Professional Documents
Culture Documents
Que Cards For Btech Struc
Que Cards For Btech Struc
Answer: 300mm, 150mm Answer: 150mm, 300mm, 300mm Answer: 4.0m, 1.5m
124. For multi- family dwellings or 125. For multi- family dwellings or 126. For multi- family dwellings or
condominiums, the min. distance bet. 2 condominiums, the min. distance bet. 2 condominiums, the min. setback with
bldgs wherein the taller bldg has 3 or 4 bldgs with more than 4 storeys shall be 1&2 storeys high (for all types of lot)
storeys, shall be ___m. And the min. __m. The min. horizontal clearance shall be __m. and has incremental value
horizontal clearance bet. 2 roof eaves shall be __m. of ___mm for every storey high.
shall be ___m.
FALAR 1 (Pre- Construction Phase) FALAR 2 (Construction Phase) FALAR 3 (Post Construction)
150. Any quialified person, recognized 151. Any condition or act which 152. Any act that would remove or
by BFP, engaged in, but not limited to, increases or may cause an increase in neutralize fire hazard.
the design, construction, installation, the probability of the occurrence of
repair and maintenance, assessment, fire, or which may obstruct, delay,
and rehab of fire safety construction, hinder or interfere with fire fighting
suppression and control systems. operation and the safeguarding of
lifeand property.
Answer: Fire Trap Answer: Fire Lane Answer: Smoke Developed Rating
156. As per PD 9514, 1 hour fire 157. As per PD 9514, how many hour 158. As per PD 9514, how many exits
resistance rating shall be for __ stories fire resistance rating shall be done for 4 shall have from any balcony,
storeys and above? mezzanine, storey, or portion thereof?
Answer: 915mm