18500

DELIVERY LINE FROM PUMP TO FIELD


CM32-200B VANSAN 5.5KW FLANGED PUMP TO FEED THE IRRIGATION SYSTEM

65 000 LITRE STEEL DAM / RESERVOIR

OVERFLOW FROM TANK TO ........


10500

6000

2 x 160mm dia STORMWATER / DRAINAGE


FEED FROM BOREHOLE / MUNICIPAL SUPPLY FEED FROM NATURAL GRASS AND ARTIFICIAL TURF FIELD

PREPARATION OF PLATFORM AS SPECIFIED BY THE TANK SUPPLIER.

1) Surface must be level and compacted. The surface must be smooth and clear of any debris
that can damage the liner. An allowance of 1m3 of River Sand must be allowed for when
installation is done. This is to cover the surface and edges of the reservoir.

2) The reservoir must be filled to a 25% capacity immediately after erection as the wind will move SAFA Technical Centre
the lining or the reservoir in extreme conditions.

Included in the complete reservoir: PVC liner, 50mm outlet with valve, 40mm overflow, Aluzinc
sheets and hardware. Competition Pitch
Optional extras: Steel domed roof, galvanised ladder, level gauge, additional outlets / inlets (40-150mm)
Scour valves (40-500mm), overflows (40-150mm), stainless steel fittings, food grain PVC liner or PVC grain liner.

Water Reclamation Pond

Date: 14 November 2018

Designer: Ryan Wilson

Drawing #: SAFA CP 003


2 x 160mm dia STORMWATER / DRAINAGE
OVERFLOW FROM TANK TO ........ DELIVERY LINE FROM FEED FROM NATURAL GRASS AND ARTIFICIAL TURF FIELDS
PUMP TO FIELD TO
FEED FROM BOREHOLE / MUNICIPAL SUPPLY FEED THE IRRIGATION
SYSTEM
1540.663

2400
600

1537.863
18500

SIDE VIEW
1540.663

1537.863 SAFA Technical Centre

Competition Pitch

Water Reclamation Pond

Total area: 1501.50m2


Total cut volume: 3381.45m3
Date: 14 November 2018

Designer: Ryan Wilson

Drawing #: SAFA CP 003