You are on page 1of 62

Proforma –C

Pradhan Mantri Gram Sadak yojana (PMGSY)


Check list for P.I.U. & S.T.A
(For Individual Road Works)
To be filled by PIU
Location :- State :-
1 Jammu & Kashmir DISTRICT :- JAMMU BLOCK : KHOUR
2 PACKAGE No. :- JKO5-
3 Name of Road :- From :- JOGWAN TO NEELI- NALLAH
In Built
Total In Open area :
4 Length (Km) :- 18.00 kms up area : 3 kms 15 Km
Estimated Cost Rs. :
Lakhs Average Cost; Lakhs
Cost per Km
Total Coat
Item
in Lakhs
in Lakhs

5 Pavement 516.17 28.68


CD 1230.22 68.35
others 4.05 0.23
Total 1750.44 97.02
6 Type of Proposa :- New connectivity
* If the Proposed road is a New connectivity
. Is the road a part of core network Yes
. If Yes, Through/Link Route Number
. Name of the unconnected Target Habitation (to be cross checked with CN-6) NEELI NALLAH
- List of Habitations connected enroute
- Population sub served by the proposed road. 860
Does the proposed road lead up to the Habitation for which it is supposed to provide YES
connectivity (In other words are you sure the road is not being made partially?)

-                     Does the proposed road connect the unconnected Habitation to


a)                  Another Habitation having all-weather road. (Connected Status).
b)                  Directly to an All weather road.
If (b), indicate the nature of road to which the proposed road leads. RR

·                    If the proposal is for up gradation


-                     Is the road a part of the core network
-                     Is it associated Through Route or not
-                     PCI value
-                     Age of the road
- Is it certified that there are no other Unconnected Habitations in the district. No

7. a) Whether the Proposed Road has the desired carriageway width, roadway width and road land width
(RLW). Yes

In the Built Up In the Open


Indicate the actual widths adopted for the proposed road Area (m) Area (m)

b) . a)          Carriageway 3.00 3.00


b)                  Roadway 6.00 6.00
c)                  Road Land Width 12.00 12.00
Road section details
a. Section of the Existing
Section of the Existing road showing different component layers.
b. Cross Section of the Proposed road
Cross Section of the Proposed road showing different component layers.
( Should be as per Actual Provision of DPR )

8 Base year traffic volume

Month and Year of Traffic Volume Count=

Motorised Traffic Non Motorised Traffic

Cars, Jeep Motorise Trucks Tractor trailer Buses Animal Drawn


Cycle
Days vans,Three d two LCV Cycle
Rickshaw
wheelers wheeler
Num.T
L U OL L U OL L U OL SWC
yred

ADT in the year of Traffic count "A" = "A/2"= Base year Traffic AADT (T) =
Growth rate adopted (%) =

Design Life (in years) = N.A

Number of Harvesting Season =

No. of days in each harvesting season (t) = Cummalative EASL =


Value of (n) assumed =
9 Sub grade CBR N.A
Chainage 1st & 2nd av.
Design CBR (%)
Cost
10      Cost /Km
Cost Details Unit Quantity
         (Rs. in (Rs. in Lakhs)
A. Lakhs)
General Costs
Cost of Perparation of DPR , Check Survey & CBR Testing Km. 18.00 0.72 0.04

Supply of informatory boards & logo boards Km. 18.00 1.45 0.08
Pavement Components
Cost
Cost /Km
Description of the layer Unit Quantity
(Rs. in (Rs. in Lakhs)
Lakhs)
Earth work in Excavation / Cutting Cum 279728.03 477.50 26.53
Earth work in Filling (Embankment ) Cum 66675.44 38.67 2.15
Clearing and grubbing of road hect
Dismantling of flexible pavement cum
B.
Compacting of original sub grade Cum
Sub grade (if provided seperately) Cum
Shoulder ( if not considered in the Earthwork )Berm Filling Cum
Soil + Aggregate Mix (GSB) Cum
WBM-I
WBM-II Cum
WBM-III Cum
Bituminous Layers
Prime Coat Sqm
Tack Coat Sqm
20 mm Thick Premix Sqm
Surface Dressing
C
PMC with Seal Coat Sqm
Carriage item (B - C)
(6mm-63mm) cum
Bitumen M.T
Berm filling & Subgrade filling cum

D
Cement Concrete Road Pavement Quality Concrete (M30)

Total Cost of Pavement Components 516.17 28.68


E CD Works
No. of Existing CD works

If yes, cost of improvement


Cost
Total No. of Bridge / Culvert
Location - Chainge ( Similar of CD's may be grouped together ) Unit
(Rs. in
Lakhs)
1.0m dia H.P Culvert No. 60 131.42
1.5 Mtr. Span RCC Culvert No. 12 69.91
3.00 Mtr. Span RCC Culvert No. 12 118.31
6.00 Mtr. Span RCC Culvert No. 5 108.29
flush causeway 90.0 m long RMT. 90m x 1no. 70.23
Total 90 498.16

Cost /Km
Cost
Protection Works Unit (Rs. in Lakhs)
(Rs. in Lakhs)
Retaining wall Length
a.) 3.00 Mtr. Height 1700.00 Rmt. 217.96 12.11
b.) 4.00 Mtr. Height 1200.00 Rmt. 225.14 12.51

F. 0.00
Breast wall 2135.00 Rmt. 144.12 8.01
Pitching 0.00 Sqm. 0.00 0.00
Crates 400.00 nos. 85.11 4.73
Parapet 0.00 nos. 0.00 0.00
Edge wall 1800.00 rmt. 59.73 3.32

Pucca Side Drains (if provided) 0.00 Rmt. 0.00 0.00

G. Pitched Drains (if provided)

Total cost ( Rs.) 732.06 40.67

H Setting out Refernce pillars, Back Pillars and Job Pillars 1.88 0.10

Total cost of Project ( Rs.) 1750.44 97.25


I. Any other Provisions (Please Specify)

Five Year Routine Maintenance N.A


Year Cost in Lakhs % of Const. Cost Cost /Km (Rs.)

II
II
IV
V

Total Maintenance Cost

11.    
Whether the road has Geometrics as per Rural Roads Manual (RRM) /Circular of NRRDA. Latest
      

12.     Whether CD Works / Protection works are provided as per RRM / Circular of NRRDA /
Latest
          Respective Codes.

13.    
Whether the Cost estimates are as per standard data analysis and S.S.R
         

14 Sources and the lead distance of Materials are under


Lead Distance
Material Source Material Source Lead Distance (Km)
(Km)

Stone MANAWAR TAWI 25 Steel BARI BRAHMANA 107

Cement BARI BRAHMANA 107 Hume pipe BARI BRAHMANA 107

Stone Aggregate JOURIAN 51


Sand JOGWAN 12

Certified that information provided is true

Prepared By Checked by Scrutinized by

Assistant Executive Engineer Executive Engineer Superintending Engineer


PMGSY Sub Div II PMGSY Division PMGSY Circle
Akhnoor Jammu Jammu

To be filled by S.T.A

Name of the STA

15 Is the proposed road entered on the OMMS Yes / No


If the proposal is for new connectivity
Have you satisfied yourself that the proposed road is a part of the Core Network Yes / No
16
16
Is the unconnected habitation(s) part of list of unconnected habitation as per CN-6 Yes / No

Does the proposal ensure full connectivity of the targer habitation Yes / No
Are you satisfied with the following
Engineering Survey Yes / No
17 Soil / Material Investigation Yes / No
Traffic Surveys / Estimation Yes / No
Hydraulic Studies Yes / No
18 In case, traffic is projected beyond 45CVPD, are you satisfied with the reason given Yes / No

19 In case, sub grade CBR is less than 3, has soil stabilization etc. been proposed Yes / No

20
Is the design of the following elements as per Roads Manual :

Alignment & Geometric Yes / No


Pavement Design Yes / No
CD Works and protection Measures Yes / No
Side Drains Yes / No
Integration for cross and longitudinal drainage Yes / No
21 Does the estimation confirm to standard rate analysis and SSR Yes / No
22 Does the proposal have provision for
PMGSY Logo Sign Boards Yes / No
Km / Hm stones Yes / No
Guard Stones (where necessary) Yes / No
Traffic Sign Board ( as necessary) Yes / No
23 Specific remarks, if any by STA

Certified that the Design and Estimation for the proposed road work are based on the data and SSR provided by Engineers.
The proposal may be cleared.

Technical Scrutiny Coordinator


Done by S.T.A.
Signature Signature
Name Name
Designation Designation
PROFORMA – B
PRADHAN MANTRI GRAM SADAK YOJANA (PMGSY)
Package Summary (STAGE 1)

Package No: State:- J&K District : Jammu

Type of Proposed No. of CD Cost of CD Total Estimated


Name of Road Cost of pavement Av. Cost / km
Name of Proposal Length works works cost
S. No.
Block

From To N/U Km (Rs. in lacs) Nos. (Rs. in lacs) (Rs. in lacs) (Rs. in lacs)

NEELI
1 KHOUR JOGWAN
NALLAH N 18.00 516.17 90 1230.22 1746.39

i) Road Safty and Traffic sign Boards


ii) Preparation of DPR 0.72
97.25
iii) Setting out reference, job, back pillars 1.88
iv)Supply of informatory boards & logo boards 1.45
Total 1750.44
Total Estimated Cost of Package = 1750.44 Rs. Lacs
N – New connectivity
U- Up gradation

Prepared by: Signature Technical Scrutiny Signature


Name done by: Name
Designation Asstt. Executive Engineer Designation
PMGSY Sub Division
Akhnoor

Checked by: Signature Co-ordinator Signature


Name STA: Name
Designation Asstt. Executive Engineer Designation
PMGSY Sub Division
Jammu

Scrutinized by: Signature


Name
Designation Superintending Engineer
PMGSY Circle
Jammu
BHARAT NIRMAN Formate F- 1

SUMMARY SHEET
NAME OF THE ROAD:- JOGWAN TO NEELI- NALLAH
Name of Block Total No of Habitation Unconnected Habitations Package No. JKO5-119
KHOUR >1000 500-1000 250-500 <250
5 0 0 3 2
District :- JAMMU

No. of Total Length No of New


Type of work Estimate Cost No. of Vilage Connected
Roads of Road (KM) CD Works

Pavement from CD Structure fron Total (5+6) Total SC/ST


CD Work
Formate F-5 Formate F-6 (Rs. In Lacs) Villages Villages

1 2 3 4 5 6 7 8 9
New road
one 18.00 90 516.17 1230.22 1746.39 5 1
Phase I
i) Road Safty and Traffic sign Boards
ii) Preparation of DPR 0.72
iii) Setting out reference, job, back pillars 1.88
iv)Supply of informatory boards & logo boards 1.45
Total 1750.44

Asstt. Executive Engineer Executive Engineer


PMGSY Sub- division -II PMGSY Division
Akhnoor Jammu
BHARAT NIRMAN
ROAD PROPOSED IN PMGSY FOR RURAL CONNECTIVITY (PAVEMENT LAYERS)
NAME OF THE ROAD :- JOGWAN TO NEELI- NALLAH Formate F-5
BLOCK :- KHOUR Package No. :- JKO5-119
DISTRICT :- JAMMU
DETAIL OF THICKNESS AND COST OF PAVEMENT LAYERS

Name of places
S.No

villages connected
Ens Surface
by road Facilit Roa
New ting
y d sue Total
Const.

Detail
acces Earth work Sud grade pravement

BM
upgrad
sed len fac
prepared
GSB / WBM -I WBM-II WBM-III Prime coat Tack Coat
upto col. To
ation e
use gth FW statvs
N/U typ
ABCD Km. MSS /
e
From To Carriage OMC with seal coat
item

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

NEELI Carriage Stome


1 JOGWAN NALLA N 18 Earth work in cutting GSB WBM Grade -II WBM Grade -III Primer Coat Tack Coat Aggregate 20mm thick Premix
H (6mm-63mm)
279728.03 cum
@ Rs. 170.70
477.50
Earth work in
Filling with Carriage of
Seal Coat
available Bitumen
material
66675.44 cum
@ Rs. 58.00
= 38.67
516.17
Berm filling & sub
grade fillinhg

Total 0.00 516.17

Asstt. Executive Engineer Executive Engineer


PMGSY Sub- division -II PMGSY Division
Akhnoor Jammu
BHARAT NIRMAN

ROAD PROPOSED IN PMGSY FOR RURAL CONNECTIVITY (PAVEMENT LAYERS)

NAME OF THE ROAD:- JOGWAN TO NEELI-NALLAH Formate F-6


BLOCK :- KHOUR PACKAGE No. :- JKO5-119
DISTRICT :- JAMMU Lenth of Road :- 18.00 Km

Total
New
Retaining wall Edge wall length Cause way length Total Cost earth
Name Const. Road
Detail
S.No

Hume Pipe including edge Breast wall Drain length in of work and
of the upgrad length RCC Culvert Parapets No. Crated wall
Culverts walls and parapets length in Mtr. Mtr. in proposed sub grade
Road ation Km.
length in Mtr. Mtr. in Mtr. structures preparati
N/U
on

Dia.
No. No. Span
in Mtr.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
6.00 Mtr Long
N 18 1.00 Mtr. 1.5 Mtr. 5mtr ht. Breast wall Pucca Drain Parapets Edge wall Wire Crates
Scupper
60 no.s 12 no.s Rmt. 2135 Rmt. 0.0 Rmt. 0.00 Rmt. 1800 Rmt. 0 nos. 400 no.
@ @ @ @
2.19 @ Rs. 5.83 @ Rs. @ Rs. 6750.45 1444.96 3310.35 @ Rs. 3318.44 @ Rs. 0.00 21276.46
Rs. Rs. Rs. Rs.
JOGWAN TO NEELI-NALLAH

= 131.42 = 69.91 = 0.00 = 144.12 = 0.00 = 0.00 = 59.73 = 0.00 = 85.11


3.00 Mtr. 4mtr ht. Pitch Drain Pitching
flush causway
12 no.s 1200.0 Rmt. Rmt. 0.00 Rmt.
@ 90m x
@ Rs. 9.86 @ Rs. 18761.50 @ Rs. 267.84 Rmt.
Rs. 1no.
1230.22
= 118.31 = 225.14 = 0.00 = 0.00 @ Rs. 78037.39

6.00 Mtr. 3mtr ht = 70.23

5 no.s 1700.0 Rmt.


@ 21.66 @ Rs. 12821.44

= 108.287 = 217.96

Total 131.42 296.51 443.10 144.12 0.00 0.00 59.73 70.23 85.11

Asstt. Executive Engineer Executive Engineer


PMGSY Sub- division -II PMGSY Division
Akhnoor Jammu
Total
cost of
road
upto FW
status
(15+16)

19
1

1
S.No

2
KHOUR Name of Block

NAME OF
THE

3
JOGWAN From
HABITAT
District -: Jammu
ON S
CONNECT

JE/AE
PMGSY
ED/

4
NEELI NALLAH

To
BENEFITE
D
New

5
constructi

N
N on (N)
/Associate
d through
PACKAGE NO:-JK05-

route (A)/

5A
Upgradati
on (U)
U

5B
6

18.000 ROAD LENGTH kM


7

Existing surface type


8

Cost in Lacs Quantity Details


9

Clearing /Grubing

Earthwork
10

516.17
Cutting/Filling

R/Wall 3mtr ht / 4 m
11

443.10 1700/1200
ht./5 m ht.
12

144.12 2135.00 B/Wall


13

0.00 0.00 Shoulders

Akhnoor
14

0.00 0 Subgrade preparation

PMGSY Sub- division -II


Asstt. Executive Engineer
Subbase GSB Gr-II
15

0.00 0.00
(Cum)
16

0.00 0.00 WBM Gr-II


(Pavement layer and Protective Works)

17

0.00 0.00 pitching


PRADHAN MANTRI GRAM SADAK YOJNA (PMGSY)

18

59.73 1800.00 Edge wall mtr


19

0.00 0.00 pucca drain


20

0.00 0.00 Parapet


ROADS PROPOSED IN PMGSY FOR RURAL CONNECTIVITY (Pavement layer)

21

85.11 400.00 Crated wires


22

Primer coat Sqm


Details of Thickness and cost for Pavement layers(Rs in Lacs)

23

Tack coat Sqm


24

Premix Sqm
26

Jammu
27

Carriages
PMGSY Division
Block -: KHOUR

Executive Engineer
FORMAT F-2A

Works

28
for

1248.23
and
pavement
Total cost

Protective

(in lacs)
0……………………………………………………………………………………………………………………………
FORMAT F-2B
PRADHAN MANTRI GRAM SADAK YOJNA (PMGSY)
ROADS PROPOSED IN PMGSY FOR RURAL CONNECTIVITY
(Cross drainage Structures)

District -: Jammu Package No:- JK05-


Existing CD Structures by type Details of proposed CD Structures by type
Habitation connected/Benefited

RCC
Minor Minor
Hume pipe Culvert / Hume pipe RCC Culvert / Scupper
Bridge Bridge
Scupper

Road length in km
Total cost
Total
Name of Block

Name of road

of Total cost
Block code

Population

cost of
Spa pavement of road
propose
S.No

length (M)

length (M)
Dia n/ and (18+19)
of Dia Span / d
No. (mm No. Lon No. No. No. No. Protective (Rs.
(mm) Long (M) structure
) g Works inLacs)
s
(M) from F2A

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
60 1000
JOGWAN, MUGERI, LALEY DE PARAT,

Cost 131.42 1.5M SPAN


12 1.50
NEELI-NALLAH,CHURREA
JOGWAN TO NEELI-NALLAH

Cost 69.91

3.0M SPAN
KHOUR

18.000
L-056

12 3.00
750

1
Cost 118.31
5 6.00 498.16 1248.23 1746.39
108.29
Cost FLUSH CAUSWAY
90m x 1no. 25.00

70.23

TOTAL 131.42 366.74

JE/AE Asstt. Executive Engineer ExecutiveEngineer


PMGSY PMGSY Sub- division -II PMGSY Division
Akhnoor Jammu
PRADHAN MANTRI GRAM SADAK YOJNA (PMGSY)
RATE ANALYSIS
FORMAT- F8
State -: Jammu and Kashmir Package No:- JK05-
Road From -: JOGWAN TO NEELI-NALLAH

S.No. Material Source Lead Distance (Km)


1 Stone (MANAWAR TAWI)BATTAL 25
2 Stone Aggregate (CHACK)JOURIAN 51
3 Sand JOGWAN 12
4 Cement BARI BRAHMANA 107
5 Hume Pipe BARI BRAHMANA 107
6 Steel BARI BRAHMANA 107

Asstt. Executive Engineer Executive Engineer


PMGSY Sub- division -II PMGSY Division
Akhnoor Jammu
ABSTRACT OF COST
NAME OF THE ROAD:-JOGWAN TO NEELI NALLAH
BLOCK :- KHOUR PACKAGE No. :- JK05- 119
DISTRICT :- JAMMU Length of Road :- 18.00 KM
Amount
S.NO Items Quantity Unit Rate
(Rs. inLacs)
Earth work in Cutting Km Ist to
1 279728.03 cum 170.70 477.50
18th
2 Earth work in Filling Km Ist to 18th 66675.44 cum 58.00 38.67

TOTAL 516.17
3 Retaining wall

a.) 3.00 Mtr. Height 1700.00 Rmt. 12821 217.96

b.) 4.00 Mtr. Height 1200.00 Rmt. 18761 225.14

4 Parapet 0.00 nos. 3310 0.00


5 Pucca Drain 0.00 Rmt. 1445 0.00
6 Breast wall 2135.00 Rmt. 6750 144.12
7 Crates 400.00 nos. 21276 85.11
8 Stone pitching 0.00 Rmt. 267.84 0.00
9 Edge wall 1800.00 Rmt. 3318 59.73
TOTAL 732.06
10 1.5 Mtr.Span RCC Culvert 12 nos. 5.83 69.91
11 3.0 Mtr.Span RCC Culvert 12 nos. 9.86 118.31

12 6.0 Mtr.Span RCC Culvert 5 nos. 21.66 108.29

13 1.00 Mtr.dia. H.P Culvert 60 nos. 2.19 131.42

14 90.0 Mtr. Long FLUSH CAUSEWAY 90m x 1no. Rmt. 78037.39 70.23

. TOTAL 498.16
GRANDTOTAL 1 1230.22
15 Setting out Refernce pillars 720.00 per100nos. 5562.00 0.40

16 Setting out Back Pillars 720.00 per100nos. 16213.00 1.17

17 Setting Out Job Pillars 72.00 nos. 344.00 0.31

18 Preparation of DPR , Check Survey 18.00 Km 4000.00 0.72


Supply of informatory boards &
19 1.45
logo boards
Amount
S.NO Items Quantity Unit Rate
(Rs. inLacs)

TOTAL 4.05

GRANDTOTAL 1750.44
Amount
S.NO Items Quantity Unit Rate
(Rs. inLacs)

Asstt. Executive Engineer Executive Engineer


PMGSY Sub- division -II PMGSY Division
Akhnoor Jammu
Bharat Nirman
Cost Estimate For Road Construction
NAME OF THE ROAD:- JOGWAN TO NEELI-NALLAH
BLOCK :- KHOUR PACKAGE No. :-
DISTRICT :- JAMMU Length of Road :- 18.00 KM
Amount
S. No. Description Quantity Unit Rate
(Rs. inLacs)
Clearing and grubbing of road land including uprooting vegetation grass bush shrub, saplings and trees of
1 girth upto 300mm,removal of stumps disposal of unserviceable material form road boundary as MOST 16.20 Hect 53438 8.66
specification clause 201 in (av)area of thorny jungle including of all leads & lifts complete.
Construction of reference pillar in cement cone M-15 @20mtr on both sides as per clause 1602.1 and
2 720 100No. 5562 0.40
fig1600.1(b)
Construction of back pillar in front of each reference pillar (in Cement Cone Grade M-15) as per clause No:-
3 1602.3 and as per fig.1600.1( c ) 720 100No. 16213 1.17

Construction of Job pillars ( in Cement concrete Grade M-15 ) as per clause No.1602.4 and as per Fig.1600.1
4 72 Each 437 0.31
(d)
Construction of embankment with material obtained from cutting and transporting to site spreading grading
5 to required slope and compacting to meet the requirement of tables 300.1 and 300.2 as per technical 66675.44 Cum 58.00 38.67
specifications clause 301.5 including of all leads & lifts complete.
Construction of embankment with approved material transporting to site spreading grading to required slope
6 and compacting to meet the requirement of tables 300.1 and 300.2 as per technical specification clause 301.5 - -
including of all leads & lifts complete.
Excavation in soil in hilly area by Mechanical mean including Cutting and treaming of Side slopes and
7 disposing of excavated earth within lift upto 3.00 Mtr. and lead upto 20.00 Mtr. As per technical specification 167836.82 Cum 115 193.01
1603.1
Excavation in hilly area by in Ordinary rock not require3d Blasting by Mechanical mean including Cutting
8 and treaming of Side slopes and disposing of excavated earth within lift upto 3.00 Mtr. and lead upto 20.00 69932.01 Cum 201.00 140.56
Mtr. As per technical specification 1603.2
Excavation in hilly areain hard rock required blasting by Mechanical mean including Cutting and treaming of
9 Side slopes and disposing of excavated earth within lift upto 3.00 Mtr. and lead upto 20.00 Mtr. As per 41959.20 Cum 343.00 143.92
technical specification 1603.3
Total 526.71

Asstt. Executive Engineer Executive Engineer


PMGSY Sub- division -II PMGSY Division
Akhnoor Jammu
BHARAT NIRMAN
ABSTRACT OF EARTH WORK CUTTING / FILLING
NAME OF THE ROAD:- JOGWAN TO NEELI-NALLAH
BLOCK
:- KHOUR PACKAGE No. :-
DISTRICT
BHALWAL
JAMMU Length of Road :- 18.00 KM
:- JAMMU
As Per Earth Work Chart Attached
Classification
S.N
Particulars Cutting Soft Rock Hard Rock Filling
o Hard Soil 60%
25% 15%
1 Km 1st 5367.63 3220.58 1341.91 805.14 2976.63
2 Km 2nd 19202.13 11521.28 4800.53 2880.32 13152.38
3 Km3rd 23774.38 14264.63 5943.59 3566.16 2553.63
4 Km4th 13159.25 7895.55 3289.81 1973.89 2260.13
5 Km 5th 13731.25 8238.75 3432.81 2059.69 1236.50
6 Km 6th 11522.05 6913.23 2880.51 1728.31 7414.38
7 Km 7th 16363.75 9818.25 4090.94 2454.56 7812.75
8 Km 8th 23287.13 13972.28 5821.78 3493.07 1212.38
9 Km 9th 18025.00 10815.00 4506.25 2703.75 2158.50
10 Km 10th 22347.00 13408.20 5586.75 3352.05 3262.75
11 Km 11th 16546.50 9927.90 4136.63 2481.98 6222.75
12 Km 12th 17850.98 10710.59 4462.74 2677.65 1050.00
13 Km 13th 8299.25 4979.55 2074.81 1244.89 1471.13
14 Km 14th 5039.00 3023.40 1259.75 755.85 2580.38
15 Km 15th 14864.88 8918.93 3716.22 2229.73 3145.75
16 Km 16th 13336.38 8001.83 3334.09 2000.46 2095.25
17 Km 17th 22985.63 13791.38 5746.41 3447.84 1477.63
18 Km 18th 14025.88 8415.53 3506.47 2103.88 4592.56

Total 279728.03 167836.82 69932.01 41959.20 66675.44

Asstt. Executive Engineer Executive Engineer


PMGSY Sub- division -II PMGSY Division
Akhnoor Jammu
18.00 KM

UNIT
S

Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
BHARAT NIRMAN
TYPICAL DETAILED ESTIMATE FOR CONSTRUCTION OF ROAD BY OF EARTHWORK IN CUTTING

NAME OF THE ROAD:- JOGWAN TO NEELI-NALLAH


BLOCK :- KHOUR PACKAGE No. :-
DISTRICT :- JAMMU Length of Road :- 18.00 KM
Amount (Rs.
S.No Particulars Quantity Unit Rate / Unit
In Lacs)
Excavation for road way in soil in hilly area by
machanical means including cutting and trimming of
side slopes and disposal of excavater earth (to
1
embankment site) with lift upto 1.5mtr and lead upto
20 mtr as per technical specification clause 1603.1,
1603.2, 1606.1 and 1606.2
Hard Soil 60% 115
a 167836.82 Cum 193.012
Qty. as per abstract of earth work table attached
Ordinary Rock not required blasting by mechanical
201
b means (Soft Rock 20%) 69932.01 Cum 140.563
Qty. as per abstract of earth work table attached
Hard Rock 20% 343
c 41959.20 Cum 143.920
Qty. as per abstract of earth work table attached

Total 477.50

Asstt. Executive Engineer Executive Engineer


PMGSY Sub- division -II PMGSY Division
Akhnoor Jammu
BHARAT NIRMAN
TYPICAL DETAILED ESTIMATE FOR CONSTRUCTION OF ROAD BY OF EARTHWORK
IN FILLING
NAME OF THE ROAD:- JOGWAN TO NEELI-NALLAH
BLOCK :- KHOUR PACKAGE No. :-
DISTRICT :- JAMMU Length of Road :- 18.00 KM
Rate / Amount
S.No Particulars Quantity Unit
Unit (Rs. In Lacs)
Construction of embankment with material obtained from
road way cutting (approved material ) excavation from drain
and foundation of other structure from drain and foundation
1
of other structure graded and compacted to meet
requirement of table 300.1, and 300.2 as per Technical
Specification clause 301.5
a Qty. as per abstract of earth work tableattached 66675.44 Cum 58 38.672

Total 38.67

Asstt. Executive Engineer Executive Engineer


PMGSY Sub- division -II PMGSY Division
Akhnoor Jammu
BHARAT NIRMAN
LOCATION CHART
NAME OF THE ROAD:- JOGWAN TO NEELI-NALLAH
BLOCK
:- KHOUR PACKAGE No. :-
DISTRICT
BHALWAL
JAMMU Length of Road :- 18.00 KM
:- JAMMU
R.C.C Culverts 90m long Np3 hume Pipe
Distance
S.No R.D flush Culvert
(in Km)
causeway 1000mm dia.
1.5 mtr 3.0 mtr 6.0 mtr
0 1 0 0 0 0
255 0 0 0 0 1
1 1st 675 0 0 0 0 1
805 0 0 0 0 1
875-900 0 0 1 0 0
75-100 0 0 0 0 1
275-300 1 0 0 0 0
2 2nd 400-425 0 1 0 0 0
585-600 0 1 0 0 0
925-950 0 0 0 0 1
150-175 1 0 0 0 0
325-335 0 0 0 0 1
3 3rd
850-875 0 0 1 0 0
925-950 0 0 0 0 1
200-250 0 0 0 0 1
425-450 0 0 0 0 1
4 4th
550-575 0 0 0 0 1
825-915 0 0 0 1 0
100 0 0 0 0 1
275-300 1 0 0 0 0
5 5th
375-400 0 0 0 0 1
625-650 0 1 0 0 0
0-25 0 0 0 0 1
175 0 0 0 0 1
250-275 1 0 0 0 0
6 6th 500 0 0 0 0 1
700-725 0 0 1 0 0
800-825 0 0 0 0 1
850-875 0 1 0 0 0
925 0 0 0 0 1
25-50 0 0 0 0 1
100-125 0 0 0 0 1
200 0 0 0 0 1
7 7th
305 1 0 0 0 0
475 0 0 0 0 1
700 0 0 0 0 1
100-125 0 0 0 0 1
8 8th
400 0 0 0 0 1
8 8th
700 1 0 0 0 0
825 0 0 0 0 1
50-100 0 0 0 0 1
400-425 0 0 0 0 1
9 9th 550 0 0 0 0 1
700 0 0 0 0 1
850-875 0 0 0 0 1
175-200 1 0 0 0 0
500 0 0 0 0 1
10 10th 750-725 0 1 0 0 0
975-10/0 0 1 0 0 0
75-100 0 0 0 0 1
225-250 1 0 0 0 0
325 0 0 0 0 1
425-450 1 0 0 0 0
11 11th
525-550 0 0 0 0 1
600 0 0 0 0 1
725 0 1 0 0 0
925 0 0 0 0 1
125-150 0 1 0 0 0
300 0 0 0 0 1
12 12th 475 1 0 0 0 0
725 1 0 0 0 0
985 0 0 1 0 0
300 0 0 0 0 1
600-625 1 0 0 0 0
13 13th 675 0 0 0 0 1
850 0 0 0 0 1
925-950 0 0 0 0 1
200-225 0 0 0 0 1
450-475 0 0 0 0 1
14 14th
575-600 0 1 0 0 0
850-875 0 0 0 0 1
450 0 0 0 0 1
675 0 0 0 0 1
15 15th 725 0 0 0 0 1
825 0 0 0 0 1
925-950 0 0 1 0 0
275 1 0 0 0 0
400 0 0 0 0 1
16 16th 575-600 0 0 0 0 1
650-675 1 0 0 0 0
900-925 0 0 0 0 1
135 0 0 0 0 1
425 0 0 0 0 1
17 17th
550 0 1 0 0 0
900-925 0 0 0 0 1
125-150 0 1 0 0 0
200 0 0 0 0 1
18 18th 525-550 0 0 0 0 1
850-825 0 1 0 0 0
18/0 0 0 0 0 1
Total 15 12 5 1 57

Asstt. Executive Engineer Executive Engineer


PMGSY Sub- division -II PMGSY Division
Akhnoor Jammu
BHARAT NIRMAN

CARRIAGE OF MATERIAL BY MECHNICAL TRANSPORT CHART

Name of the Road :- JOGWAN TO NEELI-NALLAH

BLOCK :-KHOUR PACKAGE No. :-

DISTRICT :- JAMMU Length of Road :- 18.00 KM

Total Haulage

Densit
Distance Un Total Grand Total
Loading Haulage as per

y
(in Km) loading (in R.s) (in R.s)
Distance
S.No Items
For BT @ R.s For Kacha @ R.s B =
A= For Gravel @ Rs.
B.T Gravel Kacha (a) (b) (c) 4.49/mt Km 10.86/mt Km (c [d + e (A+B)
(a+b) 5.40/mt Km (e)
(d) (f) +f])
0 x 4.49 = 0.0 x 5.40= 12.0 X 10.86= 282.54
1 Sand 0.00 0.00 12.00 50.00 11.00 61.00 1.70 221.54
0.00 0.00 130.32

Stone 30 x 4.49 = 6.0 x 5.40= 15 x 10.86 = 771.00


2 30.00 6.00 15.00 100.00 11.00 111.00 2.00 660.00
Aggregate 134.70 32.40 162.90
0 x 4.49 = 10.0 x 5-4= 15 x 10.86 = 501.42
3 Stone 0.00 10.00 15.00 100.00 11.00 111.00 1.80 390.42
0.00 54.00 162.90
92 x 4.49 = 6.0 x 5.4= 9.0 x 10.86 = 797.22
4 Cement 92.00 6.00 9.00 127.00 127.00 254.00 1.00 543.22
413.08 32.40 97.74
92 x 4.49 = 6.0 x 5.4= 9.0 x 10.86 = 819.22
5 Steel 92.00 6.00 9.00 138.00 138.00 276.00 1.00 543.22
413.08 32.40 97.74
92 x 4.49 = 6.0 x 5.4= 9.0 x 10.86 = 1636.36
NHP3 1000
8 92.00 6.00 9.00 84.00 379.00 463.00 2.16 1173.36
mm dia pipe 413.08 32.40 97.74

Asstt. Executive Engineer Executive Engineer


PMGSY Sub- division -II PMGSY Division
Akhnoor Jammu
BHARAT NIRMAN

Cost Estimate for :Construction of 1000mm dia NP3 Hume pipe culvert
NAME OF THE ROAD:- JOGWAN TO NEELI-NALLAH
BLOCK :- KHOUR PACKAGE No. :- JK05-119
DISTRICT :- JAMMU Length of Road :- 18.00 KM
Rate (in Amount
S.No Description of Item Unit Quantity
Rs.) (in Rs.)
Earth work excavation in structures (70%Hard Soil, 20% Soft rock & 10% hard Rock )
1 CuM 52.15 363.20 18940.88
2 PCC M-10 grade using (40-10)mm agg. CuM 6.44 3740.00 24085.60
3 PCC M-15 grade in foundation CuM 17.36 3866.00 67113.76
4 Back filing of granular material behind abutment, wing wall, R/wall CuM 8.8 659 5799.20
5 Filling stones into crates inc. cost of GI Wire crates MT 8.64 1719 14852.16
6 P/L of NP3 1000mm dia pipe inc collar etc Mtrs. 7.5 5437 40777.50
7 40mm flooring in M15 grade Cum 0.26 4089 1063.14

Total 172632.24
8 Carriages
Sand CuM 10.827 282.54 3059.10
Stone Aggregate CuM 21.654 771.00 16695.23
Cement MT 7.055 797.22 5624.55
Stone CuM 17.440 501.42 8744.76
NHP3 1000 mm dia pipe Mtrs. 7.500 1636.36 12272.66
Total 46396.31
Grand Total 219028.55

Say Rs. 2.19 Lacs Per Each

Asstt. Executive Engineer Executive Engineer


PMGSY Sub- division -II PMGSY Division
Akhnoor Jammu
BHARAT NIRMAN
Cost Estimate for the construction of RCC Culvert of 1.50M Span for 6.0m carriage way

NAME OF THE ROAD:- JOGWAN TO NEELI-NALLAH


BLOCK :- KHOUR PACKAGE No. :- JK05-119
DISTRICT :- JAMMU Length of Road :- 18.00 KM
Rate
Amount
S.No Description of Item Unit Quantity
(in Rs.)
1 Earth work excavation in structures ( 70% hard soil, 20% soft rock & 10% Hard Rock CuM 80.00 (in Rs.)
363.20 29056.00
2 PCC M-10 grade using 40-10 MM aggregates CuM 7.50 3740.00 28050.00
3 PCC M-15 grade using 40mm– 20mm & 10mm aggregate in foundation CuM 33.03 3866.00 127693.98
4 PCC M-15 grade using 40mm– 20mm & 10mm aggregate in sub structure CuM 54.00 4089.00 220806.00
5 RCC M-25 grade using 20mm-10mm aggregates (Slab) CuM 3.27 5815.00 19015.05
6 H.Y.S.D. Steel (TMT) MT 0.32 74715.00 23908.80
7 Back filling with granular material behind abutments, wing wall, R/wall CuM 9.25 659.00 6095.75
8 R.R. Masonary dry CuM 7.25 1978.03 14340.72

Total 468966.30

9 Carriages
Sand CuM 44.01 282.54 12434.76
Stone Aggregate CuM 88.02 771.00 67863.42
Cement MT 31.07 797.22 24768.99
Stone CuM 16.50 501.42 8273.43
Steel MT 0.32 819.22 262.15

Total 113602.75
Grand Total 582569.05

Say Rs. 5.83 Lacs Per Each

Asstt. Executive Engineer Executive Engineer


PMGSY Sub- division -II PMGSY Division
Akhnoor Jammu
BHARAT NIRMAN
Cost Estimate for the construction of RCC Culvert of 3.00M Span for 6.0m carriage way

NAME OF THE ROAD:- JOGWAN TO NEELI NALLAH


BLOCK :- KHOUR PACKAGE No. :- JK05-119
DISTRICT :- JAMMU Length of Road :- 18.00 KM

Rate Amount
S.No Description of Item Unit Quantity
(in Rs.) (in Rs.)
Earth work excavation in structures ( 70% hard soil, 20% soft rock & 10%
1 CuM 128.62 363.20 46714.78
Hard Rock
2 PCC M-10 grade using 40-10 MM aggregates CuM 12.94 3740.00 48395.60

3 PCC M-15 grade using 40mm– 20mm & 10mm aggregate in foundation CuM 39.00 3866.00 150774.00

4 PCC M-15 grade using 40mm– 20mm & 10mm aggregate in sub structure CuM 100.87 4089.00 412457.43

5 RCC M-25 grade using 20mm-10mm aggregates (Slab) CuM 7.20 5815.00 41868.00
6 H.Y.S.D. Steel (TMT) MT 0.72 74715.00 53794.80

7 Back filling with granular material behind abutments, wing wall, R/wall CuM 18.00 659.00 11862.00

8 R.R. Masonary dry CuM 17.80 1978.03 35208.93

Total 801075.55
9 Carriages
Sand CuM 76.59 282.54 21640.04
Stone Aggregate CuM 153.18 771.00 118101.78
Cement MT 44.58 797.22 35540.07
Stone CuM 17.90 501.42 8975.42
Steel MT 0.72 819.22 589.84
Total 184847.15

Grand Total 985922.70

Say Rs. 9.86 Lacs Per Each


Asstt. Executive Engineer Executive Engineer
PMGSY Sub- division -I PMGSY Division
Jammu Jammu
BHARAT NIRMAN
Cost Estimate for :Construction of RCC culvert of 6.00m span for 6.0m carriage way
NAME OF THE ROAD:- JOGWAN TO NEELI-NALLAH
BLOCK :- KHOUR PACKAGE No. :- JK05-119
DISTRICT :- JAMMU Length of Road :- 18.00 KM

S.No Description of Item Unit Quantity Rate Amount in Rs.


Earth work excavation in structures (70% hard
1 cum 251.58 363.20 91373.86
soil , 20% soft rock & 10% hard rock)

2 PCC M-10 grade using (40-10)mm agg. cum 23.21 3740.00 86805.40
PCC M-15 grade using (40-10)mm agg.& 10mm
3 cum 200.03 3866.00 773315.98
aggregates in foundation
PCC M-15 grade using (40-10)mm agg.& 10mm
4 cum 100.6 4089.00 411353.40
aggregates in sub structure.
RCC M-25 grade using 20mm-10mm aggregate
5 cum 20.5 5815.00 119207.50
(slab)
6 Steel (TMT) MT 2.05 74715.00 153165.75
Back filing granular material behind abutment,
7 cum 64.5 659.00 42505.50
wing wall, R/wall
8 R.R. masonary dry cum 38.6 1978.03 76351.96

Total 1754079.34
9 Carriages
Sand cum 167.56 282.54 47343.07
Stone Aggregate cum 335.13 771.00 258385.23
Cement MT 98.343 797.22 78401.01
Stone cum 51.55 501.42 25848.20
Steel MT 2.05 819.22 1679.40
Total 411656.91

GRAND TOTAL 2165736.2551

SAY Rs. 21.66 PER EACH

Asstt. Executive Engineer Executive Engineer


PMGSY Sub- division -II PMGSY Division
Akhnoor Jammu
Cost Estimate for the construction of Flush Causeway 21.0 m Span for 6.0 m .
NAME OF ROAD :- JOGWAN TO NEELI NALLAH

BLOCK :- KHOUR PACKAGE No. :- JKO5-119


DISTRICT :- JAMMU LENGTH OF ROAD :- 18.00 Kms.
S.No. Description of Item Unit Quantity Rate in Rs. Amount in Rs.
Earth work excavation in
1 structures ( 70% hard soil, 20% CuM 288.53 363.20 104794.096
soft rock & 10% Hard Rock
PCC M-10 grade using 40-10 MM
2 CuM 35.58 3740.00 133069.2
aggregates
PCC M-15 grade using (40-10)mm
3 CuM 182.79 4089.00 747428.31
agg.& 10mm aggregates
RCC M-25 grade using 20mm-
4 CuM 49.43 5440.00 268899.2
10mm aggregates (Slab)

5 H.Y.S.D. Steel (TMT) MT 1.25 73526 91907.5


8 Carriages TOTAL 1346098.31
a Sand cum 120.51 282.54 34049.37744
b Stone Aggregate cum 241.02 771.00 185826.42
c Cement MT 90.0468 797.22 71787.109896
d Steel MT 1.25 819.22 1024.025
292686.93
1638785.24
GRAND TOTAL IN LACS = 16.39
Cost per running mt. =Rs. 78037.39 Lacs.

Asstt. Executive Engineer Executive Engineer


PMGSY Sub.Divn.-II, Akhnoor PMGSY Division
Jammu Jammu
BHARAT NIRMAN

Cost Estimate for The Construction of Retaining Wall (3mtr. ht.) for 9.90mtr Length
NAME OF THE ROAD:- JOGWAN TO NEELI-NALLAH
BLOCK :- KHOUR PACKAGE No. :- JK05-119
DISTRICT :- JAMMU Length of Road :- 18.00 KM
Amount
Rate
S.No Description of Item Unit Quantity
(in Rs.)
(in Rs.)
Earth work excavation in structures (70%Hard Soil, 20% Soft rock & 10% hard Rock )
1 CuM 14.67 363.2 5328.14
2 PCC M-10 grade using (40-10)mm agg. CuM 1.45 3740.00 5423.00
3 PCC M-20 coping using (20mm-10mm)agg. Cum 0.30 4672.00 1401.60
4 R.R. masonary in 1:5 mix CuM 18.27 2984.53 54527.36
5 R.R. masonary dry. CuM 13.34 1978.03 26386.92
6 Back filing stones behind abutment, wing wall, R/wall CuM 11.25 659.00 7413.75
Total 100480.78

7 Carriages

Sand CuM 7.18 282.54 2028.67


Stone Aggregate CuM 1.59 771.00 1225.89
Cement MT 2.14 797.22 1706.05
Stone CuM 42.86 501.42 21490.86
Total 26451.47

Grand Total 126932.25

Say Rs. 12821 .00 Per R mtr.

Asstt. Executive Engineer Executive Engineer


PMGSY Sub- division -II PMGSY Division
Akhnoor Jammu
BHARAT NIRMAN

Cost Estimate for The Construction of Retaining Wall (4mtr. ht.) for 9.90mtr Length
NAME OF THE ROAD:- JOGWAN TO NEELI-NALLAH
BLOCK :- KHOUR PACKAGE No. :-JK05-119
DISTRICT :- JAMMU Length of Road :- 18.00 KM
Rate

S.No Description of Item Unit Quantity

Earth work excavation in structures (70%Hard Soil, 20% Soft rock & 10% hard Rock ) (in Rs.)
1 CuM 17.80 363.2

2 PCC M-10 grade using (40-10)mm agg. CuM 3.60 3740.00


3 PCC M-20 coping using (20mm-10mm)agg. Cum 0.30 4672.00
4 R.R. masonary in 1:6 mix CuM 29.16 2984.53
5 R.R. masonary dry. CuM 17.20 1978.03
6 Back filing stones behind abutment, wing wall, R/wall CuM 9.37 659.00

Total

7 Carriages
Sand CuM 12.900 282.54
Stone Aggregate CuM 3.460 771.00
Cement MT 3.670 797.22
Stone CuM 55.730 501.42

Total

Grand Total

Say Rs. 18761 .00 Per R mtr.

Asstt. Executive Engineer Executive Engineer


PMGSY Sub- division -II PMGSY Division
Akhnoor Jammu
0mtr Length

:-JK05-119
:- 18.00 KM
Amount

(in Rs.)
6464.96

13464.00
1401.60
87028.89
34022.12
6174.83

148556.40

3644.82
2667.66
2925.80
27944.14

37182.41

185738.81

Per R mtr.

Executive Engineer
PMGSY Division
Jammu
BHARAT NIRMAN

Cost Estimate for The Construction of Retaining Wall (5mtr. ht.) for 10mtr Length
NAME OF THE ROAD:- JOGWAN TO NEELI NALLAH
BLOCK :- KHOUR PACKAGE No. :- JK05-119
DISTRICT :- JAMMU Length of Road :- 18.00KM
Rate Amount
S.No Description of Item Unit Quantity
(in
Rs.) (in Rs.)
Earth work excavation in structures (70%Hard Soil, 20% Soft rock & 10% hard Rock )
1 CuM 49.55 363.2 17996.56
2 PCC M-10 grade using (40-10)mm agg. CuM 5.14 3740.00 19223.60
3 PCC M-20 coping using (20mm-10mm)agg. Cum 0.30 4672.00 1401.60
4 R.R. masonary in 1:6 mix CuM 40.60 2984.53 121171.92
5 R.R. masonary dry. CuM 36.00 1978.03 71209.08
6 Back filing stones behind abutment, wing wall, R/wall CuM 24.42 659.00 16092.78

Total 247095.54

7 Carriages
Sand CuM 15.846 282.54 4477.19
Stone Aggregate CuM 4.896 771.00 3774.82
Cement MT 4.600 797.22 3667.45
Stone CuM 101.020 501.42 50653.45

Total 62572.91

Grand Total 309668.45

Say Rs. 30967 .00 Per R mtr.

Asstt. Executive Engineer Executive Engineer


PMGSY Sub- division -II PMGSY Division
Akhnoor Jammu
BHARAT NIRMAN

Cost Estimate for The Construction of Parapets


NAME OF ROAD:- JOGWAN TO NEELI NALLAH
BLOCK :- KHOUR PACKAGE No. :- JKO5-119
DISTRICT :- JAMMU Length Width Length of Road :- 18.000 KM
Rate
Height /
Amount
S.No. Description of Item Thickness Unit Qty.
(in Rs.)
(M) (M)
(in Rs.)

1 PCC M-15 grade using (40-10)mm agg. (M)


1.50 (0.30+0.45)/2 0.60 CuM 0.34 4089.00 1390.26

Total 1390.26
3 Carriages

Sand CuM 0.192 282.54 54.25

Stone Aggregate CuM 2.33 771.00 1794.89

Cement MT 0.089 797.22 70.95


Total 1920.09
Grand Total 3310.35
Say Rs. 3310 .00 Each No.

Asstt. Executive Engineer Executive Engineer


PMGSY Sub- division -II PMGSY Division
Akhnoor Jammu
BHARAT NIRMAN

Cost Estimate for The Construction of Breast Wall for 9.45mtr length

NAME OF THE ROAD:- JOGWAN TO NEELI-NALLAH


BLOCK :- KHOUR PACKAGE No. :- JK05-119
DISTRICT :- JAMMU Rate
Length of Road :- 18.00 KM
Amount
S.No Description of Item Unit Quantity
(in Rs.)
1 Earth work excavation in structures . CuM 13.26 363.2 4816.03
(in Rs.)
2 PCC M-10 grade using (40-10)mm agg. CuM 1.69 3740.00 6320.60
3 PCC M-20 coping using (20mm-10mm)agg. Cum 0.525 4672.00 2452.80
4 PCC M-15 (Drain edge). CuM 1.35 4089.00 5520.15
5 R.R. masonary in 1:6 mix CuM 7.74 2984.53 23100.26
6 R.R. masonary dry. CuM 5.13 1978.03 10147.29

Total 52357.14

7 Carriages
Sand CuM 4.35 282.54 1229.07
Stone Aggregate CuM 3.14 771.00 2420.94
Cement MT 1.67 797.22 1331.36
Stone CuM 12.87 501.42 6453.28

Total 11434.64

Grand Total 63791.78

Say Rs. 6750 .00 Per R mtr.

Asstt. Executive Engineer Executive Engineer


PMGSY Sub- division -II PMGSY Division
Akhnoor Jammu
A B C D E F

1 BHARAT NIRMAN

2 Cost Estimate for The Construction of Edge Wall 10 mtr. Length

3 NAME OF ROAD:- JOGWAN TO NEELI-NALLAH


4 BLOCK :- KHOUR PACKAGE No. :- JKO5-119
5 DISTRICT :- JAMMU Length of Road :- 18.00 KM
6 Amount
Rate
7 S.No. Description of Item Unit Quantity
(in
(in Rs.)
Earth work excavation in structures ( 70 % Hard Soil, 20 % Soft rock & 10 Rs.)
8 1 CuM 2.12 363.2 769.98
% hard Rock )
9 2 PCC M-10 grade using (40-10)mm agg. CuM 0.30 3740.00 1122.00
10 3 PCC M-20 grade coping 50mm agg. CuM 0.30 4672.00 1401.60
11 4 Back filing of granular material behind abutment, wing wall, R/wall CuM 2.45 659.00 1614.55
12 5 R.R. masonary in 1:6 mix CuM 7.25 2984.53 21637.84
13 Total 26545.98
14 6 Carriages
15 Sand CuM 2.663 282.54 752.27
16 Stone Aggregate CuM 0.540 771.00 416.34
17 Cement MT 0.760 797.22 605.99
18 Stone CuM 9.700 501.42 4863.77
19 Total 6638.37

20 Grand Total 33184.35

21 Say Rs. 3318 .00 Per R mtr.


22
23
24
25
26
27 Asstt. Executive Engineer Executive Engineer
28 PMGSY Sub- division -II PMGSY Division
A B C D E F
29 Akhnoor Jammu
G

5
6

9
10
11
12

13

14
15
16
17
18

19

20

21

22
23
24
25
26
27
28
A B C D E F

1 BHARAT NIRMAN

2 Cost Estimate for The Construction of Crated Wall for 6.00mtr length

3 NAME OF THE ROAD:- JOGWAN TO NEELI-NALLAH


4 BLOCK :- KHOUR JK05-119
5 DISTRICT :- JAMMU Length of Road :- 18.00 KM
Rate
Amount
6 S.No. Description of Item Unit Quantity
(in Rs.)
(in Rs.)
7 1 Earth work excavation in structures CuM 5.76 363.2 2092.032

8 2 Filling of stones into GI wire crates. CuM 8.64 1719 14852.16

9 Total 16944.192

10 3 Carriages

11 Stone CuM 8.64 501.42 4332.27

12 Total 4332.27

13 Grand Total 21276.46

14 Say Rs. 21276 .00 Per Crate


15
16
17
18
19
20
21
22
23
24 Asstt. Executive Engineer Executive Engineer
25 PMGSY Sub- division -II PMGSY Division
A B C D E F
26 Akhnoor Jammu
G

4
5

10

11

12

13

14

15
16
17
18
19
20
21
22
23
24
25
A B C D E F G H I J K L
1 DESIGN OF HORIZONTAL CURVES
2

3
Curve No. Chainage Rc(in mtr.) Ls ( mtr.) Design Speed S.E. (%) Angle of Deflection Lc Total Length
4 (km. hour.) Deg. Min. Sec.
5
6 C1 0/275-325 24 16.67 20 7.4 70 12.7 46.0
7 C2 0/800-850 16 25.00 20 11.1 85 -1.3 48.7
8 C3 1/225-270 28 14.29 20 6.3 55 12.6 41.2
9 C4 1/625-675 18.5 21.62 20 9.6 110 13.9 57.1
10 C5 1/675-720 18.5 21.62 20 9.6 70 1.0 44.2
11 C6 1/810-840 18.5 21.62 20 9.6 100 10.7 53.9
12 C7 2/175-225 27 14.81 20 6.6 113 38.4 68.1
13 C8 2/225-275 36 11.11 20 4.9 58 25.3 47.6
14 C9 2/350-400 23 17.39 20 7.7 85 16.7 51.5
15 C10 2/650-680 30 13.33 20 5.9 60 18.1 44.8
16 C11 3/75-150 19 21.05 20 9.4 123 19.7 61.8
17 C12 3/600-650 32 12.50 20 5.6 54 17.7 42.7
18 C13 3/625-675 31.5 12.70 20 5.6 81 31.8 57.2
19 C14 3/910-940 29.5 13.56 20 6.0 69 22.0 49.1
20 C15 4/60-100 23 17.39 20 7.7 70 10.7 45.5
21 C16 4/540-590 40 10.00 20 4.4 82 47.3 67.3
22 C17 4/800-850 18.5 21.62 20 9.6 120 17.1 60.4
23 C18 4/920-950 18.5 21.62 20 9.6 110 13.9 57.1
24 C19 5/30-5/55 21 19.05 20 8.5 58 2.2 40.3
25 C20 5/225-275 40 10.00 20 4.4 72 40.3 60.3
26 C21 5/480-525 21 19.05 20 8.5 75 8.4 46.5
27 C22 5/590-625 34.5 11.59 20 5.2 72 31.8 55.0
28 C23 5/725-775 27 14.81 20 6.6 86 25.7 55.4
29 C24 5/975-6/20 21.5 18.60 20 8.3 124 27.9 65.1
30 C25 6/275-375 24 16.67 20 7.4 101 25.6 59.0
31 C26 6/380-425 29 13.79 20 6.1 76 24.7 52.3
32 C27 6/560-600 19 21.0526 20 9.4 100 12.1 54.2
33 C28 6/850-900 19.5 20.5128 20 9.1 110 16.9 58.0
34 C29 7/25/1975 18.5 21.6216 20 9.6 98 10.0 53.3
35 C30 7/260-290 18.5 21.6216 20 9.6 75 2.6 45.8
36 C31 7/290-350 43 9.30233 20 4.1 70 43.2 61.9
37 C32 8/375-425 19 21.0526 20 9.4 70 2.2 44.3
38 C33 8/575-625 25 16 20 7.1 90 23.3 55.3
39 C34 8/725-775 40 10 20 4.4 82 47.3 67.3
40 C35 9/100-150 40 10 20 4.4 77 43.8 63.8
41 C36 9/225-325 21 19.0476 20 8.5 111 21.6 59.7
42 C37 9/725-760 32 12.5 20 5.6 76 30.0 55.0
43 C38 9/900-950 22 18.1818 20 8.1 106 22.5 58.9
44 C39 10/210-250 26.5 15.0943 20 6.7 81 22.4 52.6
45 C40 10/260-310 26 15.3846 20 6.8 79 20.5 51.2
46 C41 10/310-350 20 20 20 8.9 78 7.2 47.2
47 C42 10/515-575 28.5 14.0351 20 6.2 90 30.7 58.8
48 C43 10/625-700 23 17.3913 20 7.7 110 26.8 61.6
49 C44 10/800-850 18.5 21.6216 20 9.6 110 13.9 57.1
50 C45 10/875-925 18.5 21.6216 20 9.6 110 13.9 57.1
51 C46 11/330-400 25 16 20 7.1 89 22.8 54.8
52 C47 11/450-500 34 11.7647 20 5.2 74 32.2 55.7
53 C48 11/500-550 33 12.1212 20 5.4 70 28.2 52.4
54 C49 12/480-525 16 25 20 11.1 103 3.8 53.8
55 C50 12/700-750 32 12.5 20 5.6 87 36.1 61.1
56 C51 13/15-13/85 18.5 21.6216 20 9.6 128 19.7 63.0
57 C52 13/100-13/175 17.5 22.8571 20 10.2 116 12.6 58.3
58 C53 13/875-13/92 17.5 22.8571 20 10.2 141 20.2 65.9
59 C54 14/125-14/17 17.5 22.8571 20 10.2 156 24.8 70.5
60 C55 14/375-14/42 17.5 22.8571 20 10.2 145 21.4 67.2
A B C D E F G H I J K L
61 C56 14/500-14/57 67.5 5.92593 20 2.6 50 53.0 64.9
62 C57 14/650-14/70 37.5 10.6667 20 4.7 55 25.3 46.7
63 C58 14/750-14/80 36 11.1111 20 4.9 50 20.3 42.5
64 C59 14/900-14/95 19.5 20.5128 20 9.1 135 25.4 66.5
65 C60 15/25-15/75 17.5 22.8571 20 10.2 149 22.7 68.4
66 C61 15/125-15/17 27 14.8148 20 6.6 80 22.9 52.5
67 C62 15/275-15/32 19 21.0526 20 9.4 109 15.1 57.2
68 C63 15/450-15/50 31 12.9032 20 5.7 120 52.0 77.8
69 C64 15/500-15/55 30.5 13.1148 20 5.8 81 30.0 56.2
70 C65 16/35-16/75 17.5 22.8571 20 10.2 153 23.9 69.6
71 C66 16/185-16/25 18 22.2222 20 9.9 162 28.7 73.1
72 C67 16/390-16/42 32 12.5 20 5.6 25 1.5 26.5
73 C68 16/485-16/52 34 11.7647 20 5.2 59 23.3 46.8
74 C69 16/600-16/70 30.5 13.1148 20 5.8 91 35.3 61.6
75 C70 16/700-16/75 39 10.2564 20 4.6 70 37.4 57.9
76 C71 17/320-17/37 41 9.7561 20 4.3 56 30.3 49.8
77 C72 17/450-17500 51.5 7.76699 20 3.5 30 19.2 34.7