You are on page 1of 1

PUMPED LINE TO SECONDARY PUMPED

RESERVOIRS LINE TO RESERVOIRS 230 BRICK GRID INLET (600X600 INTERNAL)


(DUTY) (STANDBY) EMERGENCY OVERFLOW TO GRID AT
LOWER LEVEL CONNECTED TO
STORMWATER MAIN

FGL 1542.00
OVERFLOW
TO STORMWATER
NETWORK

FLOW
FLOW
FROM ARTIFICIAL PITCH BACKFILL
FROM NATURAL PITCH 1.35
IL 1540.80

WATER RECLAMATION SCHEMATIC CONCEPT FOR PHASE 1


9500 L TANK WITH
PLASTIC ACCESS
EXTENDERS
(REV A, 26 NOV 2018)
3.75
2.20
STANDBY PUMP START

DUTY PUMP START

STANDBY PUMP STOP


DUTY PUMP STOP

0.20 FGL 1538.25


CONCRETE BASE WITH
MESH REINFORCEMENT

TANK SECTION (NTS)

DRAINAGE FROM
NATURAL PITCH

FGL 1542.00 FGL 1542.00


BELOW GROUND
TANK + PUMPS

DRAINAGE FROM P IPE


R
ARTIFICIAL PITCH D PE ATE
H W
5 mm ORM
31 ST
TO IN
MA

PRI PED LI
PUM
LINE
PUM NDARY

MAR
PED

Y
SECO

NE
10.5000 OVERFLOW TO
GRID ILET

MUNICPAL/BOREHOLE
SUPPLY
STORAGE
STORAGE RESERVOIR
RESERVOIR
IRRIGATION
SUPPLY

FGL 1542.00 FGL 1542.00

18.5000

PLAN (NTS)

You might also like