Name of Work:-Estimate For Construction of TTC 2 Gate at Sadar Upazilla, Dist: - Jhalakati
Name of Work:-Estimate For Construction of TTC 2 Gate at Sadar Upazilla, Dist: - Jhalakati
[2] Brick flat soling etc. all complete as per direction of the E/ch.
24`-0``4`-0`` = 32.00 sft
= 2.97sqm@420.00 1247.40
[3] Sand filing etc. all complete as per direction of Engineer in charge.
24`-0``4`-0``1`-0`` = 32.00 cft
= 2.97cum@636.00 1888.92
[5] RCC Base etc. all complete as per direction of Engineer in charge.
24`-0``4`-0``10`` = 26.56 cft
= 0.75 cum @12554 .00 9415.50
[7] RCC Column etc. all complete as per direction of Engineer in charge.
216`-0``4`-0`` = 128.0032.00 cft
= 1189 @429 .00 11130.30
[9] TIC Beam etc. all complete as per direction of Engineer in charge.
117`-0``1`-6``6`` = 1275 cft
= 0.36cum @12240 .00 4406.40
[11] Plaster 1:4 etc. all complete as per direction of Engineer in charge.
214`-0``4`-0`` = 112.00 sq
117`-0``4`-0`` = 52.00 sq
= 164.00
= 15.24m @225 .00 3429.00
[12] Weather coat etc. all complete as per direction of Engineer in charge.
214`-0``4`-0`` = 112.00 sq
117`-0``4`-0`` = 52.00 sq/15.24m
= 164.00
= 15.24m @238 .00 3627.00
Total = 584334.98
Name of work:- Estimate for Construction of TTC Ground floor Fountain
at Sadar upazilla, Dist:- Jhalakati.
[1] Brick flat soling etc. all complete as per direction of the E/ch.
32`-6``24`-6`` = 1056.25 sft
= 98.16@420.00 41227.20
Total = 142509.97