LOCAL EMERGENCY TELEPHONE NUMBERS:

Fire service 2222 / 3000 / 9785455577

First aid service 2299 / 9785455958

5.3 EXTERNAL EMERGENCY TELEPHONE NUMBERS:

Fire station,
OHS/FT39
Emergency Rescue Plan

Hospital (Ambulance Service Gov 02971245607


Hospital Pindwara, Sirohi ( Raj) )

Police Station 02972223100 / 02971282100

Sirohi Administration (DM) 0297221187 / 0297221188

6. GENERAL INCIDENT

6.1 EMERGENCY PLAN – EXECUTION

Emergency Control Center is at control room TPP & WHRB, JKLC site.

Personnel from all departments/agencies should be assembled orderly at their assembly


point where headcount can be carried out by headcounter.

Personnel are to remain at the assembly point until instruction is given by the Site main
Controller / Incident Controller that the emergency is over and they could return to normal
duties. The assembled personnel can then leave the assembly point in an orderly manner.

6.2 EMERGENCY DECLARATION

6.2.1 INITIATION OF EMERGENCY PLAN

The emergency plan comes into effect when an emergency is declared at TPP & WHRB,
JKLC site. The plan may be affected to the whole site or any particular area(s) of site
depending up on the nature of emergency. The applicability will be decided by Site main
Controller / Incident Controller.

6.2.2 DETERMINATION OF EMERGENCY

Any employee can declare an emergency in situation that involves an escalating fire,
serious injury, loss of life, extensive damage to property or temporary or permanent
OHS/FT39
Emergency Rescue Plan

damage to the environment and which requires actions that are beyond and above the
capability of personnel present at that time.

6.2.3 ASSESMENT OF EMERGENCY.

Initially at site the person first observed the situation can alert others by blowing whistle
repeatedly. The work group supervisor/ concerned engineer/ any site person should inform
the same to CEC/ SEC/ any emergency team member as soon as possible. An emergency
is declared by actuating the Emergency Alarm. This will sound a wailing siren 3 times for
10s at gap of 5 seconds.

/ \_/ \_/ \
10s 5s 10s 5s 10s

6.2.4 PROCEDURES

(a) Site main controller will rush to emergency control room and take over the command and
control.
(b) Incident controller and his coordinators will rush to the exact location of emergency. Incident
controller will give feed back of location to Site main controller. Emergency /department
coordinators will lead their respective teams for emergency actions as instructed by Site main
controller.
(c) Other Members of the emergency team should as far as practicable proceed
immediately to the scene of emergency and report to their respective coordinators.
(d) After getting information from Incident controller, he will specify the suitable safe
assembly point away from emergency. Site main controller will check the head count of
emergency response team members before starting operation.
(e) Emergency coordinators who are at the scene of emergency could communicate with
the Control Center using walkie-talkie or phone.
(e) All personnel (employees and visitors) should stop the task they are performing and
evacuate plant safely and accumulate at the suitable assembly point as declared and
those who are not part of emergency response team should stay at assembly point,
report to head counter and continue to remain at the assembly point in an orderly
manner until the Site main controller gives instruction to return to normal duties.

No employee should go to the site of emergency unless he is a


Member of the Emergency Response team or has been advised to do so.

7. MOST PROBABLE TYPES OF EMERGENCY.

At TPP & WHRB, JKLC site the most probable hazardous conditions those might generate an
emergency situation are as follows.
OHS/FT39
Emergency Rescue Plan

 Medical Emergencies.
 Major Fire hazards.
 Natural disaster like Earth quake & cyclone.
 Boiler drum burst.
 Leakage of Chemical.

8. ACTION DURING EMERGENCY.

8.1 MEDICAL EMERGENCY OR PERSONNEL INJURY:

A medical emergency may appear at site due to several reasons like

 Fall from height.


 Electric shock & Burn.
 Snake bite/Insects bite.

Snake Bite
Bite from a venomous snake, including rattlesnake, copperhead, water moccasin or coral snake. Bites on
the extremities are most common, but bites on the head and trunk are most dangerous. They are likely to
happen to person working in mines / plant.

Causes
Bites from venomous snakes are most likely to occur during outdoor activities in warm months in areas
where venomous snakes are abundant.

First aid

Reassure the victim


Calm the victim down. Un-necessary panic will only raise the pulse rate and blood pressure and moves the
venom into the system faster. Tell the victim that 70% of snakebites are from non-poisonous species. Of
the remaining 30%, only half will actually involve injecting venom. The chances are they are OK.

Immobilize the bitten limb without compression.


OHS/FT39
Emergency Rescue Plan

If the bite is on a hand or arm place it in a sling bandage or use a piece of cloth to support the arm. In the
case of a leg bite, use a splint to support both legs and bandage them together. Clean the wound and apply
a tighter bandage just above the bite, we are only trying to Immobilize not apply any pressure.

Get the patient to Hospital as fast as safely possible.


Don’t waste time, seeking traditional remedies or applying any drugs or chemicals to the victim. Science
has shown that traditional remedies do not work and simply waste valuable time. Snakestones do not
absorb venom and many herbal remedies make the situation worse. Keep the patient as immobile as
possible.

Tell the Doctor any of the following signs appearing on the way to the
hospital.
The Doctor will want to know if any of the following signs or symptoms are noticeable on the journey to the
hospital:

 Difficulty breathing. If the patient stops breathing, give artificial respiration. In Cobra and Krait bites
this will save the victims life.
 Drooping eyelids
 Bleeding from the gums or any unusual bruising appearing.
 Increases in any swelling. Carry a pen and mark the limit of the swelling every 10 minutes or so
 Drowsiness
 Difficulty speaking
 Bleeding from the wound that does not seem to stop

Exposure to Electrical shock


OHS/FT39
Emergency Rescue Plan
OHS/FT39
Emergency Rescue Plan

Place your other hand directly on top of the first hand. Try to keep your fingers off of the chest by interlacing
them or holding them upward

Adult Child Infant

Skill

Components

HAND POSITION Two hands in centre of Two hands in Two or three


chest (on lower half of centre of chest (on fingers in centre of
sternum) lower half of chest (on lower
sternum) half of sternum,
just below nipple
line)

CHEST At least 2 inches About least 2 inches About 11⁄2 inches


COMPRESSIONS

RESCUE Until the chest clearly Until the chest Until the chest
BREATHS rises (about 1 second clearly rises (about clearly rises (about
per breath) 1 second per 1 second per
breath) breath)

CYCLE 30 chest compressions 30 chest 30 chest


and 2 rescue breaths compressions and 2 compressions and
rescue breaths 2 rescue breaths
OHS/FT39
Emergency Rescue Plan

RATE 30 chest compressions 30 chest 30 chest


in about 18 seconds (at compressions in compressions in
least 100 about 18 seconds about 18 seconds
compressions per (at least 100 (at least 100
minute) compressions per compressions per
minute) minute)

Heat Stroke
Caused by failure of “thermostat” in the brain.

Body becomes dangerously overheated due to prolonged exposure to heat.

Symptoms

• Confusion or strange behaviour


• Vomiting
• Red, hot and dry skin
• Shallow breathing
• Convulsions
• Unconsciousness
Dos

 Send for help and medical help


 Move the victim to the cool and shady area
 Loosen or remove tight clothing
 Sponge or spray the victim with cool water and fan the victim
 If victim stops responding, start steps of CPR

Don’ts

 Do not wait to begin cooling


 Do not continue cooling once the victim is normal
 Do not rub alcohol or any other thing on victim’s skin

Do not give anything by mouth if victim is unconsciousness, cannot swallow, confused or had a seizure

4. Burns & Scalds

Burns are injuries that result from dry heat, extreme cold, corrosive substances, friction, or radiation,
including the sun’s rays

Scalds are caused by wet heat from hot liquids & vapors.

Extent of Burns - Can be measured according to “Rules of 9”


OHS/FT39
Emergency Rescue Plan

“RULE OF NINES”

 Any partial thickness burn of 1% or


>1% must be seen by the Doctor

 A partial thickness burn of >9% will


cause shock to develop & needs
hospital treatment.

 Full thickness burn requires hospital


treatment

Dos

 Cool burns immediately with water till burning sensation stops


 Cover the burns with clean cloth
 If clothes have caught fire, Shout Stop Drop Roll and put wet blanket to extinguish fire
Don’ts

 Do not apply cold water or ice


 Do not apply ink, toothpaste, ointment, oil, butter etc.
 Do not open the blisters
 Do not remove burnt and adhered clothes
OHS/FT39
Emergency Rescue Plan

Exposure to Chemicals

Routes of exposure

1) Direct skin contact


2) Direct eye contact
3) Inhalation
4) Ingestion

Hazards

 Skin Irritation
 Eye Irritation
 Inhalation Effects
 Ingestion Effects
 Carcinogenicity
 Mutagenicity

First Aid Measures

 Scene safety for self and for the casualty


 Bring the casualty to the fresh air or open environment
 Look for respiration if not breathing start CPR
 Remove all contaminated clothes from the body
 Flush the affected area with large quantities of water
 Wash the eyes in running water at least for 20 minutes
 Do not induce vomiting
 Do not give anything to eat or drink if unconscious
 Seek medical attention as soon as possible
OHS/FT39
Emergency Rescue Plan

ACTION REQUIRED:

 The emergency preparedness & response team should rush to the location as soon as possible
after getting the information.
 Avoid unnecessary gathering of people at the spot.
 If the emergency is associated with live electric line then quick action should be taken to cut the
power supply.
 The victim(s) should be rescued from the hazardous area and shifted to a safer place.
 Provide First Aid to all injured employees regardless of severity.
 Follow appropriate first aid methods as per nature of injury.
 Give artificial respiration if the victim is unconscious.
 Call ambulance service if the injury is major and beyond control under first aid.
 Immediately shift the victim(s) to hospital if the injury is serious and needs immediate medical
treatment.

8.2 MAJOR FIRE HAZARDS:

An emergency situation can occur in the event of major fire at different locations in side plant. The
fire may be a result of electric fault or spark from hot works like welding, gas cutting. The most
probable classes of fire are

On event of Fire following actions needs to be taken on top priority:


Fire marshals and First Aider must response on Major fire emergency.
OHS/FT39
Emergency Rescue Plan

 Isolate the area.


 Switch off supply.
 Evacuate all personnel to safe assembly point.
 Assembly point should be chosen considering wind direction
 Go to opposite direction of Wind
 Try & Shut off the source of Fire
 Operate Fire Extinguishers if it’s a small fire.
 Operate Fire Hydrant network from different approachable points
 Call for Emergency services if needed.
 Start Rescue operation if any personal are trapped in the fire.
 Ensure that affected personal (if any) are moved to a safe & well- Ventilated place.
 First Aid Treatment to be provided to affected personnel (if any)
 Move affected to hospital if needed (if any).

On event of Electrical Fire or short circuit:


 Immediately isolate the supply between two junction points or as directed by site
coordinator.
 Use DCP / CO2 / ABC extinguisher to put off the fire if it’s small.
 Call Fire service department.
8.3 CHLORINE LEAKAGE:

8.4.1 FIRST AID MEASURES:

INHALATION:

Immediately move to fresh air.


If not breathing, give artificial respiration.
Competent personnel may give oxygen when necessary.
Keep patient warm.
Send to hospital.

SKIN CONTACT:

Avoid breathing vapour.


Immediately flush affected areas with plenty of warm water while removing contaminated clothing
and shoes.
Discard clothing and shoes.
Send to hospital.

EYE CONTACT:

Immediately flush eyes thoroughly with warm water for at least 15 minutes.
Hold the eyelids open and away from the eyeballs to ensure that all surfaces are flushed thoroughly.
See a physician, preferably an ophthalmologist, immediately.

8.4.2 STEPS TO BE TAKEN TO CONTROL THE RELEASE:


OHS/FT39
Emergency Rescue Plan

 Immediately evacuate all personnel from danger area.


 Do not approach area without self-contained breathing apparatus and protective clothing.
 Oxidizing agent; contact with flammable materials may cause fire or explosion.
 Do not spray water directly on source of flow or leakage; this may accelerate flow.
 Reduce vapours with fog or fine water spray.
 Shut off flow if without risk.
 Ventilate area or move cylinder to a well-ventilated area.
 Prevent waste from contaminating the surrounding environment.
 Keep personnel away.

NOTE: Blower with sensor is installed at chlorine storage which will be operated automatically as
soon as the sensor detects chlorine leakage. The leakage gas should be blown to caustic
neutralization tank.

8.4 NATURAL DISASTER LIKE EARTH QUAKE & CYCLONE

As it is known we don’t have control over natural calamities. Hence we can take no measure to
stop the emergency generated due to a natural disaster.

In case of having prior information regarding the possibility of such calamities all work should be
stopped for the period of these exist.

In case of sudden arrival of such disasters the following measures can be taken to minimize the
destructive effect of the same.

8.7.1 Cyclonic winds

On event of Cyclonic Wind following actions needs to be taken on top priority:


 Switch “Off” power and utilities so that damages to property & life can be
restricted.
 Stop all height works and outdoor works.
 Ensure all personnel are relocated to a safe destination.
 Contact External emergency services for help if required.

8.7.2 Earthquake

On event of Earthquake following actions needs to be taken on top priority:


 Immediately stop all project activities at site.
 Ensure all personnel are relocated to a safe destination.
 Keep all cylinder in upright position and well tight with chain or other material to
restrict from falling.
 Close all product supply from the source.
OHS/FT39
Emergency Rescue Plan

 First Aid Treatment to be provided to affected personnel wherever required.


 Contact External emergency services for help if required.

8.5 Boiler Drum Burst.

Boiler drum burst and other associated emergencies are as below.

 Leakage in steam line.


 Leakage in high pressure water lines.

In event of boiler drum burst or leakage in steam lines steps to be followed are.

Boilers drum Bursting.

Steps to be taken are

 Cut off the fuel feed to boiler.


 Open all the vents and drains.
 Trip PA fan.
 Barricade the entrance to boiler, to avoid entry of
 Start rescue operation for the affected people.
 Evacuate all the persons to safe assembly point.

Leakage in steam line

 Isolate the steam line


 Barricade the affected area.
 Remove all the contractor personnel from the affected.
 Stop the turbine & boiler of the affected unit.
 If the leakage is in the main header, stop the power plant.
 Care to be taken to maintain drum water level in all situations.
Leakage in high pressure water line

 Isolate the feed water line


 Barricade the affected area.
 Remove all the contractor personnel from the affected area.
 Stop the turbine & boiler of the affected unit.
 If the leakage is in the main header, stop the power plant.
 Care to be taken to maintain drum water level in all situation

8.6 NATURAL DISASTER LIKE EARTH QUAKE & CYCLONE

As it is known we don’t have control over natural calamities. Hence we can take no measure to
stop the emergency generated due to a natural disaster.
OHS/FT39
Emergency Rescue Plan

In case of having prior information regarding the possibility of such calamities all work should be
stopped for the period of these exist.

In case of sudden arrival of such disasters the following measures can be taken to minimize the
destructive effect of the same.

8.7 PROCEDURE TO BE FOLLOWED IN CASE OF A MEDICAL EMERGENCY OR ACCIDENT

 In the event of a medical emergency or accident within the site during working hours, the employee
or the supervisor should inform the Station Manager /Admin /Safety personals, they immediately
arrange for the medical attention or seek other medical attention i.e First aid from the client First aid
centre which ever deems appropriate. The Clients ambulance is used for the serious medical
emergency which requires hospital aid. The injured Personals are shifted to the hospital for further
treatment.

9.0 TERMINATION OF EMERGENCY

THIS IS APPLICABLE FOR EMERGENCY SITUATION WHICH REQUIRES EVACUATION.


TERMINATION OF EMERGENCY WILL BE DECLARED BY SITE MAIN CONTROLLER.
BEFORE DECLARING TERMINATION SITE MAIN CONTROLLER WILL ENSURE THAT
THE EMERGENCY SITUATION IS HANDLED SUCCESSFULLY AND NO MORE
POTENTIAL HAZARD IS THERE.
THE TERMINATION OF EMERGENCY WILL BE DECLARED BY RAISING THE
TERMINATION SIREN CONTINUOUSLY FOR 30 SECONDS.

10.0 EMERGENCY EQUIPMENT


 Fire detection, fire protection, and all other emergency equipment required in case of
emergency identified at site, will be adequately maintained at all locations by contractors /
agency working in the area. In case of default Thermax shall supply and debit to the contractors.
 Fire prevention measures will be maintained at the Centre to effectively protect the safety of the
employees and buildings/equipment, as well as to comply with applicable fire codes and
regulations by the client.
 All equipment are to be tested and inspected regularly & periodically by the safety officers to
measure the effectiveness of the Firefighting equipment’s.

11.0 DIESEL TANK LARGE SCALE FIRE IN FUEL OIL AREA

PREVENTIVE MEASURES AND PLANS


OHS/FT39
Emergency Rescue Plan

Based on the preliminary identification, the major hazardous installation at Power plant are storage of
capacity 25 KL and sodium hypo chloride 1000 Ltr. are the secondary fuels for combustion support at low
load and for Start-up. Following are the important considerations for loading/unloading of hazardous
chemicals.

1. Written instructions will be given which clearly define responsibilities for all personnel involved in
loading/unloading operations.

2. A responsible person normally a section supervisor on site will check that the quantity and type of fuel oil
being transferred is suitable for the receiving tanks. Tanks will be checked to see how full they are before
filling, and also during filling using the contents gauge. The maximum level device will be used to ensure
overfilling does not occur.

3. The point of transfer, where connections and disconnection are made will be sited in a well-ventilated
position.

4. Flexible hoses used for conveying fuel oil to and from truck into fixed vessels will:-

Have a means of identification. Be examined for kinks and wear on every occasion prior to use. Hose
fittings will be similarly examined, periodically checked for electrical continuity and written records of the
tests should be maintained. Properly used so that the hose will not be physically damaged or adversely
affected by the weather when not in use or when being conveyed. Loading hoses should be earth and
should also be bonded with the wagon. Replaced or repaired when damaged or worn-out. Properly used so
that the hose will not be physically damaged or adversely affected by the weather when not in use or when
being conveyed.

12.0 COMMON TO ALL ELECTRICAL PLANTS

FIRE DETECTION & PROTECTION SYSTEM


A comprehensive fire detection and protection system is envisaged for the

Complete power plant.

The following protection systems are envisaged:

i) Hydrant system for complete power plant covering main plant building, boiler area, turbine and its
auxiliaries, coal handling plant, all pump houses and miscellaneous buildings of the plant. The system shall
be complete with piping, valves, instrumentation, hoses, nozzles, hose Boxes/stations etc.

ii) Foam monitor injection system for fuel oil storage tanks consisting of foam concentrate tanks, foam
makers, valves, piping & instrumentation, etc.

.
OHS/FT39
Emergency Rescue Plan

iii) Automatic medium velocity water spray system for cable vaults and cable galleries of power plant,
consisting of smoke detectors, linear heat sensing cable detectors, deluge valves, isolation valves, piping,
instrumentation, etc.

iv) Automatic medium velocity water spray system for coal conveyors, transfer points consisting of QB
detectors, linear heat sensing cables, deluge valves, nozzles, piping, instrumentation, etc.

iv) Automatic medium velocity water spray system for un-insulated fuel oil tanks storing fuel oil having flash
point 65º C and below consisting of QB detectors, deluge valves, nozzles, piping, instrumentation, etc.

Following types of fire detection shall be employed.

1) Multi-sensor type smoke detection system.

2) Combination of both multi-sensor type and photo electric type smoke detection systems.

v) Portable and mobile fire extinguishers, such as, carbon-dioxide type, , dry chemical powder type, will be
located at strategic locations throughout the plant.

vi) Fire water storage tanks and fire water pumps would be provided. Capacity of storage tanks
requirement. It shall be provided wherever required.

vii) For the above fire water pumping station, automatic pressurization system consisting of jockey pumps
shall be provided.

viii) Complete Instrumentation and Control System for the entire fire detection and protection system shall
be provided for safe operation of the complete system.

13. FREQUENCY OF DRILLS

All type of emergencies drill to be conducted once in a year. One Mock Drill to be
conducted for each Emergency.