1. FOR WHOLE COMPLEX THE HIGHEST POINT OF PAVED AREA (H.P.P.

)
REFERRED AS 100 000 CORRESPONDS TO ABSOLUTE ELEVATION +6m .
2. ALL COORDINATES ARE IN METERS
3. ALL PLANT DIMENSIONS AND ELEVATIONS ARE IN MILLIMETERS.
4. PLANT REFERENCE POINT (N=0.00 AND E=0.00) CORRESPONDS TO
GEOGRAPHIC COORDINATES: E=421588.904 N =1156851.990

NOTES:
A. HYDRAULIC VERIFICATION OF PIT BUOYANCY HAS BEEN CARRIED OUT IN
ORDER TO DEFINE THE THICKNESS OF THE WALLS ABLE TO INCREASE
PIT STABILITY AGAINST UPLIFT AND DAMAGING.
B. IN CASE OF PIPE WITH ECCENTRIC POSITION AND/OR NOT
PERPENDICULAR ORIENTATION, REFER TO "GRADING, UNDERGROUND
AND FOUNDATION PLAN"

SECONDARY
WIND (19%)

PRIMARY
WIND (28%)

Tank
Sedimentation

Sedimentation
Tank

AIR LOCK
Carla Ferrante Gabriele Pieri Valerio Colone
2020.02.06
2020.02.06 2020.02.06 18:25:00 +01'00'
12:14:11 13:57:09
+01'00' +01'00'
Dante Pastore
2020.02.06
19:00:13 +01'00'

PETROCHEMICAL COMPLEX IN SOUTH OF VIETNAM


TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
PACKAGE A1 - OLEFINS PLANT

E&C
Long Son Petrochemicals Co., Ltd

INSTALLATION DRAWINGS DETAILS


ZONE 2D - AREA 03 AND AREA 04

TPSK Consortium c/o Wisma Technip, 241, Jalan Tun Razak, 50400, Kuala Lumpur Malaysia