Hazop Worksheet
Hazard Identification Study Work
SCHEME NO. P&ID NO. A095/02/41/70/1161
NODE NO. 62 Piping and Instrumentation Diagram GSU/GPU OSBL HOOK-UP Details (24” Dia RLNG Pipeline)
S.N. Guide Deviation Process Causes Consequences Safeguards Recommendations
Word
1. Flow No flow 1. Isolation valve in 24” 1. Loss of production. ------ 1. Flow meter with Alarm
RLNG line closed. 2. Delay in transfer of system should be
2. No availability of RLNG in RLNG. provided.
the pipeline 2. Continuous monitoring
3. Pipeline may be broken in of flow should be checked
between. regularly at central control
room.