You are on page 1of 76

Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,

Latur-413512,Maharashtra.
Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in
TOP VIEW

TOP VIEW

3D ANIMATION OF THE PROPOSED MODEL


Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,
OFFICERS CLUB (PRESIDENT; HON. COLLECTOR,LATUR DISTRICT) Latur-413512,Maharashtra.
Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in
BIRD VIEW

3D ANIMATION OF THE PROPOSED MODEL


Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,
OFFICERS CLUB (PRESIDENT; HON. COLLECTOR,LATUR DISTRICT) Latur-413512,Maharashtra.
Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in
FRONT VIEW

3D ANIMATION OF THE PROPOSED MODEL


Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,
OFFICERS CLUB (PRESIDENT; HON. COLLECTOR,LATUR DISTRICT) Latur-413512,Maharashtra.
Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in
BACKSIDE VIEW

3D ANIMATION OF THE PROPOSED MODEL


Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,
OFFICERS CLUB (PRESIDENT; HON. COLLECTOR,LATUR DISTRICT) Latur-413512,Maharashtra.
Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in
BUILDING TYPE-
SHEET NO:
MAIN BUILDING

70.23M KEY PLAN

TITLE: WORKING DRAWING

SPECIFICATIONS:

CRICKET NET PRACTICE PITCHES


RETURN CREASE

STUMPS

BOWLING CREASE

POPPING CREASE

EMERGENCY GATE 1

LVL +1.50M

PROVISION FOR OPEN COURT


70.23M

CRICKET NET PRACTICE PITCHES

60.44M

BACKCOURT

SERVICE LINE

BASELINE
PROVISION FOR OPEN COURT

TENNIS COURT FOR DOUBLES

60.44M
TENNIS COURT FOR DOUBLES

LVL +1.50M

SWIMMING POOL
TENNIS COURT FOR DOUBLES

SWIMMING POOL
55.12M

126.57M
JOGGING TRACK

BABY POOL

25.00
GYMNASIUM FOR 50 PEOPLES

9m
K
ING TRAC

w
HALL

JOGGING TRACK
65 SQ.MT

i
JOGG

d
66.31M
d
water body water body

e
a

r
o

o
r
PARTY LAWN

a
BACKCOURT

e
SERVICE LINE

11.00
BASELINE

d
d i
LVL +1.50M

w
9m
JOGGING TRACK JOGGING TRACK

FOUNTAIN

VISITORS PARKING VISITORS PARKING

TENNIS COURT FOR DOUBLES

23.00

15.23

55.12M
SITE PLAN

126.57M
LVL +1.50M

DECK 3.00M

SCALE-1:1500
5
4
3

JOGGING TRACK

URINAL
2
1 UP
12.00

URINAL
CHANGING ROOM TOILET CHANGING ROOM TOILET
LVL +0.60M

URINAL
LOCKERS

LOCKERS
GAMES EQUIPMENT

5.00
STORE ROOM WITH

URINAL
CHANGING ROOM TOILET CHANGING ROOM TOILET

LOCKERS
LVL +0.60M LVL +0.60M LVL +0.60M
BABY POOL
LADIES TOILET GENTS TOILET
TOILET

LVL +0.60M

10.91M PLINTH PROTECTION 15.40M LVL +0.60M


PLINTH PROTECTION

C78 C79 C80 C81


17.37M
30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 NOTE : LVL +0.60M
C78,79,80,81 IS TAKEN SQUARE UPTO 1M
FROM PLINTH AND AFTER 1M IT IS TAKEN AS
ROUND COL. PLEASE REFER ELEVATION FOR
8.00M 3.19M THIS
1.09M

W4 W3 D2

JANITOR ROOM
3.30M

AQUARIUM AT 0.90M LVL


GENTS CHANGING ROOM
1.50M 14
D4
13 15
11

12 16
STORE D6 D6 D6 D6 D6
.3

LVL +1.20M
LVL +1.20M
WAITING LOUNGE
3M
5.49M

5.72M

11 17 PASSAGE
3M

5.60M X 5.17M D4
.3

10 18 D5
11

SLEEVE TO HIDE SLEEVE TO HIDE SLEEVE TO HIDE SLEEVE TO HIDE


3.00M

2.40M 9 19
RAIN WATER PIPE RAIN WATER PIPE RAIN WATER PIPE RAIN WATER PIPE
8 20 C66 C59A
7 21 LVL +1.05M
V1
COUNTER 6 22 FIXED TOUGHNED GLASS UPVC SLIDING TOUGHNED GLASS UPVC SLIDING TOUGHNED GLASS UPVC SLIDING TOUGHNED GLASS LVL +1.20M

RECEPTION
M.S. LOUVERS FIXED TOUGHNED GLASS
2.3M X 2M 5 23 LVL +1.20M
SHOWER AREA
1.09M

4 24
2.91M
M

D6 D6 D6 D6 D6
D5 D5
48

4.

3
48
4.

3.17M 25 DUCT D4 0.23x0.53


M

2.43M W.C. W.C.


2 26
1
UP 27 0.23x0.60
1.18M

V DUCT
V
LVL +1.20M LVL +1.20M
D4
8.23M 4.28M 4.24M V
1.22M

1.22M

4.45M

LVL +0.45M LVL +0.00M TREAD = 300MM


5.30M LVL +0.45M
ENTRANCE PORCH UP RISER = 177.8MM
LOBBY LADIES CHANGING ROOM V V
0.98M

0.98M

4.24M 1
4.24M
GYMNASIUM FOR 50 PEOPLES 0.30x0.68
2
3
26
25 0.30x0.68
D1 D6 D6 D6
W.C. W.C.
NON VEG KITCHEN 0.45M 0.60M 0.60M 0.30M D3
4 24
LVL +1.05M

5.3M X 2M 5 23 D1 D5 D5

soft sand filling UPVC SLIDING TOUGHNED GLASS 6 22


M

0.23x0.53
48
4.

7 21 D4 D2 D2
48
3.00M

4.
M

RESTAURANT 0.23x0.53
3.28M

20
4.95M

8 SHOWER AREA
D2 PASSAGE
VEG KITCHEN 9 19

VEG KITCHEN BILLARD ROOM 10 18 D3


PRESIDENT CABIN D6 D6 D6 D6 D6
D5
C3 6.15M X 6M 11 17
16 4.26 M X 6 M JANITOR ROOM
12
13 15

OFFICERS CLUB
0.51M

LVL +1.20M LVL +1.20M LVL +1.20M


5.72M

5.72M

8.00M 14

3
2
LVL +1.20M
LVL +3.15M ADMIN. OFFICE BACK OFFICE TOILET
1
LVL +3.15M
6.4 M X 6 M 5MX6M PEDICURE
AND MANICURE
PASSAGE
D4

(PRESIDENT; HON.

9m
3.47 M x 3.85 M 6.15M x 3.85M 1.98 M x 3.85M
CAPACITY OF 6 PASSENGER
SPA
LIFT
LD 1.40M X 1.80M
5.72M 5.72M
FIXED TOUGHNED GLASS FIXED TOUGHNED GLASS

COLLECTOR,LATUR DISTRICT)
CK

D4
D5 D4
D1
panel LVL +1.20M
D4
TOILET LVL +1.20M PASSAGE
2MX4M
A

CHILDREN'S PLAY AREA D4 D4


UPVC SLIDING TOUGHNED GLASS
LVL +1.20M RECEPTION zali work
LVL +1.20M
D4 D4

MEETING ROOM / LIBRARY

w
LVL +0.60M FROM ROAD LVL
ING TR

COURTYARD COURTYARD

TITLE
zali work

8.1M X 5M 4.9M X 5M
CONFERENCE ROOM
4.9M X 5M
D1
HALL

JOGGING TRACK
D1 D1 D1 LVL +1.05M

LVL +1.20M 7M X 5M STEAM BATH


MALE MASSAGE FEMALE MASSAGE SAUNA
ROOM ROOM
65 SQ.MT
PROPOSED OFFICERS CLUB, LATUR
LVL +1.05M LVL +1.05M
4M x 3.37M 4M x 3.37M
GATE 0.23x0.53 V 2.7 M x 3.37 M 2.7 M x 3.37 M

FIXED TOUGHNED GLASS FIXED TOUGHNED GLASS


DUCT

FIXED TOUGHNED GLASS


LVL +1.20M

FIXED TOUGHNED GLASS


panel
LVL +1.20M

panel
LVL +1.20M

FIXED TOUGHNED GLASS FIXED TOUGHNED GLASS


DUCT C23
OF THE

i
ENTRANC

JOGG

OPENABLE GLASS OPENABLE GLASS

PROJECT
M.S. LOUVERS W1 W1 W1 W1 M.S. LOUVERS
FIXED TOUGHNED GLASS
d

SIT OUT SIT OUT


E GAT

water trough zali work zali work water trough

SLEEVE TO HIDE SLEEVE TO HIDE


66.31M
E3

RAIN WATER PIPE RAIN WATER PIPE

d
wall in stone wall in stone
cladding with cladding with
4m height
C6 C7
4m height

wall in stone wall in stone


fixed toughned fixed toughned
cladding with cladding with

water body glass glass

water body
CHECKED : KK
waterfall having waterfall having

DRAWN DD
wall 3.5m height wall 3.5m height

teak wood teak wood


a

LVL +0.45M
SKY SITTING WITH ARTIFICIAL MD WATERFALL WITH RAINFALL LVL +0.45M

LAWN LVL +1.20M


LVL +1.20M

e
wall with 1.20m height wall with 1.20m height

SCALE DATE:
LVL +1.20M

7
C3
wall with 0.75m height wall with 0.75m height
LVL +0.45M 6 LVL +0.45M

5
4
C1 C4
3
2
o

NOTE : 1
C1,2,3,4, IS TAKEN SQUARE UPTO 1M FROM
PLINTH AND AFTER 1M IT IS TAKEN AS TREAD = 300MM
ROUND COL. PLEASE REFER ELEVATION FOR RISER = 150MM
THIS UP

r
LVL +0.15M

wall with 0.75m height wall with 0.75m height

FRONT YARD

PLINTH PROTECTION PLINTH PROTECTION


r

LVL +0.00M

o
LVL +0.30M FROM ROAD LVL LVL +0.30M FROM ROAD LVL
consultants
PARTY LAWN
e

a
Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,
Latur-413512,Maharashtra.
d

Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in

d
ARCHITECTS:
i

LVL +0.15M FROM ROAD LVL


w

KRISHNAKUMAR BANGAD
FIIA, COA, FIV, IIID
9m

JOGGING TRACK JOGGING TRACK


FOUNTAIN CA/2004/32977
GATE 1 A

GATE 2 A

VISITORS PARKING VISITORS PARKING

118.16M

SITE PLAN
SCALE-1:350 THIS IS A PRESENTATION DRAWING IT MAY BE MODIFIED DURING EXECUTION
BUILDING TYPE-
SHEET NO:
MAIN BUILDING

KEY PLAN

TITLE: WORKING DRAWING

SPECIFICATIONS:

PLINTH PROTECTION PLINTH PROTECTION

C78 C79 C80 C81


15.40M

7.70M 7.70M

2.75M
C78 C79 C80 C81

2.75M
2.75M
W4 W3 D2 1.58M

JANITOR ROOM
AQUARIUM AT 0.90M LVL
GENTS CHANGING ROOM

0.30M
D4

D6 D6 D6 D6 D6
WAITING LOUNGE
LVL +1.20M LVL +1.20M

PASSAGE D4
SLEEVE TO HIDE D5
SLEEVE TO HIDE SLEEVE TO HIDE SLEEVE TO HIDE W2 W2 D4
RAIN WATER PIPE W2
RAIN WATER PIPE RAIN WATER PIPE RAIN WATER PIPE D1
C66 SMOKING AREA D1 LOBBY
LVL +1.05M C59A 6.14 M x 3 M 6.23 M X 4M
LVL +1.20M
V1 LVL +5.70M
PASSAGE

RECEPTION
FIXED TOUGHNED GLASS UPVC SLIDING TOUGHNED GLASS M.S. LOUVERS UPVC SLIDING TOUGHNED GLASS UPVC SLIDING TOUGHNED GLASS
FIXED TOUGHNED GLASS LVL +5.70M
SHOWER AREA
LVL +1.20M SLEEVE TO HIDE SLEEVE TO HIDE SLEEVE TO HIDE SLEEVE TO HIDE
D6 D6 D6 D6 D6 RAIN WATER PIPE RAIN WATER PIPE RAIN WATER PIPE RAIN WATER PIPE LVL +5.70M
D5 D5 C66 COL. TO BE MERGED
D4 0.23x0.53 C59A
DUCT
W.C. W.C. 0.68M jali work 0.68M

0.60M

0.60M
0.23x0.60 W2 W2
V DUCT V
LVL +1.20M LVL +1.20M
D4 D4 0.23x0.53
DUCT 3 W3
V V
2.25 sqmt
V
TREAD = 300MM V TOILET TOILET V 0.30M

D5 0.23x0.60
UP 1
RISER = 177.8MM
LOBBY LADIES CHANGING ROOM V V LVL +4.90M D5 LVL +5.90M LVL +5.70M

COL. TO BE MERGED COL. TO BE MERGED


D5 D5
GYMNASIUM FOR 50 PEOPLES D3 0.30x0.68
2
3
26
25 0.30x0.68
D1
LVL +1.05M
D6 D6 D6
W.C. W.C.
TOILET 1 TOILET 2
4 24 2M X 2.50M TREAD = 300MM
D1 D5 D5 2M X 2.50M
UP
RISER = 177.8MM
5 23
LVL +5.90M
UPVC SLIDING TOUGHNED GLASS 6 22
LVL +5.90M
BEDROOM 5
0.23x0.53
7 21 D4 D2 D2 3.89M X 6.1M BEDROOM 6 0.30x0.68
0.30M

0.23x0.53 0.30x0.68 LVL +5.70M

D2
8 20
PASSAGE
SHOWER AREA
LVL +5.70M
4.00M X 4.50M LVL +5.70M
9 19 BEDROOM 1 BEDROOM 2
LVL +5.70M

BILLARD ROOM 10 18 D3 PRESIDENT CABIN D6 D6 D6 D6 D6


D5
W2
4.07M X 4.50M 3.89M X 6.1M
LVL +5.70M COL. TO BE MERGED
COL. TO BE MERGED

6.15M X 6M 11 17
16 4.26 M X 6 M JANITOR ROOM
LVL +5.70M
COL. TO BE MERGED COL. TO BE MERGED
0.23x0.53

12 0.23x0.53
13 15 LVL +1.20M LVL +1.20M LVL +1.20M
SQUASH COURT
14
WAITING LOUNGE 6.23M x 10M BADMINTON COURT BADMINTON COURT
9.42M X 10M BADMINTON COURT
LVL +1.20M
LVL +3.15M ADMIN. OFFICE BACK OFFICE TOILET
D4 D4 LVL +5.60M
D4 D4 6.10M X 13.40M 6.10M X 13.40M 6.10M X 13.40M 70.23M

LVL +3.15M
6.4 M X 6 M 5MX6M COL. TO BE MERGED
PEDICURE
D4 COL. TO BE MERGED
AND MANICURE
PASSAGE
3.47 M x 3.85 M 6.15M x 3.85M 1.98 M x 3.85M
CAPACITY OF 6 PASSENGER
SPA W2 TREAD = 300MM
LIFT PASSAGE LVL +5.70M PASSAGE RISER = 150MM
LD 1.40M X 1.80M
LVL +5.70M
UP UP CRICKET NET PRACTICE PITCHES
0.30M
FIXED TOUGHNED GLASS FIXED TOUGHNED GLASS

D4
D5 D4 D4 D4 D4 D4 LIFT
1.40M X 1.80M
LD

1.88M
D1 1.00M LVL +5.60M
LVL +1.20M
D4
TOILET
panel

LVL +1.20M PASSAGE


5.37M 2.01M COL. TO BE MERGED
2MX4M D4 D4
LVL +5.70M
COL. TO BE MERGED
UPVC SLIDING TOUGHNED GLASS
LVL +1.20M RECEPTION zali work
LVL +1.20M
D4 D4 5.00M 1.80M 0.60M 1.86M 0.60M 1.69M 1.80M 1.23M COL. TO BE MERGED COL. TO BE MERGED

MEETING ROOM / LIBRARY COURTYARD zali work


COURTYARD BEDROOM 4 D4 D4
8.1M X 5M 4.9M X 5M
CONFERENCE ROOM W2
LIVING ROOM 1 BEDROOM 3 3.89M X 6.1M LIVING ROOM 2 PROVISION FOR OPEN COURT
LVL +1.20M
D1 D1
HALL D1 4.9M X 5M D1
7M X 5M
LVL +1.05M

STEAM BATH
MALE MASSAGE
ROOM
FEMALE MASSAGE
ROOM
SAUNA
4.07M X 4.50M
LVL +5.70M
3.89M X 6.1M
LVL +5.70M
4.07M X 4.50M
LVL +5.70M
W2 W2 W2
LVL +1.05M

65 SQ.MT LVL +1.05M


4M x 3.37M

60.44M
4M x 3.37M
0.23x0.53 V 2.7 M x 3.37 M 2.7 M x 3.37 M
TOILET 3 TOILET 4 COURTYARD
O.T.S.
1 O.T.S.
LVL +1.20M LVL +1.20M
2M X 2.50M 2M X 2.50M
DUCT LVL +1.20M 0.37M 5.00M TENNIS COURT FOR DOUBLES
LVL +5.90M LVL +7.20M
FIXED TOUGHNED GLASS FIXED TOUGHNED GLASS FIXED TOUGHNED GLASS
panel panel DUCT C23 LVL +5.90M
25.00sqmt
FIXED TOUGHNED GLASS FIXED TOUGHNED GLASS FIXED TOUGHNED GLASS 12.54M
0.23x0.53

8.10M
OPENABLE GLASS OPENABLE GLASS
BALCONY 1
BALCONY 2
HALL

SWIMMING POOL
M.S. LOUVERS W1 W1 W1 W1 M.S. LOUVERS
FIXED TOUGHNED GLASS
C23
2.50M X1.45M VDUCT 1 V
2.26 sqmt 2.50M X1.45M
water trough SIT OUT zali work zali work SIT OUT water trough
W2 W2
12.5M X 8.4M
jali work

5.40M
SLEEVE TO HIDE SLEEVE TO HIDE

wall in stone
RAIN WATER PIPE RAIN WATER PIPE
wall in stone
jali work
cladding with cladding with
4m height
C6 C7
4m height
wall in stone wall in stone
fixed toughned fixed toughned
cladding with cladding with
SLEEVE TO HIDE
waterfall having
wall 3.5m height water body glass glass

water body waterfall having


wall 3.5m height RAIN WATER PIPE
SLEEVE TO HIDE
RAIN WATER PIPE
TENNIS COURT FOR DOUBLES
C6 C7
0.60M 0.60M
teak wood teak wood

0.30M
3.44M 0.60M 3.26M

0.30M
0.60M 3.44M
SKY SITTING WITH ARTIFICIAL MD WATERFALL WITH RAINFALL 55.12M

126.57M
LVL +0.45M LVL +0.45M

LAWN LVL +1.20M LVL +1.20M


1.50M 1.50M
wall with 1.20m height wall with 1.20m height JOGGING TRACK

FIRST FLOOR PLAN


LVL +1.20M
SKY SITTING WITH ARTIFICIAL WATERFALL WITH RAINFALL BABY POOL

7
C3
wall with 0.75m height wall with 0.75m height
LAWN
LVL +0.45M 6 LVL +0.45M

4.20M
wall with 1.20m height wall with 1.20m height
5

4.20M

4.20M
4 C4
C1
3 C3
2
NOTE :
C1,2,3,4, IS TAKEN SQUARE UPTO 1M FROM
PLINTH AND AFTER 1M IT IS TAKEN AS
ROUND COL. PLEASE REFER ELEVATION FOR
THIS
1
TREAD = 300MM
RISER = 150MM
UP C1
7.70M
C4 SCALE-1:175 GYMNASIUM FOR 50 PEOPLES

7.70M
LVL +0.15M
NOTE :
wall with 0.75m height wall with 0.75m height

9m
C1,2,3,4, IS TAKEN SQUARE UPTO 1M FROM

FRONT YARD PLINTH AND AFTER 1M IT IS TAKEN AS


ROUND COL. PLEASE REFER ELEVATION FOR

K
THIS

ING TRAC

w
PLINTH PROTECTION PLINTH PROTECTION HALL

JOGGING TRACK
65 SQ.MT

i
JOGG

d
66.31M
d
LVL +0.00M water body water body

e
a

r
o

o
r
PARTY LAWN

a
e

d
d i
w
9m
JOGGING TRACK JOGGING TRACK

FOUNTAIN

VISITORS PARKING VISITORS PARKING

SITE PLAN
SCALE-1:1500

15.40M

7.70M 7.70M
1.77M

1.77M

1.58M
1.77M

0.30M
23.14M
3.63M

GUTTER

SLEEVE TO HIDE SLEEVE TO HIDE SLEEVE TO HIDE


SLAB BELOW

SLEEVE TO HIDE
SLEEVE TO HIDE
RAIN WATER PIPE
SLEEVE TO HIDE
RAIN WATER PIPE
SLEEVE TO HIDE
RAIN WATER PIPE
SLEEVE TO HIDE
RAIN WATER PIPE
OFFICERS CLUB
RAIN WATER PIPE
RAIN WATER PIPE RAIN WATER PIPE RAIN WATER PIPE 0.68M 0.68M 0.68M 0.68M

(PRESIDENT; HON.

0.60M

0.60M

0.60M

0.60M
0.68M jali work 0.68M 0.68M 0.68M
0.60M

0.60M

W2 W2

COLLECTOR,LATUR DISTRICT)
0.23x0.53
10.08M D4 D4
LVL +14.70M
10.08M 0.23x0.53 LVL +14.70M
C66 6.23M
C62 V V W3
V TOILET D5 D5 TOILET
0.30M
LVL +14.55M
LVL +10.40M LVL +10.40M V LVL +10.20M
D2
D5 D5 LVL +10.20M

SLOPE
1.88M

TOILET TOILET DN
2M X 2.50M 2M X 2.50M
UP
TITLE
LVL +10.40M
LVL +10.40M 0.30x0.68
0.30x0.68
0.30M
LVL +16.13M
0.30x0.68
0.30x0.68
LVL +14.70M

W2
LVL +10.20M
LVL +10.20M
LVL +10.20M

0.23x0.53
RIDGE LINE
0.23x0.53

OF THE PROPOSED OFFICERS CLUB, LATUR


10.00M

LVL +14.70M
TO BE COVERED BY POLYCORBONATE SHEET

BEDROOM BEDROOM BEDROOM BEDROOM


4.07M X 4.50M 3.89M X 6.1M 3.89M X 6.1M 4.07M X 4.50M TABLE TENNIS
LVL +10.20M
WAITING LOUNGE 6.23M X 10M

PROJECT
LVL +10.20M
D4 D4 D4 D4
LVL +10.10M 1.76M
2.96M C44
1.76M

SLOPE
SLOPE

1.80M
1.80M
C44
1.80M
1.80M

3.70M

W2 PASSAGE LVL +10.20M PASSAGE 3.70M

DRAWN DD CHECKED : KK
0.30M D4 MACHINE ROOM
0.92M 2.01M 0.77M
3.70M x 1.80M
1.80M

1.80M

LIFT
LD 1.40M X 1.80M
1.88M

1.00M LVL +10.10M

D4 D4 D4 D4 6.23M TO BE COVERED BY POLYCORBONATE SHEET

2.01M

HEIGHT TO BE TAKEN
W2
LIVING ROOM
4.07M X 4.50M
LIVING ROOM
W2
AS PER SECTION
SLAB BELOW
LVL +13.20M SCALE DATE:
4.07M X 4.50M
LVL +10.20M OPEN TO SKY TO BE OPEN TO SKY TO BE
LVL +10.20M

BEDROOM TOILET TOILET BEDROOM O.T.S.


HEIGHT TO BE TAKEN AS O.T.S.
COVERED BY POLYCORBONATE SHEET COVERED BY POLYCORBONATE SHEET

3.89M X 6.1M 2M X 2.50M 2M X 2.50M GUTTER


3.89M X 6.1M
LVL +10.20M
LVL +10.40M
LVL +10.40M
LVL +10.20M PER SECTION 2.46M

D4

0.93M
D4
D5 D5
BALCONY V V BALCONY

W2
DOME TO BE TAKEN
W2
AS PER ELEVATION
jali work jali work

SLEEVE TO HIDE
RAIN WATER PIPE
SLEEVE TO HIDE
RAIN WATER PIPE
consultants
SLEEVE TO HIDE SLEEVE TO HIDE
RAIN WATER PIPE RAIN WATER PIPE
0.60M 0.60M

0.30M

0.30M
0.60M 0.60M
0.23 x 0.53
0.30M

0.30M

1.50M 0.90M

SKY SITTING WITH ARTIFICIAL WATERFALL WITH RAINFALL Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,
LAWN
4.20M
4.20M

4.20M

SLAB BELOW Latur-413512,Maharashtra.


Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in
C1 C2 C3 C4

7.70M 7.70M

ARCHITECTS:
KRISHNAKUMAR BANGAD
SECOND FLOOR PLAN FIIA, COA, FIV, IIID
CA/2004/32977

THIS IS A PRESENTATION DRAWING IT MAY BE MODIFIED DURING EXECUTION


BUILDING TYPE-
SHEET NO:
MAIN BUILDING
BUILT UP AREA GROUND FLOOR PLAN
GROUND FLOOR,FIRST FLOOR,SECOND FLOOR
BUILT UP AREA STATEMENT UNIT
BUILT UP AREA GROUND FLOOR 1327.56 SQ.MT.
TITLE: BUILT UP AREA
DEDUCTIONS
COURTYARD 1 24.04 SQ.MT. SPECIFICATIONS:
COURTYARD 2 24.04 SQ.MT.
DUCT 1 2.26 SQ.MT.
DUCT 2 1.86 SQ.MT.
DUCT 3 2.26 SQ.MT.
DUCT 4 3.68 SQ.MT.
LIFT 3.63 SQ.MT.

TOTAL DEDUCTIONS 61.77 SQ.MT.


BUILT-UP AREA STATEMENT
CORRESPONDING
CARPET AREA INCLUDING
STAIRCASE,LIFTS
70.23M

TOTAL BUILT-UP AREA 1265.7 SQ.MT. CRICKET NET PRACTICE PITCHES

BUILT UP AREA FIRST FLOOR PLAN PROVISION FOR OPEN COURT

60.44M
TENNIS COURT FOR DOUBLES

BUILT UP AREA STATEMENT AREA UNIT

SWIMMING POOL
BUILT UP AREA GROUND FLOOR 1275.67 SQ.MT.

GROUND FLOOR PLAN


TENNIS COURT FOR DOUBLES

DEDUCTIONS 55.12M

126.57M
JOGGING TRACK

BABY POOL

COURTYARD 1 25.00 SQ.MT. GYMNASIUM FOR 50 PEOPLES

COURTYARD 2 24.50 SQ.MT.

9m
TRACK
DUCT 1 2.26 SQ.MT.

w
HALL

JOGGING TRACK
65 SQ.MT

JOGGING

i
d

66.31M

d
1.40
water body water body

DUCT 2 SQ.MT.

e
o

r
DUCT 3 2.25 SQ.MT.

o
PARTY LAWN

a
LIFT

d
3.63 SQ.MT.

d
i
w
9m
JOGGING TRACK JOGGING TRACK
FOUNTAIN

VISITORS PARKING VISITORS PARKING

TOTAL DEDUCTIONS 59.04 SQ.MT.

BUILT-UP AREA STATEMENT


CARPET AREA INCLUDING SITE PLAN
STAIRCASE,LIFTS SCALE-1:1500

TOTAL BUILT-UP AREA 1216.63 SQ.MT.

BUILT UP AREA SECOND FLOOR PLAN


BUILT UP AREA STATEMENT AREA UNIT
BUILT UP AREA GROUND FLOOR 730.95 SQ.MT.

DEDUCTIONS OFFICERS CLUB


(PRESIDENT; HON.
COURTYARD 1 COLLECTOR,LATUR DISTRICT)
25.00
COURTYARD 2 24.50 SQ.MT.
DUCT 1 2.26 SQ.MT. TITLE
OF THE PROPOSED OFFICERS CLUB, LATUR
DUCT 3 2.25 SQ.MT.
FIRST FLOOR PLAN C1 9.84 PROJECT
C2 9.83
DRAWN DD CHECKED : KK
LIFT 3.63
SCALE DATE:
TOTAL DEDUCTIONS 77.31 SQ.MT.

BUILT-UP AREA STATEMENT SQ.MT.


CARPET AREA INCLUDING consultants
STAIRCASE,LIFTS
Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,
Latur-413512,Maharashtra.
TOTAL BUILT-UP AREA 653.64 SQ.MT. Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in
SUMMERY :
ARCHITECTS:
SR. TYPE OF NOS OF NOS OF B.U.A./ STAIRCASE LIFT TOTAL UNITS KRISHNAKUMAR BANGAD
NO. BUILDING BLDG FLR. INCLU. HEAD MACHINE B.U.A. FIIA, COA, FIV, IIID
NOS NOS BALC. ROOM ROOM CA/2004/32977
STAIR, LIFT
1. RECREATIONAL BUILDING 1 GR + 2 3135.97 34.11 8.45 3178.53 SQ.MT.
1265.7 + 1216.63+653.64
GR FLR + FIRST FLR

FSI CALCULATIONS :
SR. NET PLOT AREA 12318 SQ.MT.
1 FSI PERMISSABLE 12318 X 1 = 12318 SQ.MT 12318 SQ.MT.
SECOND FLOOR PLAN 2 BUILT UP AREA AS PER ABOVE 3179 SQ.MT.
FSI CONSUMED 3179/12318 0.25 THIS IS A PRESENTATION DRAWING IT MAY BE MODIFIED DURING EXECUTION
BUILDING TYPE-
SHEET NO:
0.95M
CARPET AREA CALCULATION OF TOILETS MAIN BUILDING
5.40M

1.41M
GENTS CHANGING ROOM

JANITOR ROOM
TOILET1 P2
7.60
NAME OF AREA NO. SIZES AREA UNIT

2.61M
11.06M
CHANGING CHANGING CHANGING CHANGING CHANGING

WAITING LOUNGE ROOM 1 ROOM 2 ROOM 3 ROOM 4 ROOM 5

GROUND FLOOR PLAN

1.10M
22.91M
P1 1.16 1.16 1.11 1.16 1.16 2.57
TOILET 1

3.02M
1.00M 1.00M 0.56M 1.00M 1.00M
8.23
P3
PASSAGE 3 7.07
GENTS CHANGING

RECEPTION
SHOWER AREA

93.78 SQMT 88.24 SQMT

8.00M
S1 S2 S3 S4 S5 W.C.1 W.C.2
ROOM TITLE: CARPET AREA

1.14M

1.14M

1.14M

1.14M

1.20M
1.10M
0.89 0.89 0.89 0.89 0.89

PASSAGE 5
6.23M 1.33 1.33

3.04M
0.75M 0.75M 0.75M 0.75M 0.75M
1.14M

49.37
3.90M
DUCT 4
TOILET2 P2 PASSAGE P1 8.23

1.50M
LOBBY 6.71 3.68 sqmt

3.77M
SPECIFICATIONS:
LADIES CHANGING ROOM

GYMNASIUM FOR 50 PEOPLES 24.86 SQMT CHANGING CHANGING CHANGING


0.60M
PASSAGE P2 5.40 X 1.41 7.60 SQMT
P1

1.17M

1.17M

1.17M
ROOM 1 ROOM 2 ROOM 3 W.C.1 W.C.2

14.42 1.23 1.23 1.23 1.33 1.33


1.00M 1.00M 1.00M

CHANGING ROOMS 4 1.00 X 1.10 4X1.16=4.64 SQMT

5.00M
P3 SHOWER AREA

0.95M
6.19
4.97M 4.26M 6.62M
CHANGING ROOM 3 1 SQMT

10.00M
PASSAGE 1
STAIRCASE
PASSAGE 2 1.00 X 1.10 1.11

5.76M
1.58M S1 S2 S3 S4 S5 JANITOR ROOM

1.08M
21.22 SQM

1.14M

1.14M

1.14M

1.14M

1.14M
0.89 0.89 0.89 0.89 0.89 2.64

6.00M
20.52M 25.88 25.35 39.71 SQMT 30.14 SQMT 25.65 SQMT 0.75M 0.75M 0.75M 0.75M 0.75M
2.36M
6.14M
SHOWER AREA

8.02M
3.47M
BILLARD ROOM 6.15M 1.98M

6.00M

6.00M
6.15M X 6M ADMIN. OFFICE BACK OFFICE PRESIDENT CABIN

6.00M
6.4 M X 6 M 13.44 23.89 7.77 SHOWER ROOMS 5 0.75 X 1.14 5 X0.89=4.45 SQMT

6.00M
3.70M
5MX6M 4.26 M X 6 M
PEDICURE

3.85M
37.90 SQMT

3.85M
3.85M
2.96M AND MANICURE SPA TOILET 3

LIFT
3.47 M x 3.85 M 6.15M x 3.85M 1.98 M x 3.85M
PASSAGE P3 7.07
3.63 sqmt

3.73M
3.63
3.73M
6.42M
W.C 1 1.14 X 1.10 1.33
7.09M PASSAGE 4
4.90M 4.91M
TOILET 4
20.47 W.C 2 1.14 X 1.10 1.33

1.48M
8.13M
35.53 SQMT 2MX4M 13.83M

MEETING ROOM / LIBRARY COURTYARD 1


12.54M
COURTYARD 2 CONFERENCE ROOM 8.31 JANITOR ROOM 0.95 X 2.61 2.57

4.07M
8.1M X 5M 4.9M X 5M 4.9M X 5M 7M X 5M 13.52 9.11 9.16 13.63

5.00M
5.00M

5.00M

5.00M
HALL 24.50 sqmt
STEAM BATH MALE MASSAGE FEMALE MASSAGE SAUNA
TOTAL 38.33 SQMT

3.37M

3.37M

3.37M
40.96 SQMT 24.50 sqmt 2.00M
4M x 3.37M ROOM
2.7 M x 3.37 M
ROOM
2.7 M x 3.37 M
4M x 3.37M

8.46M
4.00M 2.69M 2.69M 4.00M 70.23M
DUCT 2
1.86 sqmt
NAME OF AREA NO. SIZES AREA UNIT
CRICKET NET PRACTICE PITCHES

107.99 SQMT TOILET 2


LADIES CHANGING PROVISION FOR OPEN COURT

ROOM

60.44M
TENNIS COURT FOR DOUBLES

ENTRANCE STEPS PASSAGE P1 1.58 X 5.00 14.42

SWIMMING POOL
16.10
PASSAGE P2 1.50 X 3.90 6.71 SQMT
CHANGING ROOMS 3 1.00 X 1.17 3X1.23=3.69 SQMT TENNIS COURT FOR DOUBLES

55.12M

126.57M
JOGGING TRACK

BABY POOL

SHOWER AREA GYMNASIUM FOR 50 PEOPLES

SHOWER ROOMS 5 0.75 X 1.14 5 X0.89=4.45 SQMT

9m
TRACK

w
HALL

JOGGING TRACK
65 SQ.MT

JOGGING
PASSAGE P3 6.62 X 0.95 6.19

i
d

66.31M

d
water body water body

e
W.C 1 1.33

o
1.14 X 1.10

r
r

o
PARTY LAWN

a
W.C 2 1.14 X 1.10 1.33

d
i
w
JANITOR ROOM

9m
JOGGING TRACK JOGGING TRACK

2.36 X 1.08 2.64 VISITORS PARKING


FOUNTAIN

VISITORS PARKING

TOTAL 40.76 SQMT

NAME OF AREA SIZES AREA UNIT SITE PLAN


SCALE-1:1500
TOILET 3 1.98 X 3.85 7.62 SQMT

NAME OF AREA SIZES AREA UNIT

TOILET 4 2X4 8.31 SQMT


TOTAL CARPET AREA FOR TOILET 95.02 SQMT

OFFICERS CLUB
DEDUCTIONS (PRESIDENT; HON.
COLLECTOR,LATUR DISTRICT)
CARPET AREA STATEMENT AREA UNIT
SERVICES AREAS: TITLE
OF THE PROPOSED OFFICERS CLUB, LATUR
PROJECT
16.10
GROUND FLOOR PLAN MAIN ENTRANCE STEPS 16.10 SQ.MT.

CHECKED : KK
SCALE-1:150 DRAWN DD
CARPET AREA CALCULATION GROUND FLOOR PLAN STAIRCASE 21.22 SQ.MT.
SCALE DATE:
LIFT 3.63 SQ.MT.
CARPET AREA CALC. TYPICAL ROOM
ROOM SIZE CARPET AREA UNIT COURTYARD 1 24.50 SQ.MT.
GYMNASIUM 286.70 286.70 SQ.MT consultants
COURTYARD 2 24.50 SQ.MT.
MEETING ROOM/LIBRARY 8.1X5 M 40.96 SQ.MT
BILLARD ROOM 6.15 X 6 M 37.90 SQ.MT CARPET AREA CALCULATION OF PASSAGE/WAITING AND LOBBY AREA DUCT 1 2.26 SQ.MT. Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,
Latur-413512,Maharashtra.
Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in
HALL 107.99 SQ.MT CARPET AREA STATEMENT AREA UNIT DUCT 2 1.40 SQ.MT.
ADMIN OFFICE 6.4 X 6 M 39.71 SQ.MT SERVICES AREAS: ARCHITECTS:
DUCT 3 2.26 SQ.MT.
BACK OFFICE 5 X6 M 30.14 SQ.MT LOBBY 24.86 SQ.MT. KRISHNAKUMAR BANGAD
WAITING LOUNGE 88.24
PRESIDENT CABIN 4.26 X6 M 25.65 SQ.MT FIIA, COA, FIV, IIID
CONFERENCE ROOM 7.00 X 5 M 35.53 SQ.MT PASSAGE 1 25.88 SQ.MT. CA/2004/32977
STEAM BATH 4.00 X 3.37 M 13.52 SQ.MT TOTAL CARPET AREA AREA UNIT
PASSAGE 2 25.35 SQ.MT.
MALE MASSAGE ROOM 2.7 X 3.37 M 9.11 SQ.MT
FEMALE MASSAGE ROOM 2.7 X 3.37 M 9.16 SQ.MT PASSAGE 3 93.78 SQ.MT. SUM OF ROOM AREAS 687.33 M SQMT
SAUNA 4 X 3.37 M 13.63 SQ.MT
PASSAGE 4 20.47 SQ.MT. SUM OF PASSAGE/LOBBY AREAS 327.95 M SQMT
SPA 6.15 X 3.85 M 23.89 SQ.MT
SUM OF TOILET AREAS 95.02 M SQMT
PEDICURE & MANICURE 3.47 X 3.85 M 13.44 SQ.MT PASSAGE 5 49.37 SQ.MT.
SMOKING AREA 6.14 X 3 M 18.50
TOTAL CARPET AREA FOR ROOMS 687.33 SQMT TOTAL CARPET AREA FOR PASSAGE 327.95 SQMT TOTAL CARPET AREA FOR 1110.30 M
SQMT
GROUND FLOOR THIS IS A PRESENTATION DRAWING IT MAY BE MODIFIED DURING EXECUTION
CARPET AREA CALCULATION OF TOILETS
BUILDING TYPE-
SHEET NO:
MAIN BUILDING

18.50 SQM
10.08M

18.78 SQM FIRST FLOOR PLAN


SMOKING AREA

3.02M
LOBBY

3.02M
6.14 M x 3 M
PASSAGE 1 6.23 M X 3 M
6.23M

5.45M
6.14M
55.00 SQM TITLE: CARPET AREA
3.69 3.89M DUCT 3 3.69

1.45M
2.25 sqmt

TOILET 5
1.45M

TOILET 6
2.50M 2.50M
3.89M
6.44
TOILET 1
6.44
TOILET 2
4.00M
62.53 SQM SPECIFICATIONS:

2.50M
4.07M

23.73 SQM 23.88 SQM 18.08 SQM 450.16 SQM

2.50M
2M X 2.50M 2M X 2.50M

24.90 SQM
18.30 SQM BEDROOM 5 9.42M

6.10M
6.10M BEDROOM 6
2.00M 3.89M X 6.1M 4.00M X 4.50M
BEDROOM 1 BEDROOM 2 2.00M

PASSAGE 2
4.50M

4.07M X 4.50M 3.89M X 6.1M

4.50M
9.83 SQMT WAITING LOUNGE
9.42M X 10M
STAIRCASE SQUASH COURT
C2
89.37 SQM

10.00M
21.22 SQM 6.23M x 10M BADMINTON COURT HALL

19.46M
23.29M X 19.46M

10.00M
DEDUCTIONS
66.42 SQM
PASSAGE 3
2.73M

CARPET AREA STATEMENT AREA UNIT


LIFT
SERVICES AREAS:
9.84 SQMT 3.63 6.23M
STAIRCASE 21.22 SQ.MT.
18.40 SQM 23.94 SQM C1 23.99 SQM 18.06 SQM
LIFT 3.63 SQ.MT.

4.50M
LIVING ROOM 1 BEDROOM 3 LIVING ROOM 2
BEDROOM 4
6.10M
3.89M X 6.1M
6.10M

4.07M X 4.50M 3.89M X 6.1M 4.07M X 4.50M


6.33
TOILET 3
6.27

TOILET 4 COURTYARD
O.T.S.
1 104.96 SQM COURTYARD 2 COURTYARD 1 24.50 SQ.MT.
2M X 2.50M 2M X 2.50M 23.29M
25.00sqmt 24.50 sqmt
3.72
2.50M 3.89M 2.50M
3.72
COURTYARD 2 24.50 SQ.MT. 70.23M
1.45M

BALCONY 1 1.45M

2.50M X1.45M DUCT 1


BALCONY 2
HALL DUCT 2

8.40M
2.26 sqmt 2.50M X1.45M 1.40

12.5M X 8.4M DUCT 1 2.26 SQ.MT. CRICKET NET PRACTICE PITCHES

jali work

DUCT 2 1.86 SQ.MT.


12.54M PROVISION FOR OPEN COURT

60.44M
DUCT 3 2.26 SQ.MT. TENNIS COURT FOR DOUBLES

SWIMMING POOL
DUCT 4 3.68 SQ.MT.

C1 9.84 SQ.MT. TENNIS COURT FOR DOUBLES

55.12M

126.57M
C2 9.83 SQ.MT. JOGGING TRACK

BABY POOL

GYMNASIUM FOR 50 PEOPLES

9m
TRACK

w
HALL

JOGGING TRACK
65 SQ.MT

JOGGING

i
d

66.31M

d
water body water body

e
o

r
r

o
PARTY LAWN

CARPET AREA CALCULATION FIRST FLOOR TOILETS

a
d

d
i
w
9m
JOGGING TRACK JOGGING TRACK

NAME OF AREA SIZES AREA UNIT VISITORS PARKING


FOUNTAIN

VISITORS PARKING

TOILET 1 2.00X2.50 6.44 SQMT


TOILET 2 2.00X2.50 6.44 SQMT SITE PLAN
TOILET 3 2.00X2.50 6.33 SQMT SCALE-1:1500
TOILET 4 2.00X2.50 6.27 SQMT
TOILET 5 2.50X1.45 3.69 SQMT
TOILET 6 2.50X1.45 3.69 SQMT
TOTAL CARPET AREA FOR TOILETS 32.86 M SQMT

OFFICERS CLUB
(PRESIDENT; HON.
CARPET AREA CALCULATION OF PASSAGE/WAITING AND LOBBY AREA COLLECTOR,LATUR DISTRICT)

FIRST FLOOR PLAN CARPET AREA STATEMENT AREA UNIT TITLE


PROPOSED OFFICERS CLUB, LATUR
SCALE-1:150 SERVICES AREAS: OF THE
LOBBY 18.78 SQ.MT. PROJECT
WAITING LOUNGE 89.37
DRAWN DD CHECKED : KK
CARPET AREA CALCULATION FIRST FLOOR PLAN
PASSAGE 1 55.00 SQ.MT. SCALE DATE:
CARPET AREA CALC. TYPICAL ROOM
ROOM SIZE CARPET AREA UNIT PASSAGE 2 24.90 SQ.MT.
BEDRROM 1 4X4.5 M 18.30 SQ.MT consultants
BEDRROM 2 3.89X6.1 M 23.73 SQ.MT PASSAGE 3 66.42 SQ.MT.
BEDROOM 3 3.89 X 6.1 M 23.94 SQ.MT Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,
Latur-413512,Maharashtra.
Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in
BEDROOM 4 3.89 X 6.1 M 23.99 SQ.MT TOTAL CARPET AREA FOR PASSAGE 254.47 M SQMT
ARCHITECTS:
BEDROOM 5 3.89 X 6.1 M 23.88 SQ.MT
KRISHNAKUMAR BANGAD
BEDROOM 6 4.00 X 4.50 M 18.08 SQ.MT TOTAL CARPET AREA AREA UNIT
FIIA, COA, FIV, IIID
LIVING ROOM 1 4.00 X4.50 M 18.40 SQ.MT
CA/2004/32977
LIVING ROOM 2 4.00 X4.50 M 18.06 SQ.MT
SUM OF ROOM AREAS 811.97 M SQMT
BALCONY 1 2.50 X 1.45 M 3.72 SQ.MT
BALCONY 2 2.50 X 1.45 M 3.72 SQ.MT SUM OF PASSAGE/LOBBY AREAS 254.47 M SQMT
SQUASH COURT 6.23 X 10 M 62.53 SQ.MT SUM OF TOILET AREAS 32.86 M SQMT
BADMINTON COURT HALL 23.29 X 19.46 M 450.16 SQ.MT
HALL 12.5 X 8.4 M 104.96 SQ.MT
SMOKING AREA 6.14 X 3 M 18.50 SQ.MT TOTAL CARPET AREA FOR 1099.30 M
SQMT
TOTAL CARPET AREA FOR ROOMS 811.97 M SQMT FIRST FLOOR THIS IS A PRESENTATION DRAWING IT MAY BE MODIFIED DURING EXECUTION
BUILDING TYPE-
SHEET NO:
MAIN BUILDING

SECOND FLOOR PLAN

1.70M
2.50M 1.12M 1.12M

TITLE: CARPET AREA


3.89M

1.33M
1.20M
16.54M

1.20M
TOILET 5 DUCT 3
TOILET 6 1.96

1.45M
1.45M
2.25 sqmt

3.69 23.88 SQM 3.69 1.35M

6.33 6.40
23.84 SQM TOILET 1 TOILET 2
18.07 SQM 62.29 SQM SPECIFICATIONS:

2.45M
18.30 SQM 2M X 2.50M 2M X 2.50M

2.50M
BEDROOM 5

6.10M
BEDROOM 6

6.10M
3.89M X 6.1M
BEDROOM 1 BEDROOM 2 2.00M 2.00M 4.07M X 4.50M
136.38 SQM

4.50M

4.50M
4.07M X 4.50M 3.89M X 6.1M 4.14M

10.00M
C2 WAITING LOUNGE

10.00M
STAIRCASE

2.40M
TABLE TENNIS

5.76M
9.83 SQMT
21.22 SQM 6.23M X 10M
4.07M
3.89M 4.15M

56.58 SQM

2.73M
3.70M
PASSAGE 1

20.74M
LIFT

1.80M
3.63 6.23M
C1 2.01M

18.41 SQM 23.94 SQM 23.88 SQM 18.06 SQM

2.40M
9.84 SQMT

4.50M
LIVING ROOM 1 BEDROOM 3 4.14M
LIVING ROOM 2
BEDROOM 4

4.50M
4.07M X 4.50M 3.89M X 6.1M 4.07M X 4.50M
3.89M X 6.1M COURTYARD 1 COURTYARD 2
6.33 6.39 HEIGHT TO BE TAKEN AS

6.10M

4.90M
25.00sqmt 24.50 sqmt
TOILET 3

5.00M
6.10M
TOILET 4
4.07M
2M X 2.50M 2M X 2.50M
4.00M PER SECTION

8.85M
3.72 3.72

1.45M

1.45M
1.33M
BALCONY 1 DUCT 1
2.26 sqmt
BALCONY2 5.00M 5.00M 70.23M
2.50M 3.89M 3.89M 2.35M
1.70M

CRICKET NET PRACTICE PITCHES

SECOND FLOOR PLAN 13.00M PROVISION FOR OPEN COURT

60.44M
SCALE-1:150 TENNIS COURT FOR DOUBLES

SWIMMING POOL
TENNIS COURT FOR DOUBLES

55.12M

126.57M
JOGGING TRACK

BABY POOL

GYMNASIUM FOR 50 PEOPLES

9m
TRACK

w
HALL

JOGGING TRACK
65 SQ.MT

JOGGING

i
d

66.31M

d
water body water body

e
o

r
r

o
PARTY LAWN

a
d
CARPET AREA CALCULATION SECOND FLOOR PLAN CARPET AREA CALCULATION OF PASSAGE/WAITING AND LOBBY AREA

d
i
CARPET AREA CALCULATION OF PASSAGE/WAITING AND LOBBY AREA

w
9m
JOGGING TRACK JOGGING TRACK
FOUNTAIN

VISITORS PARKING VISITORS PARKING

CARPET AREA CALC. TYPICAL ROOM AREA UNIT


CARPET AREA STATEMENT
ROOM SIZE CARPET AREA UNIT SERVICES AREAS:
BEDRROM 1 4X4.5 M 18.30 SQ.MT SITE PLAN
WAITING LOUNGE 136.38 SQ.MT. SCALE-1:1500
BEDRROM 2 3.89X6.1 M 23.84 SQ.MT
BEDROOM 3 3.89 X 6.1 M 23.94 SQ.MT PASSAGE 1 56.58 SQ.MT.

BEDROOM 4 3.89 X 6.1 M 23.88 SQ.MT


TOTAL CARPET AREA FOR PASSAGE 192.96 M SQMT
BEDROOM 5 3.89 X 6.1 M 23.88 SQ.MT
BEDROOM 6 4.00 X 4.50 M 18.07 SQ.MT
LIVING ROOM 1 4.00 X4.50 M 18.41 SQ.MT CARPET AREA CALCULATION FIRST FLOOR TOILETS
OFFICERS CLUB
4.00 X4.50 M SQ.MT (PRESIDENT; HON.
LIVING ROOM 2 18.06 NAME OF AREA SIZES AREA UNIT COLLECTOR,LATUR DISTRICT)
BALCONY 1 2.50 X 1.45 M 3.72 SQ.MT
TITLE
BALCONY 2 2.50 X 1.45 M 3.72 SQ.MT TOILET 1 PROPOSED OFFICERS CLUB, LATUR
2.00X2.50 6.33 SQMT OF THE
TABLE TENNIS 6.23 X 10 M 62.29 SQ.MT PROJECT
TOILET 2 2.00X2.50 6.40 SQMT
TOTAL CARPET AREA FOR ROOMS 238.11 M SQMT DRAWN DD CHECKED : KK
TOILET 3 2.00X2.50 6.33 SQMT
SCALE DATE:
TOILET 4 2.00X2.50 6.39 SQMT
DEDUCTIONS
TOILET 5 2.50X1.45 3.69 SQMT
CARPET AREA STATEMENT AREA UNIT
SERVICES AREAS:
TOILET 6 2.50X1.45 3.69 SQMT consultants

Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,


STAIRCASE 21.22 SQ.MT. TOTAL CARPET AREA FOR TOILETS 32.83 M SQMT
Latur-413512,Maharashtra.
Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in

LIFT 3.63 SQ.MT. ARCHITECTS:


KRISHNAKUMAR BANGAD
COURTYARD 1 24.50 SQ.MT. FIIA, COA, FIV, IIID
TOTAL CARPET AREA AREA UNIT CA/2004/32977
COURTYARD 2 24.50 SQ.MT.

C1 9.84 SQ.MT. 238.11 M


SUM OF ROOM AREAS SQMT
C2 9.83 SQ.MT. SUM OF PASSAGE/LOBBY AREAS 192.96 M SQMT
SUM OF TOILET AREAS 32.83 M SQMT
DUCT 1 2.26 SQ.MT.

DUCT 3 2.25 SQ.MT. TOTAL CARPET AREA FOR 463.90 M


SQMT
DUCT 4 SQ.MT.
SECOND FLOOR THIS IS A PRESENTATION DRAWING IT MAY BE MODIFIED DURING EXECUTION
3.68
NOTE :
C78,79,80,81 IS TAKEN SQUARE UPTO 1M BUILDING TYPE-
FROM PLINTH AND AFTER 1M IT IS TAKEN AS
SHEET NO:
MAIN BUILDING
ROUND COL. PLEASE REFER ELEVATION FOR
THIS

54.05M
PLINTH PROTECTION 15.40M
PLINTH PROTECTION

C78 C79 C80 C81


GROUND FLOOR & FIRST FLOOR PLAN
5.01M 1.58M
1.05M

0.23M

0.37M

0.83M
3.95M 3.69M 3.50M 0.95M 0.52M

0.50M
2.18M 2.92M

W4 0.30M W3 D2 0.75M

0.37M
0.23M
TITLE: WORKING DRAWING

JANITOR ROOM
1.73M
AQUARIUM AT 0.90M LVL
GENTS CHANGING ROOM

D4

2.73M
17.59M LVL +1.20M LVL +1.20M
WAITING LOUNGE
D6 D6 D6 D6 D6

1.43M

1.10M

1.10M

1.10M

1.10M

1.10M
PASSAGE

1.00M
D4 CHANGING ROOM CHANGING ROOM CHANGING ROOM CHANGING ROOM CHANGING ROOM

3.02M
SLEEVE TO HIDE 1.00M 1.00M 1.00M 1.00M 1.00M D5
SLEEVE TO HIDE SLEEVE TO HIDE SLEEVE TO HIDE
SPECIFICATIONS:
0.75M 0.20M

RAIN WATER PIPE RAIN WATER PIPE RAIN WATER PIPE RAIN WATER PIPE 11.06M 5.64M 0.75M
C66
0.20M

C59A

1.07M
LVL +1.05M
0.68M 0.68M 0.68M M 0.68M V1

6.43M
.50

0.60M

0.60M

0.60M

0.60M
FIXED TOUGHNED GLASS UPVC SLIDING TOUGHNED GLASS UPVC SLIDING TOUGHNED GLASS UPVC SLIDING TOUGHNED GLASS LVL +1.20M

RECEPTION
M.S. LOUVERS
R0

R1
FIXED TOUGHNED GLASS
1.05M
SHOWER AREA

.0
0.22M 0.22M 0.22M 0.22M
5.78M

2.27M
0.37M

0.37M

0.37M

0.37M
LVL +1.20M

0M
3.71M 1.98M 0.60M 0.15M 0.60M 0.15M 0.60M 0.15M 0.60M 0.15M 0.60M 0.15M 0.75M
0.39M
0.75M
0.39M
D6 D6 D6 D6 D6
D5 D5
0.83M

0.37M

1.14M

1.14M

1.14M

1.14M

1.14M
0.52M

1.20M

1.20M
3.90M 3.86M 3.71M

1.10M

1.10M
1.58M
1.12M DUCT 0.96M D4 0.23x0.53
3.69M 0.30M 3.74M 0.30M W.C. W.C.
0.30M 0.23M

1.92M
0.75M

0.30M 5.04M 5.04M 0.75M 0.75M 0.75M 0.75M 0.75M


0.30M 0.60M
0.23M 0.30M 0.60M
0.23M
0.30M
0.23x0.60

2.57M

2.57M

0.50M

0.50M
3.90M
V DUCT
V
D4

1.00M
LVL +1.20M LVL +1.20M

3.40M

0.80M
V
TREAD = 300MM

UP 1
RISER = 177.8MM
LOBBY LADIES CHANGING ROOM V V

2.00M
GYMNASIUM FOR 50 PEOPLES 26

0.30M

0.30M
2 D1 D6 D6 D6 0.30M 0.60M
0.23M 0.30M 0.60M
0.23M
0.30M

1.20M
25

1.55M
0.30M

0.30M
0.30x0.68

1.17M

1.17M

1.17M
0.30x0.68 3 W.C. W.C.
D3

1.10M

1.10M
LVL +1.05M

1.20M

1.20M
CHANGING ROOM CHANGING ROOM CHANGING ROOM
24

0.30M

0.30M
4
6.60M 23 D1 D5 D5

0.30M

0.30M
5 1.00M 1.00M 1.00M 0.75M
0.39M
0.75M
0.39M

0.23M

3.98M
22

0.30M

0.30M
UPVC SLIDING TOUGHNED GLASS 6 2.22M 1.48M 0.75M 0.47M 0.75M

6.37M 6.23M 2.07M D2 0.53M 0.23x0.53


D4 D2

0.95M
21 0.23M 0.62M

0.30M

0.30M
7

24.70M

1.20M
0.23x0.53

0.30M

0.30M
8 20

1.57M

1.57M
SHOWER AREA
D2 PASSAGE

0.30M

0.30M

2.00M
9 19

6.01M
0.60M 0.15M 0.60M 0.15M 0.60M 0.15M 0.60M 0.15M 0.60M 0.15M

0.75M
D3

0.30M

0.30M
10 18 D6 D6 D6 D6 D6
D5

6.01M

1.08M
1.14M

1.14M

1.14M

1.14M

1.14M
17

0.30M

0.30M
11 1.58M JANITOR ROOM
3.84M 3.74M 3.98M 3.86M

0.48M
3.90M
0.68M

0.68M
16

0.30M

0.30M
12 0.75M 0.75M 0.75M 0.75M 0.75M
2.36M
15

0.30M

0.30M
13 LVL +1.20M LVL +1.20M LVL +1.20M

1.76M 1.90M
14 3.47M 8.13M

0.68M
BILLARD ROOM

6.23M

6.00M

6.00M
2.96M

1.80M
1.80M
19.69M LVL +1.20M
6.15M X 6M LVL +3.15M
2.96M ADMIN. OFFICE BACK OFFICE PRESIDENT CABIN TOILET

3.98M
15.23M

6.4 M X 6 M 5MX6M 4.26 M X 6 M

4.43M

3.85M
3.38M
LVL +3.15M
3.70M PEDICURE

3.75M

3.75M
D4

3.77M
AND MANICURE PASSAGE 0.30M 70.23M
0.92M 2.24M 0.77M
3.47 M x 3.85 M 6.15M x 3.85M 1.98 M x 3.85M
CAPACITY OF 6 PASSENGER
SPA

1.80M
LIFT
LD 1.40M X 1.80M

1.88M
CRICKET NET PRACTICE PITCHES
0.23M
FIXED TOUGHNED GLASS FIXED TOUGHNED GLASS 0.23M
8.36M 1.25M 2.71M 2.01M 2.68M 2.40M 1.33M 4.02M 0.62M 0.53M
1.59M D4
3.51M D5 D4
1.25M 2.40M 1.23M 1.23M 5.93M 1.07M 1.25M 0.30M
8.06M
D1
D4

1.48M
1.50M

1.50M

1.50M

1.50M
panel LVL +1.20M

TOILET

0.37M
LVL +1.20M PASSAGE
PROVISION FOR OPEN COURT
2MX4M D4 D4 D4
UPVC SLIDING TOUGHNED GLASS
RECEPTION CONFERENCE ROOM D4

60.44M
LVL +1.20M zali work
LVL +1.20M 1.00M 1.00M 1.00M 1.00M
3.00M 1.69M 1.69M 3.00M
MEETING ROOM / LIBRARY

4.07M
COURTYARD zali work
COURTYARD 7M X 5M TENNIS COURT FOR DOUBLES

4.63M

4.63M

4.64M
8.1M X 5M
4.26M

5.00M

2.00M

5.00M

2.00M

2.00M
D1 4.9M X 5M D1 D1 4.9M X 5M D1 LVL +1.05M
MALE MASSAGE FEMALE MASSAGE SAUNA

SWIMMING POOL
LVL +1.20M

8.10M
12.16M STEAM BATH ROOM ROOM

3.37M
3.37M

3.37M
0.23x0.53 2.86M
LVL +1.05M

R4
.78
R4
.5
5M HALL LVL +1.20M LVL +1.05M

V
4M x 3.37M
2.7 M x 3.37 M 2.7 M x 3.37 M
4M x 3.37M

1.22M
M

8.21M
65 SQ.MT

1.20M

1.20M

0.36M
2.00M

0.37M
8.13M

1.50M

1.50M
LVL +1.20M LVL +1.20M
DUCT 7.09M

7.69M
1.20M

7.69M
0.75M
FIXED TOUGHNED GLASS 0.30M FIXED TOUGHNED GLASS
0.30M FIXED TOUGHNED GLASS 0.30M 4.91M panel panel DUCT 0.30M 0.30M 0.30M
C23 0.75M
TENNIS COURT FOR DOUBLES
FIXED TOUGHNED GLASS FIXED TOUGHNED GLASS FIXED TOUGHNED GLASS

0.53M
3.84M 1.12M 1.20M 1.50M 1.20M 1.18M 1.50M 1.19M 4.84M 1.23M 1.50M 1.23M 1.18M 1.50M 1.53M 2.17M 1.18M 2.55M
0.52M
3.74M 4.91M 0.52M
55.12M
0.83M

0.37M

0.37M

0.83M

126.57M
OPENABLE GLASS OPENABLE GLASS
JOGGING TRACK
1.05M 1.05M

M.S. LOUVERS W1 W1 W1 W1 M.S. LOUVERS


FIXED TOUGHNED GLASS BABY POOL

14.00M

3.78M
SIT OUT SIT OUT

2.87M

2.87M
water trough zali work zali work water trough
0.23M

0.23M
GYMNASIUM FOR 50 PEOPLES

SLEEVE TO HIDE SLEEVE TO HIDE


RAIN WATER PIPE RAIN WATER PIPE
1.20M 1.20M
14.61M
wall in stone wall in stone
cladding with cladding with

9m
4m height
C6 C7
4m height

TRACK
wall in stone 0.60M 0.60M wall in stone

0.30M

0.30M
fixed toughned fixed toughned

w
cladding with cladding with

water body water body


HALL

JOGGING TRACK
glass glass 65 SQ.MT

JOGGING
0.23M

0.23M
0.45M 0.45M
waterfall having waterfall having

i
wall 3.5m height wall 3.5m height
4.00M

4.00M

d
4.04M

66.31M

d
4.04M water body water body

e
teak wood 2.00M teak wood

2.17M
7.00M

7.00M

r
WATERFALL WITH RAINFALL

2.19M
SKY SITTING WITH ARTIFICIAL MD

o
LVL +0.45M LVL +0.45M

LAWN LVL +1.20M


4.00M
LVL +1.20M PARTY LAWN

a
1.51M

1.51M
wall with 1.20m height wall with 1.20m height

d
i
LVL +1.20M

11.14M C3 11.14M

w
0.80M
7

0.30M

9m
wall with 0.75m height wall with 0.75m height JOGGING TRACK JOGGING TRACK
6

0.30M
8.80M
LVL +0.45M LVL +0.45M FOUNTAIN

3.50M 5
8.80M

0.30M
3.50M VISITORS PARKING VISITORS PARKING
2.88M

2.88M
4 C4
C1

0.30M
3

0.30M
2

0.30M
0.23M

0.23M
NOTE : 1
C1,2,3,4, IS TAKEN SQUARE UPTO 1M FROM 4.00M
PLINTH AND AFTER 1M IT IS TAKEN AS TREAD = 300MM
ROUND COL. PLEASE REFER ELEVATION FOR RISER = 150MM
1.48M THIS UP 1.48M

4.23M LVL +0.15M 4.23M


wall with 0.75m height

FRONT YARD
wall with 0.75m height

SITE PLAN
PLINTH PROTECTION PLINTH PROTECTION SCALE-1:1500
45.40M
LVL +0.00M

GROUND FLOOR PLAN


SCALE-1:175

15.40M

7.70M 7.70M
2.75M

C78 C79 C80 C81

2.75M
2.75M

1.58M

0.30M
OFFICERS CLUB
0.30M 0.30M 0.30M 0.30M 0.30M

0.68M
(PRESIDENT; HON.

1.70M
W2 W2 D4 3.95M 2.68M 3.76M 3.50M 3.91M 3.99M
W2
COLLECTOR,LATUR DISTRICT)
1.02M

1.02M
SMOKING AREA D1 D1 LOBBY
3.02M

6.14 M x 3 M PASSAGE 6.23 M X 4M

4.00M
LVL +5.70M
LVL +5.70M

SLEEVE TO HIDE SLEEVE TO HIDE SLEEVE TO HIDE SLEEVE TO HIDE

1.63M

2.06M
RAIN WATER PIPE RAIN WATER PIPE RAIN WATER PIPE RAIN WATER PIPE
TITLE
LVL +5.70M
C66 6.23M
COL. TO BE MERGED
C59A
0.68M jali work 0.68M 0.68M 0.68M
PROPOSED OFFICERS CLUB, LATUR
0.60M

0.60M

0.60M

0.60M

6.14M
OF THE
0.22M
W2
0.22M 0.22M 0.22M

W2
5.44M

6.10M 6.10M 6.10M


0.37M

0.37M

0.37M

0.37M

4.78M 1.00M
10.08M

0.75M

0.75M

0.75M
0.75M

0.75M

0.75M
0.28M

0.28M

2.35M 1.12M 2.35M D4


0.37M

0.37M

0.95M 2.00M 0.80M 0.80M 2.00M 0.95M 0.23x0.53


DUCT 3 W3
PROJECT
1.45M

1.45M

V 2.25 sqmt
0.15M 0.15M
0.60M

0.60M

V
0.75M

0.75M

TOILET V 0.45M 0.45M 0.45M 0.30M


V
D5 D5
TOILET LVL +5.70M
0.23x0.60 6.10M 0.45M 6.10M 0.45M 6.10M 0.45M
0.32M

0.32M

LVL +4.90M LVL +5.90M

COL. TO BE MERGED COL. TO BE MERGED


1.75M D5 0.88M 0.88M D5 1.75M

3.24M 0.75M TOILET 1 TOILET 2 0.75M 3.24M


DRAWN DD CHECKED : KK

3.95M

3.95M

3.95M
1.25M

1.25M

2M X 2.50M TREAD = 300MM

3.95M

3.95M

3.95M
2M X 2.50M

4.70M

4.70M

4.70M
RISER = 177.8MM
UP
2.50M
2.50M

2.45M
2.45M

LVL +5.90M
LVL +5.90M
BEDROOM 5
0.30M

0.30M

3.89M X 6.1M BEDROOM 6


0.30M

SCALE DATE:
0.30M

0.30M

0.30x0.68 0.30x0.68 LVL +5.70M


4.00M X 4.50M
2.00M

2.00M

0.30M

0.30M
4.85M

4.85M
6.10M

6.10M

LVL +5.70M
BEDROOM 1 BEDROOM 2
LVL +5.70M
2.00M 2.00M
LVL +5.70M
0.30M

0.30M

LVL +5.70M COL. TO BE MERGED


W2 COL. TO BE MERGED
4.07M X 4.50M 3.89M X 6.1M
4.50M

4.50M

0.30M

0.30M

0.45M 2.60M 0.45M COL.2.60M


TO BE MERGED 2.60M 0.45M 0.45M 2.60M COL. TO 2.60M
BE MERGED 0.45M 0.23x0.53
0.30M

0.30M

10.00M

LVL +5.70M
9.42M 0.23x0.53
0.30M

0.30M

SQUASH COURT
0.30M

0.30M
0.87M

0.87M

6.23M x 10M
0.30M

0.30M

WAITING LOUNGE
BADMINTON COURT BADMINTON COURT BADMINTON COURT

2.00M

2.00M
0.30M

0.30M

9.42M X 10M

2.00M

2.00M

2.00M
D4 D4 D4 D4
6.10M X 13.40M 6.10M X 13.40M 6.10M X 13.40M
0.30M

0.30M

17.46M

LVL +5.60M
0.38M

0.38M

1.00M 2.89M 2.89M 1.00M


2.99M 1.00M 1.00M 2.99M
consultants
0.30M

0.30M

2.96M
1.76M COL. TO BE MERGED

13.40M

13.40M

13.40M
WOODEN RAFTERS
COL. TO BE MERGED
1.80M
1.80M
2.00M

2.00M

2.00M

2.00M
2.73M

2.00M

2.00M

2.00M
W2 TREAD = 300MM
PASSAGE LVL +5.70M PASSAGE RISER = 150MM
3.70M
LVL +5.70M
UP UP Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,
0.30M
0.30M

0.30M
0.30M

0.92M 2.01M 0.77M


Latur-413512,Maharashtra.
0.30M

0.30M

WOODEN RAFTERS

D4 D4 LIFT 0.45M 0.45M 0.45M Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in


0.30M

0.30M
1.80M

2.60M 2.60M 2.60M


1.80M

D4 D4 0.45M 2.60M 0.45M 2.60M 0.45M 2.60M


1.40M X 1.80M
1.20M
0.30M

0.30M

2.99M 2.99M LD

1.88M
1.00M 1.00M
1.87M
0.38M

0.38M

1.00M 2.89M 2.89M 1.00M


1.02M

LVL +5.60M
0.30M

0.30M
0.87M

1.42M

0.30M

0.30M
0.30M

5.37M 2.01M COL. TO BE MERGED COL. TO BE MERGED


ARCHITECTS:
0.30M
0.30M

LVL +5.70M
3.95M

3.95M

3.95M
5.00M 1.80M 0.60M 1.86M 0.60M 1.69M 1.80M 1.23M COL. TO BE MERGED
4.70M

4.70M

4.70M
COL. TO BE MERGED

4.02M

4.02M

4.02M
2.00M

4.50M

BEDROOM 4 D4 D4
LIVING ROOM 1 BEDROOM 3 3.89M X 6.1M LIVING ROOM 2 KRISHNAKUMAR BANGAD
4.85M

4.85M

6.10M

W2 3.89M X 6.1M
6.10M

2.00M

4.07M X 4.50M 2.00M 2.00M 4.07M X 4.50M


LVL +5.70M
LVL +5.70M
LVL +5.70M W2 W2 W2

0.45M
6.10M 0.45M 0.45M
6.10M 0.45M 0.45M
6.10M 0.45M FIIA, COA, FIV, IIID
2.45M

COURTYARD 1
2.50M

2.45M
2.50M

TOILET 3
0.75M

0.75M

0.75M
TOILET 4
0.75M

0.75M

0.75M
O.T.S. O.T.S.
1.25M

2M X 2.50M 1.37M
2M X 2.50M
0.70M

0.37M 5.00M

0.23x0.53
2.99M 1.00M
LVL +5.90M
LVL +5.90M

1.00M 2.99M 25.00sqmt


LVL +7.20M

12.54M
1.37M
6.10M 6.10M 6.10M CA/2004/32977
1.50M 0.88M 0.88M 1.00M 1.50M
2.00M
8.10M
0.75M

0.75M

0.75M

2.46M
0.32M

0.32M
1.08M

1.08M

BALCONY 1
1.45M

1.45M

BALCONY 2
HALL
0.93M

0.93M
0.60M

0.60M

2.50M X1.45M 0.15M VDUCT 1 V 0.15M C23


2.26 sqmt 2.50M X1.45M 4.10M
0.37M

0.37M

1.53M
0.28M

0.28M

2.35M 0.95M 2.00M 0.80M 1.12M 0.80M 2.00M 0.95M 2.35M 3.95M 3.91M 3.99M

W2 W2
12.5M X 8.4M DUMMY JALI WORK

jali work
5.40M

jali work

SLEEVE TO HIDE SLEEVE TO HIDE


RAIN WATER PIPE RAIN WATER PIPE

C6 C7
0.60M 0.60M
0.30M

0.30M

3.44M 0.60M 3.26M 0.60M 3.44M


0.23M

0.23M

0.45M 0.45M

1.50M 1.50M

FIRST FLOOR PLAN


SKY SITTING WITH ARTIFICIAL WATERFALL WITH RAINFALL
LAWN
4.20M

wall with 1.20m height wall with 1.20m height


4.20M

4.20M

C3

C1
7.70M
C4 SCALE-1:175 THIS IS A PRESENTATION DRAWING IT MAY BE MODIFIED DURING EXECUTION
7.70M
NOTE :
C1,2,3,4, IS TAKEN SQUARE UPTO 1M FROM
PLINTH AND AFTER 1M IT IS TAKEN AS
ROUND COL. PLEASE REFER ELEVATION FOR
THIS
BUILDING TYPE-
SHEET NO:
MAIN BUILDING

SECOND FLOOR & TERRACE FLOOR PLAN


15.40M

7.70M 7.70M

1.77M

1.77M
1.77M
1.58M TITLE: WORKING DRAWING

0.30M
23.14M

0.30M
3.95M 2.68M 3.69M 3.50M 3.91M 3.99M
0.30M 0.30M 0.30M

3.63M
0.30M 0.30M

SLAB BELOW
SPECIFICATIONS:

4.46M
SLEEVE TO HIDE SLEEVE TO HIDE SLEEVE TO HIDE SLEEVE TO HIDE
RAIN WATER PIPE RAIN WATER PIPE RAIN WATER PIPE RAIN WATER PIPE

0.68M jali work 0.68M 0.68M 0.68M

0.60M

0.60M

0.60M

0.60M
W2
0.22M 0.22M 0.22M 0.22M

W2

0.37M

0.37M

0.37M

0.37M
10.08M

0.28M

0.28M
2.35M 1.12M 2.35M

0.37M

0.37M
0.95M 2.00M 0.80M 0.80M 2.00M 0.95M 6.14M 0.23x0.53
10.08M 6.23M
C66

1.45M

1.45M
0.15M
C62 0.15M
W3

0.60M

0.60M
V V
TOILET

0.75M

0.75M
0.30M
V D5 D5 TOILET
V LVL +10.20M

0.32M

0.32M
LVL +10.40M
LVL +10.40M
D2
1.75M D5 0.88M 0.88M D5 1.75M
LVL +10.20M

1.88M
3.24M 0.75M TOILET 0.75M 3.24M
TOILET
1.25M

1.25M
2M X 2.50M 2M X 2.50M
UP

2.50M
2.50M

2.45M
2.45M
LVL +10.40M
LVL +10.40M

0.30M
0.30x0.68
0.30x0.68
2.00M

2.00M
4.85M

4.85M
6.10M

6.10M
2.00M 2.00M LVL +10.20M
LVL +10.20M
LVL +10.20M

19.46M
W2
4.50M

4.50M
0.23x0.53

10.00M
9.44M
BEDROOM BEDROOM BEDROOM BEDROOM
4.07M X 4.50M 3.89M X 6.1M 3.89M X 6.1M 4.07M X 4.50M TABLE TENNIS
0.87M

0.87M
WAITING LOUNGE 6.23M X 10M
LVL +10.20M
LVL +10.20M
D4 D4 D4 D4
LVL +10.10M
0.38M

0.38M
2.99M 1.00M 1.00M 2.89M 2.89M 1.00M 1.00M 2.99M 2.96M

19.46M
1.76M 70.23M
C44 WOODEN RAFTERS

1.80M
1.80M
2.00M

2.73M

W2 PASSAGE LVL +10.20M PASSAGE 3.70M


CRICKET NET PRACTICE PITCHES

0.30M

0.30M
0.92M 2.01M 0.77M
WOODEN RAFTERS

1.80M

1.80M
LIFT
LD

1.20M
2.99M 2.99M 1.40M X 1.80M

1.88M
1.00M 1.00M
0.38M

1.80M
1.00M 2.89M 2.89M 1.00M

1.02M
LVL +10.10M
PROVISION FOR OPEN COURT
D4 D4 D4 D4 6.23M
0.87M

10.34M

0.35M
2.01M

60.44M
HEIGHT TO BE TAKEN TENNIS COURT FOR DOUBLES

LIVING ROOM
2.00M

4.50M
4.07M X 4.50M LIVING ROOM AS PER SECTION

SWIMMING POOL
4.85M

4.85M

6.10M
W2
6.10M

2.00M 2.00M 4.07M X 4.50M W2


LVL +10.20M

LVL +10.20M

HEIGHT TO BE TAKEN AS
2.45M

2.50M

2.45M
BEDROOM
2.50M

TOILET TOILET BEDROOM O.T.S. O.T.S.


1.25M

3.89M X 6.1M 2M X 2.50M 2M X 2.50M 3.89M X 6.1M


PER SECTION
TENNIS COURT FOR DOUBLES
LVL +10.40M
LVL +10.40M
LVL +10.20M
2.99M 1.00M LVL +10.20M 1.00M 3.00M 55.12M

126.57M
1.50M 0.88M 0.88M 1.50M JOGGING TRACK
D4 2.46M
0.32M

0.32M
0.75M

0.75M

D4 BABY POOL
1.08M

D5 D5
1.45M

1.45M

0.93M
0.60M

0.60M

0.93M
BALCONY 0.15M
V V 0.15M BALCONY 4.10M
0.37M

0.37M
1.53M
0.28M

0.28M

2.35M 0.95M 2.00M 0.80M 1.12M 0.80M 2.00M 0.95M 2.35M 3.95M 3.91M 3.99M
GYMNASIUM FOR 50 PEOPLES

W2 W2 DUMMY JALI WORK

jali work jali work

9m
K
ING TRAC

w
HALL

JOGGING TRACK
65 SQ.MT

i
JOGG
SLEEVE TO HIDE SLEEVE TO HIDE

d
66.31M
d
water body water body

RAIN WATER PIPE RAIN WATER PIPE

e
a

r
o
0.60M 0.60M

o
0.23 x 0.53

0.30M

0.30M

r
0.45M 0.45M PARTY LAWN

0.23M

0.23M

a
1.50M 0.90M

d
d i
w
WATERFALL WITH RAINFALL

9m
JOGGING TRACK
SKY SITTING WITH ARTIFICIAL JOGGING TRACK
FOUNTAIN

LAWN

4.20M
4.20M

4.20M
VISITORS PARKING VISITORS PARKING

SLAB BELOW

C1 C2 C3 C4

7.70M 7.70M

SITE PLAN
SCALE-1:1500

SECOND FLOOR PLAN

1.58M

0.30M
GUTTER OFFICERS CLUB
D:\officers club\RESTAURANT\New Final a.png

SLEEVE TO HIDE
(PRESIDENT; HON.
SLEEVE TO HIDE SLEEVE TO HIDE SLEEVE TO HIDE
RAIN WATER PIPE
RAIN WATER PIPE RAIN WATER PIPE RAIN WATER PIPE COLLECTOR,LATUR DISTRICT)
0.68M 0.68M 0.68M 0.68M
0.60M

0.60M

0.60M

0.60M
0.22M 0.22M 0.22M 0.22M
0.37M

0.37M

0.37M

0.37M
TITLE
0.37M

0.37M

0.23x0.53

LVL +14.70M
D4 D4
LVL +14.70M

OF THE PROPOSED OFFICERS CLUB, LATUR


LVL +14.55M

PROJECT

SLOPE
DN
0.30x0.68 0.30x0.68

LVL +16.13M
DRAWN DD CHECKED : KK
LVL +14.70M

DATE:
0.23x0.53

LVL +14.70M RIDGE LINE


SCALE
TO BE COVERED BY POLYCORBONATE SHEET

1.76M
C44

SLOPE
SLOPE
1.80M
1.80M

consultants
3.70M

D4 MACHINE ROOM
3.70M x 1.80M
Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,
Latur-413512,Maharashtra.
TO BE COVERED BY POLYCORBONATE SHEET
Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in

SLAB BELOW
LVL +13.20M ARCHITECTS:
OPEN TO SKY TO BE
COVERED BY POLYCORBONATE SHEET
OPEN TO SKY TO BE
COVERED BY POLYCORBONATE SHEET
KRISHNAKUMAR BANGAD
GUTTER
FIIA, COA, FIV, IIID
2.46M

CA/2004/32977

0.93M
DOME TO BE TAKEN
AS PER ELEVATION

SLEEVE TO HIDE SLEEVE TO HIDE


RAIN WATER PIPE RAIN WATER PIPE

0.60M 0.60M
0.30M

0.30M

0.45M 0.45M
0.23M

0.23M

THIS IS A PRESENTATION DRAWING IT MAY BE MODIFIED DURING EXECUTION


BUILDING TYPE-
SHEET NO:
MAIN BUILDING

ELEVATIONS-1

TITLE: WORKING DRAWING

SPECIFICATIONS:

70.23M

CRICKET NET PRACTICE PITCHES

PROVISION FOR OPEN COURT

60.44M
TENNIS COURT FOR DOUBLES

SWIMMING POOL
TENNIS COURT FOR DOUBLES

55.12M

126.57M
JOGGING TRACK

BABY POOL

GYMNASIUM FOR 50 PEOPLES

9m
TRACK

w
HALL

JOGGING TRACK
65 SQ.MT

JOGGING

i
d

66.31M

d
water body water body

e
o

r
r

o
PARTY LAWN

a
d

d
i
w
9m
JOGGING TRACK JOGGING TRACK
FOUNTAIN

VISITORS PARKING VISITORS PARKING

SITE PLAN
SCALE-1:1500

OFFICERS CLUB
(PRESIDENT; HON.
GI sheet roofing on the badminton hall
COLLECTOR,LATUR DISTRICT)
+ 17.70M HEADROOM LVL

+ 16.13M COURT SLAB LVL TITLE


OF THE PROPOSED OFFICERS CLUB, LATUR
+ 15.20 M PARAPET LVL
+ 14.70 M THIRD SLAB LVL
PROJECT
LVL +1.00M LVL +1.00M
LVL +1.00M

+ 13.20 M HALL SECOND SLAB LVL


DRAWN DD CHECKED : KK
LVL +0.45M LVL +0.45M LVL +0.45M LVL +0.45M

2"X 5MM THK


lines represented
4.50

RECTANGULAR MS
for curvature of column PATTI LVL +2.75M

false 1OX 10 MM THK


RECTANGULAR MS BAR false LVL +2.75M
2"X 5MM THK
RECTANGULAR MS

DATE:
PATTI

window window window 1OX 10 MM THK


RECTANGULAR MS BAR
window
SCALE
W2 W2
8.10

+ 10.20 M SECOND SLAB LVL


7.02

LVL +0.00M LVL +0.00M

line of cladding at the corner greek coumn LVL +0.00M LVL +0.00M LVL +0.00M LVL +0.00M LVL +0.00M LVL +0.00M LVL +0.00M LVL +0.00M LVL +0.00M LVL +0.00M LVL +0.15M

LVL +0.30M LVL +0.15M LVL +0.30M LVL +0.30M LVL +0.15M LVL +0.30M
greek coumn design to be generated
design to be generated at the corner edge
LVL +0.45M
LVL +0.45M
LVL +0.45M LVL +0.45M
lines represented
for curvature of column
LVL +0.45M at the corner edge this column has space
to get itself developed nicely consultants
4.50

false false
window window false +7.20M HALL FIRST SLAB LVL
lines represented window window window window window window
for curvature of column
LVL +0.30M LVL +0.30M
window LVL +0.30M

W2 W2 W2 W2 W2 W2 W2

+ 5.70M FIRST SLAB LVL


LVL +0.45M LVL +0.45M LVL +0.45M LVL +0.45M
Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,
LVL +0.45M LVL +0.45M LVL +0.45M LVL +0.45M LVL +0.45M
Latur-413512,Maharashtra.
Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in
Wall projected 0.3 m to have an
offset generated in the elevation
cladded with white texture paint
ARCHITECTS:
4.50

KRISHNAKUMAR BANGAD

0.30
+ 1.20M PLINTH LVL
FIIA, COA, FIV, IIID
+ 0.90M GROUND LVL
CA/2004/32977

ELEVATION AT D
SCALE-1:200

THIS IS A PRESENTATION DRAWING IT MAY BE MODIFIED DURING EXECUTION


BUILDING TYPE-
SHEET NO:
MAIN BUILDING

ELEVATIONS-2

TITLE: WORKING DRAWING

SPECIFICATIONS:
+ 17.70M HEADROOM LVL

+ 16.13M COURT SLAB LVL


ISMC100 ISMC100
+ 15.20 M PARAPET LVL
LVL +1.00M
+ 14.70 M THIRD SLAB LVL

+ 13.20 M HALL SECOND SLAB LVL ISMC 100 + ISA 40x5


LVL +0.45M LVL +0.45M LVL +0.45M
4.50

false false false


V window window window
W2 W2 W2

+ 10.20 M SECOND SLAB LVL


LVL -20.75 M LVL -1.57 M LVL +0.00M
LVL - 1.57M LVL - 25.89M LVL - 25.89M LVL - 26.89M

LVL +0.30M LVL +0.30M LVL +0.30M


4.50

70.23M

false false +7.20M HALL FIRST SLAB LVL


false
window window
LVL -20.86 M
V window LVL - 1.57M

W2 W2 W2
CRICKET NET PRACTICE PITCHES
LVL +0.45M LVL +0.45M LVL +0.45M

+ 5.70M FIRST SLAB LVL


lines represented LVL -20.75 M
for curvature of column

LVL -20.47 M PROVISION FOR OPEN COURT

60.44M
4.50

fixed toughned glass TENNIS COURT FOR DOUBLES

LVL -21.07 M LVL -21.07 M

SWIMMING POOL
+ 1.20M PLINTH LVL
1.20

0.23x0.53

0.23x0.53
+ 0.00M GROUND LVL TENNIS COURT FOR DOUBLES

1.88M 1.88M
55.12M

126.57M
0.30M

0.30M

0.30M
JOGGING TRACK

BABY POOL

19.46M

GYMNASIUM FOR 50 PEOPLES

ELEVATION C

3.99M

9m
TRACK
3.99M

w
HALL

JOGGING TRACK
65 SQ.MT

JOGGING
SCALE-1:200

i
d

66.31M

d
water body water body

e
o

r
r

o
PARTY LAWN

e
0.30M

a
d

d
i
w
9m
JOGGING TRACK JOGGING TRACK
FOUNTAIN

VISITORS PARKING VISITORS PARKING

3.91M

3.91M
0.30M

1.58M

HEIGHT TO BE TAKEN
SITE PLAN

0.30M
SCALE-1:1500

AS PER SECTION
3.50M

4.10M
0.30M

DUMMY JALI WORK


1.53M

jali work
3.69M
0.93M

2.46M
+ 17.70M HEADROOM LVL

+ 16.13M COURT SLAB LVL


OFFICERS CLUB

0.30M
+ 15.20 M PARAPET LVL 0.93M (PRESIDENT; HON.
LVL +1.00M
+ 14.70 M THIRD SLAB LVL
COLLECTOR,LATUR DISTRICT)

2.68M
+ 13.20 M HALL SECOND SLAB LVL

TITLE
4.50

0.30M
OF THE PROPOSED OFFICERS CLUB, LATUR
+ 10.20 M SECOND SLAB LVL PROJECT
8.10

8.10

LVL +0.00M LVL +0.00M

3.95M
DD

3.95M
DRAWN CHECKED : KK
4.50

+7.20M HALL FIRST SLAB LVL SCALE DATE:


19.46M

+ 5.70M FIRST SLAB LVL 0.30M 3.63M


10.80

LVL +0.75M LVL +0.75M


consultants
4.50

TABLE TENNIS
6.23M X 10M
5.70

5.70

V1

6.23M
Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,

6.23M
+ 1.20M PLINTH LVL Latur-413512,Maharashtra.
Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in
1.20

+ 0.00M GROUND LVL


ARCHITECTS:
KRISHNAKUMAR BANGAD

ELEVATION B FIIA, COA, FIV, IIID


CA/2004/32977
SCALE-1:200

THIS IS A PRESENTATION DRAWING IT MAY BE MODIFIED DURING EXECUTION


BUILDING TYPE-
SHEET NO:
MAIN BUILDING

SECTIONS

TITLE: WORKING DRAWING

SPECIFICATIONS:

GI sheet roofing on the badminton hall + 17.70M HEADROOM LVL

2.50
+ 16.13M COURT SLAB LVL
3.00

+ 15.20 M PARAPET LVL


+ 14.70 M THIRD SLAB LVL

+ 13.20 M HALL SECOND SLAB LVL


LIVING ROOM BEDROOM TOILET TOILET BEDROOM LIVING ROOM
4.50

BADMINTON COURT

9.50
+ 10.20 M SECOND SLAB LVL
70.23M

HALL

COURTYARD
CRICKET NET PRACTICE PITCHES
LIVING ROOM BEDROOM TOILET TOILET BEDROOM LIVING ROOM COURTYARD
4.50

+7.20M HALL FIRST SLAB LVL


PROVISION FOR OPEN COURT
0.45

+ 5.70M FIRST SLAB LVL

60.44M
8.85

8.85
TENNIS COURT FOR DOUBLES

SWIMMING POOL
4.50

GYMNASIUM FOR 50 PEOPLES MEETING ROOM / LIBRARY HALL CONFERENCE ROOM TOILET STEAM BATH MALE MASSAGE
ROOM
FEMALE MASSAGE
ROOM
SAUNA

7.20M
TENNIS COURT FOR DOUBLES

55.12M

126.57M
JOGGING TRACK
+ 1.20M PLINTH LVL BABY POOL
1.20

+ 0.00M GROUND LVL


GYMNASIUM FOR 50 PEOPLES

9m
TRACK

w
HALL

JOGGING TRACK
65 SQ.MT

JOGGING

i
d

66.31M

d
water body water body

e
SCALE-1:200

r
r

o
PARTY LAWN

a
d

d
i
w
9m
JOGGING TRACK JOGGING TRACK
FOUNTAIN

VISITORS PARKING VISITORS PARKING

SITE PLAN
SCALE-1:1500

+ 17.70M HEADROOM LVL

+ 16.13M COURT SLAB LVL

5.09M
+ 15.20 M PARAPET LVL

2.90M
1.00M

+ 14.70 M THIRD SLAB LVL OFFICERS CLUB


(PRESIDENT; HON.
COLLECTOR,LATUR DISTRICT)

1.00M
1.00M
+ 13.20 M HALL SECOND SLAB LVL

TITLE

3.40
OF THE PROPOSED OFFICERS CLUB, LATUR

9.60M
ELEVATION + 10.20 M SECOND SLAB LVL
PROJECT

6.00M
DRAWN DD CHECKED : KK
A DATE:
SCALE

+7.20M HALL FIRST SLAB LVL


SLAB BELOW
LVL +12.00M

consultants
+ 5.70M FIRST SLAB LVL

8.75
Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,
6.00M

Latur-413512,Maharashtra.
Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in

ARCHITECTS:
DOME TO BE TAKEN
AS PER ELEVATION KRISHNAKUMAR BANGAD
+ 1.20M PLINTH LVL
SLEEVE TO HIDE
RAIN WATER PIPE
SLEEVE TO HIDE
RAIN WATER PIPE
FIIA, COA, FIV, IIID
+ 0.00M GROUND LVL
0.60M 0.60M CA/2004/32977
0.30M

0.30M
0.23M

0.23M

0.45M 0.45M

PLAN SECTION AA

THIS IS A PRESENTATION DRAWING IT MAY BE MODIFIED DURING EXECUTION


0.07M BUILDING TYPE-
0.08M
SHEET NO:
0.20M
0.53M
0.20M
0.12M

CIRCLES WITH
0.07M MAIN BUILDING
0.27M 0.08M
30MM DISTANCE
0.39M 0.39M
0.63M
0.07M 0.12M
0.71M
0.20M 0.20M
0.53M ELEVATION DETAIL
0.27M
+ 17.70M HEADROOM LVL + 17.70M HEADROOM LVL 0.39M 0.39M
0.63M
0.07M TITLE: WORKING DRAWING
0.71M
+ 16.13M COURT SLAB LVL + 16.13M COURT SLAB LVL
CIRCLES WITH SPECIFICATIONS:
+ 15.20 M PARAPET LVL + 15.20 M PARAPET LVL 30MM DISTANCE
D
+ 14.70 M THIRD SLAB LVL + 14.70 M THIRD SLAB LVL
1.00M 1.00M

+ 13.20 M HALL SECOND SLAB LVL + 13.20 M HALL SECOND SLAB LVL

+ 10.20 M SECOND SLAB LVL + 10.20 M SECOND SLAB LVL

7.64M
PLINTH PROTECTION PLINTH PROTECTION

C78 C79 C80 C81

W4 W3 D2

D4

+7.20M HALL FIRST SLAB LVL +7.20M HALL FIRST SLAB LVL SLEEVE TO HIDE
RAIN WATER PIPE
SLEEVE TO HIDE
RAIN WATER PIPE
C66
SLEEVE TO HIDE
RAIN WATER PIPE
PASSAGE
SLEEVE TO HIDE
RAIN WATER PIPE
WAITING LOUNGE
D4

C59A
D5

V1

RECEPTION
D5 D5
D4

V V
D4

UP LOBBY V V

GYMNASIUM FOR 50 PEOPLES D3


D1

D1 D5 D5

D4 D2 D2

D2 PASSAGE
BILLARD ROOM D3
PRESIDENT CABIN D5
6.15M X 6M 4.26 M X 6 M

+ 5.70M FIRST SLAB LVL + 5.70M FIRST SLAB LVL LD


ADMIN. OFFICE
6.4 M X 6 M
BACK OFFICE
5MX6M PEDICURE
AND MANICURE
3.47 M x 3.85 M
PASSAGE
6.15M x 3.85M
SPA
D4
TOILET

1.98 M x 3.85M

D4
D5 D4

D4 D1
TOILET PASSAGE
2MX4M D4 D4
RECEPTION D4 D4

MEETING ROOM / LIBRARY COURTYARD COURTYARD


8.1M X 5M 4.9M X 5M
CONFERENCE ROOM
D1 D1
HALL D1 4.9M X 5M D1
7M X 5M STEAM BATH
MALE MASSAGE FEMALE MASSAGE
ROOM
SAUNA
ROOM
65 SQ.MT V
4M x 3.37M
2.7 M x 3.37 M 2.7 M x 3.37 M
4M x 3.37M

C23

W1 W1 W1 W1

SIT OUT SIT OUT

C6 C7

water body water body

SKY SITTING WITH ARTIFICIAL MD WATERFALL WITH RAINFALL


LAWN

C3

C1 C4

UP

FRONT YARD

PLINTH PROTECTION PLINTH PROTECTION

0.03M

0.64M
KEY PLAN
+ 1.20M PLINTH LVL + 1.20M PLINTH LVL 0.71M
0.19M

SCALE-1:750
0.68M 0.03M

0.03M

+ 0.00M GROUND LVL + 0.00M GROUND LVL 0.03M

0.18M

0.03M

0.19M
0.98M
0.03M
0.03M
0.03M

0.18M

+ 17.70M HEADROOM LVL

+ 16.13M COURT SLAB LVL

+ 15.20 M PARAPET LVL


+ 14.70 M THIRD SLAB LVL
OFFICERS CLUB
(PRESIDENT; HON.
+ 13.20 M HALL SECOND SLAB LVL COLLECTOR,LATUR DISTRICT)

TITLE
OF THE PROPOSED OFFICERS CLUB, LATUR
false false false
window window window 0.12M
PROJECT
0.12M

DRAWN CHECKED : KK
0.20M

+ 10.20 M SECOND SLAB LVL


0.16M

0.30M SCALE DATE:


0.16M 0.12M 0.12M 0.13M

false +7.20M HALL FIRST SLAB LVL consultants


false false
window window
window
Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,
+ 5.70M FIRST SLAB LVL Latur-413512,Maharashtra.
Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in
lines represented
for curvature of column

MOLDINGS IN ARCHITECTS:
PLAIN CEMENT KRISHNAKUMAR BANGAD
FIIA, COA, FIV, IIID
0.12M
CA/2004/32977
0.12M
+ 1.20M PLINTH LVL
0.19M

+ 0.00M GROUND LVL


SLAB 0.27M

0.15M

ELEVATION C DETAIL AT 'D' THIS IS A PRESENTATION DRAWING IT MAY BE MODIFIED DURING EXECUTION
BUILDING TYPE-
SHEET NO:
MAIN BUILDING
ROOF FLOOR BEAM SCHEDULE
EXTRA STIRRUPS ROOF FLOOR BEAM SCHEDULE ROOF FLOOR PLAN
STIRRUPS
BEAM MKD. SIZE BOTT. REIN TOP REIN @CONT. BOTH END REMARK
(L/3 from support)
BALANCE
SUPP. TITLE: SLAB & BEAM SCHEDULE DETAILS
EXTRA STIRRUPS STIRRUPSB
B1,2,3,70,71,72 230X450 2-T16 2-T16 -------- T8@200c/c T8@200c/c as per slop
BEAM MKD. SIZE BOTT. REIN TOP REIN @CONT. BOTH END REMARK SPECIFICATIONS:
B6,7,8,67,68,69 T8@200c/c T8@200c/c as per slop ALANCE
230X450 2-T16 2-T16 -------- SUPP. (L/3 from support)

B9,10,11,12,13,15,16 B85 300X530 2-T16 2-T12 -------- T8@150c/c T8@200c/c --------


B17,18,19,20,35,60,61,62 230X530 2-T16 2-T12 2-T16 T8@150c/c T8@200c/c -------- B87,89,98,101 300X675 6-T25 2-T20+2-T16 2-T25 T8@100c/c T8@150c/c 2-T12@EFOB

B75,76,77,78,79 B88,90,99,102 300X675 2-T25 2-T20 -------- T8@150c/c T8@200c/c --------


B12 300X530 2-T20 2-T12 -------- T8@150c/c T8@200c/c -------- B91,92,95,96 150X530 2-T16 2-T12 -------- T8@200c/c T8@200c/c --------
B14,21,80 230X530 2-T16 2-T12 -------- T8@150c/c T8@200c/c -------- B107,126 300X600 2-T25 2-T20 2-T20 T8@100c/c T8@150c/c --------
B22,24,26,32,38,39,40,41 B108,127 300X600 4-T25 2-T20 -------- T8@100c/c T8@150c/c --------
230X530 3-T16 2-T12 -------- T8@150c/c T8@200c/c -------- B109,110 300X530 2-T20+1-T16 2-T16 -------- T8@150c/c T8@200c/c --------
B42,43,44,45,46,52
B23,56 T8@200c/c T8@200c/c B111,112,B123,124 REFER PROFILE
230X530 2-T16+1-T12 2-T12 -------- --------
B113,120 300X530 4-T20 2-T20 2-T20 T8@100c/c T8@150c/c --------
B29 300X530 3-T16 2-T12 2-T20 T8@150c/c T8@200c/c --------
B114,121 300X600 4-T25 2-T20 -------- T8@100c/c T8@150c/c --------
B30,106,125 300X530 2-T20+1-T16 2-T12 2-T20 T8@150c/c T8@200c/c --------
B117 300X530 2-T20 2-T16 -------- T8@150c/c T8@150c/c --------
B30A 300X530 2-T20 2-T12 2-T20 T8@150c/c T8@150c/c --------
B118 300X530 4-T20 2-T16 2-T25 T8@150c/c T8@200c/c --------
B31 300X530 2-T20 2-T12 2-T20 T8@200c/c T8@200c/c -------- B119 300X530 2-T20 2-T16 -------- T8@150c/c T8@200c/c --------
B47,63 230X530 3-T16 2-T12 2-T20 T8@150c/c T8@200c/c -------- B128 300X530 2-T20 2-T20 -------- T8@150c/c T8@200c/c --------
B48,49,50,51 300X530 2-T20+2-T25 2-T16 -------- T8@100c/c T8@150c/c -------- B129,130,131 230X530 3-T16 2-T12 2-T16 T8@150c/c T8@200c/c --------
B54,55,57 230X530 3-T16 2-T12 -------- T8@150c/c T8@200c/c -------- B132 230X530 3-T16 2-T12 -------- T8@150c/c T8@200c/c --------
B58,58A 230X530 2-T20 2-T20 -------- T8@150c/c T8@200c/c -------- SECOND FLOOR
SECOND SLABSLAB
FLOOR SCHEDULE
SCHEDULE
B64 300X675 2-T25+2-T20 2-T20 2-T25 T8@100c/c T8@150c/c 2-T12@EFOB SLAB SHORT SPAN LONG SPAIN
THK. DIST.REIN. REMARK
T8@100c/c T8@150c/c MKD REIN. REIN
B65 300X675 4-T25+2-T20 2-T16+2-T20 2-T25 2-T12@EFOB
T10@150c/c
B66 300X675 2-T25+2-T20 2-T20 -------- T8@100c/c T8@150c/c 2-T12@EFOB T10@120C/C
S1 125 T8@200C/C T8@200C/C ONE WAY
ALT BENT
B59 230X230 2-T12 2-T12 2-T16 T8@150c/c T8@150c/c -------- T10@150C/C 100 THK.
S2 125 T8@200C/C T8@200C/C ONE WAY
B81,83 300X530 2-T16 2-T12 2-T16 T8@200c/c T8@200c/c -------- ALT BENT
T10@230C/
B82,84 300X530 3-T16 2-T12 2-T16 T8@150c/c T8@200c/c -------- T10@170C/C T8@200c/c
S3 125 C ALT T8@200C/C TWO WAY
ALT BENT
BENT B15/128
B131
T10@200C/C
S4 125 T8@200C/C T8@200C/C ONE WAY
ALT BENT
T8@200C/C
S5 125 T8@200C/C T8@200C/C ONE WAY B15/128
ALT BENT T8@200c/c
B131
T8@200C/C T10@150c/c STRUCTURAL CONSULTANT
ONE WAY
S6 125 ALT BENT T8@200C/C T8@200C/C
CANT SECTION-CC SANJAY JATHADE M.TECH.(STR)
BACK 'ROYAL PLAZA'COMPLEX F.FLOOR,S.NO.12,MURARGI PETH
C5/C7A C14/C14 C28/C31 BEHIND BHAGWAT PETROL PUMP.SOLAPUR-413001
2-T12 2-T16 2-T12 T10@150c/c CELL.9423589358 Email-sanjay_ jathade@rediffmail.com

1.22 1.50
100 THK.
75 THK. OFFICERS CLUB
2-T16 2-T16 1-T16 D:\officers club\RESTAURANT\New Final a.png

(PRESIDENT; HON.
75 THK.
BACK B111/123(300X530) B112/124(300X530) T8@200c/c T8@200c/c COLLECTOR,LATUR DISTRICT)
T8@200c/c T8@200c/c T8@150c/c
TITLE
125 THK.
OF THE PROPOSED OFFICERS CLUB, LATUR
PROJECT
T10@150c/c T8@200c/c
B19/77 DRAWN DD CHECKED : KK
SCALE DATE:
SECTION-AA
TRU
SS-1

consultants
Gutter

Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,


COLUMN Latur-413512,Maharashtra.
STIRRUPS Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in

3-T20
ARCHITECTS:
KRISHNAKUMAR BANGAD

4'0"
FIIA, COA, FIV, IIID
CA/2004/32977
'BK1' DETAILS
T8@200c/c

T10@150c/c

100 THK.
BRICK WORK
T8@200c/c

B10/83 T8@200c/c THIS IS A PRESENTATION DRAWING IT MAY BE MODIFIED DURING EXECUTION


B62
T10@150c/c

SECTION-BB
BUILDING TYPE-
SHEET NO:
MAIN BUILDING

GROUND FLOOR & FIRST FLOOR PLAN

TITLE: LIFT DETAILS

SPECIFICATIONS:

MACHINE ROOM 70.23M

CRICKET NET PRACTICE PITCHES

HOIST WAY DEPTH=2200


PROVISION FOR OPEN COURT

60.44M
TENNIS COURT FOR DOUBLES

SWIMMING POOL
TENNIS COURT FOR DOUBLES

55.12M

126.57M
JOGGING TRACK

BABY POOL

GYMNASIUM FOR 50 PEOPLES

9m
TRACK

w
JOGGING TRACK
HALL
65 SQ.MT

JOGGING

i
d

66.31M

d
water body water body

e
o

r
r

o
PARTY LAWN

a
d

d
i
w
9m
JOGGING TRACK JOGGING TRACK
FOUNTAIN

VISITORS PARKING VISITORS PARKING

SITE PLAN

MACHINE ROOM
SITE PLAN
SCALE-1:1500
+9.20 SECOND SLAB LEVEL

ANTI-FUNGAL
PAINT

2000

N N'
OFFICERS CLUB
(PRESIDENT; HON.
COLLECTOR,LATUR DISTRICT)
+5.20 FIRST SLAB LEVEL
TITLE
OF THE PROPOSED OFFICERS CLUB, LATUR

200
195 273
CAR DEPTH=1532
PROJECT

HOIST WAY DEPTH=1200


200
600 300 DRAWN CHECKED : KK
ANTI-FUNGAL ANTI-FUNGAL
PAINT PAINT

SCALE DATE:

consultants

200 200
HOIST WAY DEPTH=1200 600 300

Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,


Latur-413512,Maharashtra.
Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in

ARCHITECTS:
+ 1.2 PLINTH LEVEL KRISHNAKUMAR BANGAD
N N' FIIA, COA, FIV, IIID
INSPECTION
CA/2004/32977
OUTLET

+0.90 FOOTING LEVEL

LIFT PLAN SECTION AT N-N'


THIS IS A PRESENTATION DRAWING IT MAY BE MODIFIED DURING EXECUTION
MANHOLE WITH
M.S. COVER
600MMX600MM BUILDING TYPE-
SHEET NO:
MAIN BUILDING
FINISHED PLASTER 0.20MM THK
RCC WATER TANK FOR LEVEL GRANITE FOR TREAD
GENERAL USE BRICK WALL STAIRCASE DETAILS-2
19,000 LTR. CAPACITY CAGE LADDER

GRANITE
SKIRTING FLUSHED WITH THE WALL TITLE: WORKING DRAWING

+15300 GRANITE 0.30M SPECIFICATIONS:


FLOORING
40MM MORTOR

40MM MORTOR

12 MM THICK 20 MM THK.
INTERNAL PLASTER GRANITE
150 MM THK.RCC SLAB FOR LANDING,RISER
0.15M THK
WAIST SLAB
RCC BEAM

TREAD=300MM
RISER=173MM
78
TERRACE SLAB +14.55M
THE FIXING DETAIL
DETAIL OF SKIRTING
77
76
75
74
73
72
MANHOLE WITH
71 M.S. COVER PLINTH PROTECTION PLINTH PROTECTION

600MMX600MM
C78 C79 C80 C81

70
W4 W3 D2

69 D4

WAITING LOUNGE
68 SLEEVE TO HIDE
RAIN WATER PIPE
SLEEVE TO HIDE
RAIN WATER PIPE
SLEEVE TO HIDE
RAIN WATER PIPE
PASSAGE
SLEEVE TO HIDE
RAIN WATER PIPE
D4
D5

C66 C59A
V1

67

RECEPTION
D5 D5
D4

MIDLANDING+12.45 M
66 D4
V
V V

65 UP LOBBY V V

GYMNASIUM FOR 50 PEOPLES D3


D1

D1 D5 D5

64 D4 D2 D2

PASSAGE

RCC WATER TANK FOR


D2

63 BILLARD ROOM
6.15M X 6M
D3 PRESIDENT CABIN
4.26 M X 6 M
D5

62 ADMIN. OFFICE BACK OFFICE

GENERAL USE
TOILET

6.4 M X 6 M 5MX6M
61 PEDICURE
AND MANICURE
3.47 M x 3.85 M
PASSAGE
6.15M x 3.85M
SPA
D4

1.98 M x 3.85M

LD

60
59 19,000 LTR. CAPACITY CAGE LADDER D4
TOILET
2MX4M
D5 D4
D1
PASSAGE
D4

D4
RECEPTION D4 D4 D4

58 MEETING ROOM / LIBRARY


8.1M X 5M D1
COURTYARD
4.9M X 5M D1
HALL D1
COURTYARD
4.9M X 5M D1
CONFERENCE ROOM
7M X 5M MALE MASSAGE FEMALE MASSAGE SAUNA
STEAM BATH ROOM ROOM

57 65 SQ.MT V
4M x 3.37M
2.7 M x 3.37 M 2.7 M x 3.37 M
4M x 3.37M

C23

56 W1 W1 W1 W1

55 SIT OUT SIT OUT

54
(+)0.30 FREE BOARD C6 C7

water body water body

53
SECOND SLAB +10.20 M 3.70 x 1.30 x 1.50 CLEAR DEPTH
TREAD=300MM
SKY SITTING WITH ARTIFICIAL MD WATERFALL WITH RAINFALL
LAWN

52 CAPACITY 7000 Ltr


RISER=173MM
C3

51
FLUSHING TANK
C1 C4

50 0.20M UP

49 FRONT YARD

PLINTH PROTECTION
PLINTH PROTECTION

48
47 +15300
46

KEY PLAN
45
44
43
42

MIDLANDING+7.95M
41
(+)0.30 FREE BOARD
SCALE-1:750
40
39 3.70 x 3.50 x 1.50 CLEAR DEPTH
38 CAPACITY 19000 Ltr
37
36 DOMESTIC TANK
35
34
33 0.05 M
32
31
30
29
28
27 FIRST SLAB +5.70 M
TREAD=300MM
26
RISER=173MM 0.30x0.68
25
24
0.30x0.68
23
22
21
20

18
19

TREAD=300MM
TERRACE SLAB +14.55M
NOISING DETAIL
LADDER

17
16 78
RISER=173MM
15 77
76
MANHOLE WITH

CAGE LADDER
WATER OUTLET

MIDLANDING+3.45 M 14
600MMX600MM

75

WATER INLET
13
M.S. COVER

12 74

FROM UGT
11 73
10
72
9
71
8
70
7
6 69
1.15M

5 68
4 67
3 MIDLANDING+12.45 M
66
2
1 +1.20M LVL

SECTIONAL ELEVATION OFFICERS CLUB


PLAN AT O.H.T. LVL (PRESIDENT; HON.
COLLECTOR,LATUR DISTRICT)

3.70M
TITLE
PROPOSED OFFICERS CLUB, LATUR

1.80M
OF THE

1.80M
PROJECT

1.76M DRAWN CHECKED : KK

0.30M

0.30M
SCALE DATE:

0.30M

0.30M
3.70M

0.30M

0.30M
3.70M 3.70M

0.30M

0.30M
1.80M

1.80M

1.80M
1.80M

LVL +7.95M
1.80M

LVL +3.45M
1.80M

0.30M

0.30M
LVL +12.45M consultants

0.30M

0.30M
0.30M

0.30M
1.76M 14

0.30M

0.30M
1.76M 1.76M Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,
Latur-413512,Maharashtra.
13
0.30M

0.30M

15
0.30M

0.30M

0.30M

0.30M
0.30M

0.30M

Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in


12
0.30M

0.30M

0.30M

0.30M
6.01M

0.30M

0.30M
0.30M

0.30M

16
11 0.30x0.68 ARCHITECTS:
0.30M

0.30M

6.01M

0.30M

0.30M

0.30M

0.30M
0.30M

0.30M

17 0.30x0.68
10 18
0.30M

0.30M

0.30M

0.30M

0.30M

0.30M
0.30M

0.30M

KRISHNAKUMAR BANGAD
9 19
0.30M

0.30M

0.30M

0.30M

0.30M
0.30M

0.30M

8 20 DN FIIA, COA, FIV, IIID


0.30M

0.30M

0.30M

0.30M

0.30M

0.30M

7
0.30M

0.30M

21 CA/2004/32977
0.30M

0.30M

0.30M

0.30M

6
0.30M

0.30M

22
0.30M

0.30M

0.30M

0.30M

LVL +14.55M
5
0.30M

0.30M

0.30M

0.30M

0.30M

0.30M

23
4
0.30M

0.30M

24
0.30M

0.30M

0.30M

0.30M

0.30x0.68 3 0.30x0.68 0.30x0.68


0.30M

0.30M

0.30x0.68
0.30M

0.30M

25 0.30x0.68
0.30M

0.30M

0.30x0.68
2 D4 D4
0.30M

0.30M

26
0.30M

0.30M

0.30M

0.30M

1
UP TREAD = 300MM
RISER = 173MM
UP TREAD = 300MM
RISER = 173MM
UP
LVL +1.20M LVL +5.70M LVL +10.20M

GROUND FLOOR PLAN FIRST FLOOR PLAN SECOND FLOOR PLAN TERRACE PLAN THIS IS A PRESENTATION DRAWING IT MAY BE MODIFIED DURING EXECUTION
BUILDING TYPE-
SHEET NO:
MAIN BUILDING

STAIRCASE DETAIL-1
45
44
43
TITLE: WORKING DRAWING
42
41
MIDLANDING+7.95M
40 SPECIFICATIONS:
39
38
37
MARBLE JOINT MARBLE 0.03M
36 RAILING
35 0.06M
34 0.02M
33 0.05M 0.05M
MARBLE 0.05M 0.20M 0.13M
32 0.16M
RAILING 0.17M 0.10M
31 0.17M
0.13M
30 0.16M 0.16M 0.05M 0.02M
29
28 0.17M 0.12M
27 FIRST SLAB +5.70 M 0.16M
0.09M 0.08M
TREAD=300MM 0.06M 0.12M
26 0.12M
0.17M
RISER=173MM 0.09M 0.10M
0.16M
25 0.12M
0.02M 0.05M
24 0.14M
0.16M
0.03M 0.02M 0.21M
0.12M
23 0.21M
0.08M 0.01M
0.02M0.16M 0.18M
22 0.18M
MARBLE
21 0.14M BALUSTER MARBLE
0.21M 0.16M 0.14M
20 0.20MM THK BALUSTER
0.18M
19 POLISHED MARBLE 0.02M
0.14M
18 FOR TREAD
0.02M PLINTH PROTECTION PLINTH PROTECTION

17 0.11M 1.15M
0.40M 0.06M C78 C79 C80 C81

16
0.02M
W4 W3 D2

0.14M 0.06M 0.40M UV RESISTANT D4

15 PASSAGE WAITING LOUNGE


D4
D5
SLEEVE TO HIDE SLEEVE TO HIDE

0.10M
SLEEVE TO HIDE SLEEVE TO HIDE

POLY ACRYLIC
RAIN WATER PIPE

0.08M
RAIN WATER PIPE RAIN WATER PIPE RAIN WATER PIPE
C66
C59A
V1

0.11M
UV RESISTANT

RECEPTION
D5 D5

MIDLANDING+3.45 M
D4

14 0.12M CEMENT D4
V V

POLY ACRYLIC
V

UP LOBBY V V

13 0.14M 0.10M GYMNASIUM FOR 50 PEOPLES D3


D1

D1 D5 D5

12 0.08M 0.02M 0.02M


CEMENT 0.06M D4 D2 D2

0.25M
D2 PASSAGE
BILLARD ROOM PRESIDENT CABIN
0.04M
D3
D5
6.15M X 6M
0.15M 4.26 M X 6 M

11 0.05M
0.10M
0.12M ADMIN. OFFICE BACK OFFICE TOILET

0.06M 0.11M 0.04M 6.4 M X 6 M 5MX6M


PEDICURE
AND MANICURE
D4

10
PASSAGE
3.47 M x 3.85 M 6.15M x 3.85M 1.98 M x 3.85M
SPA

0.02M LD

0.02M
0.08M D5 D4
D1
D4

9
D4
TOILET PASSAGE
2MX4M
0.13M
D4
RECEPTION D4 D4 D4

0.14M MEETING ROOM / LIBRARY


8.1M X 5M
COURTYARD
4.9M X 5M
COURTYARD CONFERENCE ROOM

FLOORING HALL
D1 D1 D1 4.9M X 5M D1
7M X 5M

8
MALE MASSAGE FEMALE MASSAGE SAUNA
STEAM BATH ROOM ROOM

0.12M 65 SQ.MT V
4M x 3.37M
2.7 M x 3.37 M 2.7 M x 3.37 M
4M x 3.37M

C23

7 12 MM THICK 20 MM THK. 0.08M W1 W1 W1 W1

SIT OUT SIT OUT

6 INTERNAL PLASTER POLISHED MARBLE 0.13M


PCC
1.15M

C6 C7

water body water body

5 FOR LANDING,RISER SKY SITTING WITH ARTIFICIAL


LAWN
MD WATERFALL WITH RAINFALL

0.15M THK C3

4 C1 C4

3 WAIST SLAB
WAIST SLAB 0.12M
UP

DETAIL AT 'A'
FRONT YARD

2 PLINTH PROTECTION PLINTH PROTECTION

1 +1.20M LVL DETAIL AT 'B'


KEY PLAN
SECTIONAL ELEVATION SCALE-1:750

3.70M 3.70M 3.70M 3.70M


1.80M

1.80M

1.80M

1.80M
1.80M

1.80M

LVL +7.95M

1.80M

1.80M
LVL +3.45M
LVL +12.45M

1.76M 14 1.76M 1.76M 1.76M OFFICERS CLUB


13 (PRESIDENT; HON.
0.30M

0.30M

15
0.30M

0.30M

0.30M

0.30M

0.30M

0.30M
12 COLLECTOR,LATUR DISTRICT)
0.30M

0.30M
6.01M

0.30M

0.30M

0.30M

0.30M
16

0.30M

0.30M
11
0.30M

0.30M

6.01M

0.30M

0.30M

0.30M

0.30M
17

0.30M

0.30M
TITLE
10 18 PROPOSED OFFICERS CLUB, LATUR
0.30M

0.30M

0.30M

0.30M

0.30M

0.30M

0.30M

0.30M
OF THE
9 19
0.30M

0.30M

0.30M

0.30M

0.30M

0.30M

0.30M

0.30M
PROJECT
8 20
0.30M

0.30M

0.30M

0.30M

0.30M

0.30M

0.30M

0.30M
7 DRAWN CHECKED : KK
0.30M

0.30M

21
0.30M

0.30M

0.30M

0.30M

0.30M

0.30M
6 22
0.30M

0.30M

0.30M

0.30M

0.30M

0.30M

0.30M

0.30M
SCALE DATE:
5
0.30M

0.30M

0.30M

0.30M

0.30M

0.30M
23

0.30M

0.30M
4
0.30M

0.30M

24
0.30M

0.30M

0.30M

0.30M

0.30M

0.30M
0.30x0.68 3 0.30x0.68 0.30x0.68 0.30x0.68
0.30M

0.30M

0.30x0.68
0.30M

0.30M

25 0.30x0.68
0.30M

0.30M

0.30x0.68

0.30M

0.30M
0.30x0.68
2 consultants
0.30M

0.30M

0.30M

0.30M

26
0.30M

0.30M

0.30M

0.30M
1
UP

0.30M
TREAD = 300MM
RISER = 173MM
UP TREAD = 300MM
RISER = 173MM
UP DN Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,
Latur-413512,Maharashtra.
LVL +5.70M LVL +10.20M Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in
LVL +1.20M

LVL +14.55M ARCHITECTS:


KRISHNAKUMAR BANGAD
FIIA, COA, FIV, IIID
D4 D4 CA/2004/32977

GROUND FLOOR PLAN FIRST FLOOR PLAN SECOND FLOOR PLAN TERRACE PLAN
THIS IS A PRESENTATION DRAWING IT MAY BE MODIFIED DURING EXECUTION
30 mm thk. BUILDING TYPE-
SHEET NO:
f. r. p. door hinge MAIN BUILDING
IN
DOOR DETAIL

ALUMINIUM
STOPPER ALDROP HANDLE
OUT TITLE: WORKING DRAWING
19 mm granite door
frame SPECIFICATIONS:

19 19
0.20 m. thk.
38 a.a.c. block wall

HINGES DETAIL AT-X


TOWER BOLT TADIPATTI

2.00
2.00M
R.C.C.
5.40

PLINTH PROTECTION PLINTH PROTECTION

C78 C79 C80 C81

TOWER C/L OF WALL PASSAGE


D4
W4

WAITING LOUNGE
W3 D2

D4
D5

BOLT
SLEEVE TO HIDE SLEEVE TO HIDE SLEEVE TO HIDE SLEEVE TO HIDE
RAIN WATER PIPE RAIN WATER PIPE RAIN WATER PIPE RAIN WATER PIPE
C66
C59A
V1

RECEPTION
D5 D5
D4

R.C.C.
0.75 RCC BEAM V V
D4
V

UP LOBBY V V

PLASTER GYMNASIUM FOR 50 PEOPLES D3


D1

DOOR
D1 D5 D5

D4 D2 D2

TOWER
D2 PASSAGE
BILLARD ROOM D3 PRESIDENT CABIN D5
6.15M X 6M 4.26 M X 6 M

FRAME FIXED GLASS


BOLT
ADMIN. OFFICE BACK OFFICE TOILET
6.4 M X 6 M 5MX6M
'A' 'A' PEDICURE
AND MANICURE
D4

0.30
PASSAGE
3.47 M x 3.85 M 6.15M x 3.85M 1.98 M x 3.85M
SPA

LD

D4
D5 D4
D1
D4
TOILET PASSAGE
2MX4M D4
D4 D4
RECEPTION D4

MEETING ROOM / LIBRARY

DOOR
COURTYARD COURTYARD CONFERENCE ROOM
8.1M X 5M 4.9M X 5M 4.9M X 5M
D1 D1
HALL D1 D1
7M X 5M MALE MASSAGE FEMALE MASSAGE

GRANITE
SAUNA
STEAM BATH ROOM ROOM

65 SQ.MT V
4M x 3.37M
2.7 M x 3.37 M 2.7 M x 3.37 M
4M x 3.37M

FRAME
FRAME
C23

W1 W1 W1 W1

SIT OUT SIT OUT

C6 C7

water body water body

SKY SITTING WITH ARTIFICIAL MD WATERFALL WITH RAINFALL


LAWN

C3

C1 C4

UP

FRONT YARD

PLINTH PROTECTION PLINTH PROTECTION

19 mm granite
door frame

2.40M
KEY PLAN
2.70

35MM THK SHUTTER OF SOLID


SCALE-1:750

2.40
CORE FINISHED WITH BOTH
OUTSIDE OUTSIDE SIDE 1.5MM THK.
LAMINATE AS APPROVED

2.10
GODREG LOCK WITH HANDLE
TADIPATTI TADIPATTI

ALDROP ALDROP
GRANITE DOOR FRAME
SOLID CORE FLUSH DOOR
SINGLE LEAF SHUTTER WITH
LAMINATE ON BOTH SIDE
STOPPER STOPPER

FINISHED FINISHED

OUTSIDE

INSIDE
FLOOR FLOOR SILL - 0.15 20MM TH. GRANITE STONE STRIP

LEVEL LEVEL
5MM CLEARANCE
F.F.L F.F.L
INSIDE

ELEVATION OF MD ELEVATION 30 mm thk.SECTION D'-D'


SECTION - Y Y SECTION - Y Y f. r. p. door
32MM THK. SOLID CORE 32MM THK. SOLID CORE hinge
FLUSH DOOR SHUTTER WITH VENEER FLUSH DOOR SHUTTER WITH VENEER 'D' X
INSIDE
INTERNAL INTERNAL INTERNAL

OUTSIDE 'D'
OFFICERS CLUB
EXTERNAL EXTERNAL
0.23 granite A.A.C. (PRESIDENT; HON.
2.00 BLOCK WALL COLLECTOR,LATUR DISTRICT)
SECTION AT AA' (DOOR MD) door frame
SINGLE SHUTTER FIBRE DOOR
SECTION AT AA' WITH GRANITE DOOR FRAME - D2 TITLE
2.00 LOCATION - D1( 2.00 X 2.40 M ) ALL DOOR ( 0.75 X 2.60M )
OF THE PROPOSED OFFICERS CLUB, LATUR
LOCATION - D5( 0.75 X 2.40 M ) ALL TOILET DOOR
LOCATION - MD ( 2.00 X 2.70 M ) MAIN DOOR D2( 1.57 X 2.40 M ) ALL DOOR PROJECT
D6( 0.60 X 2.40 M ) ALL TOILET DOOR
D3( 1.20 X 2.40 M ) ALL DOOR
DRAWN CHECKED : KK
D4( 1.00 X 2.40 M ) ALL DOOR
SCALE DATE:
S.NO NAME SIZE LINTEL SPECIFICATION HINGE TOWER BOLT TADIPATTI HANDLE ALDROP
LVL
SIX HINGES OF 0.150 0.30 M LONG HEAVY 0.30 M LONG 0.30 M LONG 0.45 M LONG
1 MD 2.00MX2.70M 2.70 TEAK WOOD DOOR FRAME IN PANELLING TYPE OF THK 0.04 M AS SHOWN IN DRG AND INSTALLED AT SITE WITH THE USE OF ANCHOR FASTERNER OF M HEAVY DUTY DUTY BRASS PLATED HEAVY DUTY HEAVY DUTY BRASS PLATED HEAVY DUTY
STRENGTH AS APPROVED CHROME PLATED TWO TOWER BRASS PLATED EXTERNAL BRASS PLATED
consultants
DOUBLE LEAF PANELLED DOOR SHUTTER WITH TEAK WOOD STYLES ,TOP RAIL AND INTERMEDIATE RAILS (IF REQUIRED)OF SIZE 100MMX40MM ,LOCK BOLT INTERNALLY INTERNALLY SIDE & INTERNAL EXTERNAL SIDE
AND BOTTOM RAILOF SIZE 200MM X40MM WITH INSERT PANELS OF 19MM THK BOTH SIDES WATER PROOF PLYWOOD WITH VENEER OF APPROVED SIDE BOTH
MAKE.WITH FIXTURES OF APPROVED MAKE
TEAK WOOD DOOR FRAME IN PANELLING TYPE OF THK 0.04 M AS SHOWN IN DRG AND INSTALLED AT SITE WITH THE USE OF ANCHOR FASTERNER OF SIX HINGES OF 0.150 0.30 M LONG HEAVY 0.30 M LONG 0.30 M LONG 0.45 M LONG Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,
1 D1 2.00MX2.40M 2.40 REQUIRED STRENGTH AS APPROVED M HEAVY DUTY DUTY BRASS PLATED HEAVY DUTY HEAVY DUTY BRASS PLATED HEAVY DUTY Latur-413512,Maharashtra.
DOUBLE LEAF PANELLED DOOR SHUTTER WITH TEAK WOOD STYLES ,TOP RAIL AND INTERMEDIATE RAILS (IF REQUIRED)OF SIZE 100MMX40MM ,LOCK CHROME PLATED TWO TOWER BRASS PLATED EXTERNAL BRASS PLATED Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in
AND BOTTOM RAILOF SIZE 200MM X40MM WITH INSERT PANELS OF 19MM THK BOTH SIDES WATER PROOF PLYWOOD WITH VENEER OF APPROVED BOLT INTERNALLY INTERNALLY SIDE & INTERNAL EXTERNAL SIDE
MAKE.WITH FIXTURES OF APPROVED MAKE SIDE BOTH
ARCHITECTS:
TEAK WOOD DOOR FRAME IN PANELLING TYPE OF THK 0.04 M AS SHOWN IN DRG AND INSTALLED AT SITE WITH THE USE OF ANCHOR FASTERNER OF SIX HINGES OF 0.150 0.30 M LONG HEAVY 0.30 M LONG 0.30 M LONG 0.45 M LONG
1 D2 1.57MX2.40M 2.40 REQUIRED STRENGTH AS APPROVED M HEAVY DUTY DUTY BRASS PLATED HEAVY DUTY HEAVY DUTY BRASS PLATED HEAVY DUTY KRISHNAKUMAR BANGAD
DOUBLE LEAF PANELLED DOOR SHUTTER WITH TEAK WOOD STYLES ,TOP RAIL AND INTERMEDIATE RAILS (IF REQUIRED)OF SIZE 100MMX40MM ,LOCK CHROME PLATED TWO TOWER BRASS PLATED EXTERNAL BRASS PLATED
AND BOTTOM RAILOF SIZE 200MM X40MM WITH INSERT PANELS OF 19MM THK BOTH SIDES WATER PROOF PLYWOOD WITH VENEER OF APPROVED BOLT INTERNALLY INTERNALLY SIDE & INTERNAL EXTERNAL SIDE FIIA, COA, FIV, IIID
MAKE.WITH FIXTURES OF APPROVED MAKE SIDE BOTH
CA/2004/32977
TEAK WOOD DOOR FRAME IN PANELLING TYPE OF THK 0.04 M AS SHOWN IN DRG AND INSTALLED AT SITE WITH THE USE OF ANCHOR FASTERNER OF SIX HINGES OF 0.150 0.30 M LONG HEAVY 0.30 M LONG 0.30 M LONG 0.45 M LONG
1 D3 1.20MX2.40M 2.40 REQUIRED STRENGTH AS APPROVED M HEAVY DUTY DUTY BRASS PLATED HEAVY DUTY HEAVY DUTY BRASS PLATED HEAVY DUTY
DOUBLE LEAF PANELLED DOOR SHUTTER WITH TEAK WOOD STYLES ,TOP RAIL AND INTERMEDIATE RAILS (IF REQUIRED)OF SIZE 100MMX40MM ,LOCK CHROME PLATED TWO TOWER BRASS PLATED EXTERNAL BRASS PLATED
AND BOTTOM RAILOF SIZE 200MM X40MM WITH INSERT PANELS OF 19MM THK BOTH SIDES WATER PROOF PLYWOOD WITH VENEER OF APPROVED BOLT INTERNALLY INTERNALLY SIDE & INTERNAL EXTERNAL SIDE
MAKE.WITH FIXTURES OF APPROVED MAKE SIDE BOTH

TEAK WOOD DOOR FRAME IN PANELLING TYPE OF THK 0.04 M AS SHOWN IN DRG AND INSTALLED AT SITE WITH THE USE OF ANCHOR FASTERNER OF SIX HINGES OF 0.150 0.30 M LONG HEAVY 0.30 M LONG 0.30 M LONG 0.45 M LONG
1 D4 1.00MX2.40M 2.40 REQUIRED STRENGTH AS APPROVED M HEAVY DUTY DUTY BRASS PLATED HEAVY DUTY HEAVY DUTY BRASS PLATED HEAVY DUTY
DOUBLE LEAF PANELLED DOOR SHUTTER WITH TEAK WOOD STYLES ,TOP RAIL AND INTERMEDIATE RAILS (IF REQUIRED)OF SIZE 100MMX40MM ,LOCK CHROME PLATED TWO TOWER BRASS PLATED EXTERNAL BRASS PLATED
AND BOTTOM RAILOF SIZE 200MM X40MM WITH INSERT PANELS OF 19MM THK BOTH SIDES WATER PROOF PLYWOOD WITH VENEER OF APPROVED BOLT INTERNALLY INTERNALLY SIDE & INTERNAL EXTERNAL SIDE
MAKE.WITH FIXTURES OF APPROVED MAKE SIDE BOTH

2 DOOR FRAME OF BLACK GRANITE WITH FULL BULLNOSING INSTALLED WITH SKILLED LABOUR WITH ARALDITE AS APPROVED THREE HINGES OF 0.20 M LONG HEAVY 0.20 M LONG 0.15 M LONGHEAVY 0.30 M LONG
D5 0.75MX2.40M 2.40
32 MM THK SOLID CORE FLUSH DOOR OF WATERPROOF GRADE WITH LAMINATE OF BOTH SIDES OF WENGE DESIGN 0.125M HEAVY DUTY DUTY CROME PLATED HEAVY DUTY M.S DUTY M.S CROME HEAVY DUTY M.S
CHROME PLATED ONE TOWERBOLT CROME PLATED PLATED EXTERNALSIDE CHROME PLATED
INTERNALLY INTERNALLY & INTERNAL SIDE BOTH EXTERNAL SIDE
2 DOOR FRAME OF BLACK GRANITE WITH FULL BULLNOSING INSTALLED WITH SKILLED LABOUR WITH ARALDITE AS APPROVED THREE HINGES OF 0.20 M LONG HEAVY 0.20 M LONG 0.15 M LONGHEAVY 0.30 M LONG
D6 0.60MX2.40M 2.40
32 MM THK SOLID CORE FLUSH DOOR OF WATERPROOF GRADE WITH LAMINATE OF BOTH SIDES OF WENGE DESIGN 0.125M HEAVY DUTY DUTY CROME PLATED HEAVY DUTY M.S DUTY M.S CROME HEAVY DUTY M.S
CHROME PLATED ONE TOWERBOLT CROME PLATED PLATED EXTERNALSIDE CHROME PLATED THIS IS A PRESENTATION DRAWING IT MAY BE MODIFIED DURING EXECUTION
INTERNALLY INTERNALLY & INTERNAL SIDE BOTH EXTERNAL SIDE
NOTE :
C78,79,80,81 IS TAKEN SQUARE UPTO 1M BUILDING TYPE-
FROM PLINTH AND AFTER 1M IT IS TAKEN AS

SHEET NO:
MAIN BUILDING
ROUND COL. PLEASE REFER ELEVATION FOR
THIS

PLINTH PROTECTION PLINTH PROTECTION

C78 C79 C80 C81


GROUND FLOOR & FIRST FLOOR PLAN
1.58M
1.05M

0.23M

0.37M

0.83M
0.52M

D2 0.75M

JANITOR ROOM
D4
GENTS CHANGING ROOM
TITLE: FLOORING DETAILS
WAITING LOUNGE D6 S D6 S D6 S D6 S D6 S

PASSAGE D4 CHANGING ROOM CHANGING ROOM CHANGING ROOM CHANGING ROOM CHANGING ROOM

D5
SLEEVE TO HIDE SLEEVE TO HIDE S

RAIN WATER PIPE RAIN WATER PIPE


C66 C59A
SPECIFICATIONS:
0.68M 0.68M 0.68M 0.68M V1

0.60M

0.60M

0.60M

0.60M
FIXED TOUGHNED GLASS FIXED TOUGHNED GLASS FIXED TOUGHNED GLASS

RECEPTION
M.S. LOUVERS
1.05M 0.22M 0.22M 0.22M 0.22M
SHOWER AREA

0.37M

0.37M

0.37M

0.37M
S S S S S S S
D6 D6 D6 D6 D6 D5
D5
0.83M

0.37M

0.52M

DUCT D4 0.23x0.53
W.C. W.C.
0.75M 0.30M
S 0.60M 0.60M

0.23x0.60
S S
V DUCT
V
D4
V
TREAD = 300MM
V
UP 1
RISER = 173MM
LOBBY LADIES CHANGING ROOM V 70.23M

GYMNASIUM FOR 50 PEOPLES 0.30x0.68


2
3
26
25 0.30x0.68
D1 D6 S D6 S D6 S 0.60M

W.C. W.C.
0.60M

D3 CHANGING ROOM CHANGING ROOM CHANGING ROOM


24
4
5 23 D1 S D5 S
D5 S CRICKET NET PRACTICE PITCHES

6 22
D2 0.23x0.53
7 21 D4 D2
0.23x0.53
8 20 SHOWER AREA
D2
19
PASSAGE
9
D2 S S S S S S
10 18 D6 D6 D6 D6 D6
D5

1.14M
11 17 JANITOR ROOM
PROVISION FOR OPEN COURT

12 16

60.44M
13 15
14 TENNIS COURT FOR DOUBLES
S
BILLARD ROOM
6.15M X 6M ADMIN. OFFICE BACK OFFICE PRESIDENT CABIN S TOILET

SWIMMING POOL
6M X 6.8M 6M X 4.8M 6M X 3M
PEDICURE D4
S
AND MANICURE
PASSAGE
3.35M x 3.85M
CAPACITY OF 6 PASSENGER
SPA
TENNIS COURT FOR DOUBLES
LIFT 6.15M x 3.85M
LD 2.00M X 1.80M
55.12M

126.57M
FIXED TOUGHNED GLASS
S S D4
JOGGING TRACK

D4
BABY POOL

D5
S D4
D1
TOILET PASSAGE
7M X 2M D4 D4
GYMNASIUM FOR 50 PEOPLES

RECEPTION CONFERENCE ROOM D4 D4

MEETING ROOM / LIBRARY S S S S

9m
COURTYARD COURTYARD 7M X 5M

TRACK
8.1M X 5M

w
HALL

JOGGING TRACK
D1 4.9M X 5M D1 4.9M X 5M
65 SQ.MT

JOGGING
D1 D1

i
MALE MASSAGE FEMALE MASSAGE SAUNA

d
STEAM BATH

66.31M

d
ROOM ROOM 4M x 3.37M
water body water body

S 4M x 2.70M 4M x 2.70M

a
4M x 3.37M

e
0.23x0.53 V

r
HALL

o
DUCT PARTY LAWN

e
C23

a
LAWN DUCT

65 SQ.MT
0.75M 0.75M

FIXED TOUGHNED GLASS

d
LAWN FIXED TOUGHNED GLASS

d
0.52M 0.52M
0.83M

0.37M

0.37M

0.83M

i
w
OPENABLE GLASS
1.05M 1.05M

9m
FIXED TOUGHNED GLASS JOGGING TRACK JOGGING TRACK
W1 W1 W1 W1 M.S. LOUVERS
FOUNTAIN

VISITORS PARKING VISITORS PARKING

water trough water trough

wall in stone wall in stone


cladding with cladding with
4m height
C6 C7
4m height
SITE PLAN
wall in stone 0.60M
S 0.60M wall in stone

0.30M

0.30M
cladding with cladding with

water body water body

0.23M

0.23M
0.45M 0.45M
waterfall having waterfall having
wall 3.5m height wall 3.5m height

WATERFALL WITH RAINFALL


SITE PLAN
GROUND FLOOR PLAN
SKY SITTING WITH ARTIFICIAL MD
LAWN
wall with 1.20m height wall with 1.20m height

SCALE-1:1500
7
C3
wall with 0.75m height wall with 0.75m height
6
5

C1 4
3
2
1
C4
SCALE-1:175
TREAD = 300MM
RISER = 150MM
UP

wall with 0.75m height wall with 0.75m height

FRONT YARD

PLINTH PROTECTION PLINTH PROTECTION

C78 C79 C80 C81

1.58M

0.30M
W2 S W2 W2 W2 S W2 D4
D1 D1 LOBBY
SMOKING AREA
10.30M x 4M PASSAGE 6.23 M X 4M
SLEEVE TO HIDE
RAIN WATER PIPE

0.68M 0.68M 0.68M 0.68M


0.60M

0.60M

0.60M

0.60M
0.22M
W2
0.22M 0.22M 0.22M

W2
OFFICERS CLUB
0.37M

0.37M

0.37M

0.37M
D4 0.23x0.53
C66 W3
V TOILET
C62 V V
TOILET V 0.30M (PRESIDENT; HON.
D5 D5
S D5 D5 S COLLECTOR,LATUR DISTRICT)
TOILET TOILET TREAD = 300MM
2M X 2.50M 2M X 2.50M RISER = 173MM
UP
0.30x0.68
0.30M
TITLE
S S
0.30x0.68

OF THE PROPOSED OFFICERS CLUB, LATUR


W2
0.23x0.53

BEDROOM BEDROOM BEDROOM BEDROOM SQUASH COURT PROJECT


4.07M X 4.50M 3.89M X 6.1M 3.89M X 6.1M 4.07M X 4.50M
WAITING LOUNGE 6.23M x 10M BADMINTON COURT BADMINTON COURT BADMINTON COURT
D4 D4 6.10M X 13.40M 6.10M X 13.40M 6.10M X 13.40M
S
D4 D4
S S S
DRAWN CHECKED : KK
C44 S

W2 TREAD = 300MM
SCALE DATE:
PASSAGE PASSAGE RISER = 150MM

UP UP
0.30M

D4 D4 D4 LIFT
D4
1.40M X 1.80M
LD

1.88M
S S S S

consultants
S
LIVING ROOM D4 D4
4.07M X 4.50M LIVING ROOM
W2
4.07M X 4.50M
W2 W2 W2
Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,
BEDROOM Latur-413512,Maharashtra.
TOILET TOILET BEDROOM
3.89M X 6.1M 2M X 2.50M 2M X 2.50M O.T.S. O.T.S. Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in
3.89M X 6.1M

1.50M
ARCHITECTS:
BALCONY V V BALCONY HALL
KRISHNAKUMAR BANGAD
2.35M 3.95M 1.53M 3.91M 3.99M

W2 W2
12.5M X 8.4M DUMMY JALI WORK

jali work
jali work 0.30 x 0.60
FIIA, COA, FIV, IIID
SLEEVE TO HIDE
RAIN WATER PIPE
SLEEVE TO HIDE
RAIN WATER PIPE CA/2004/32977
0.60M 0.60M
0.30M

0.30M
0.23M

0.23M

0.45M 0.45M

1.50M

FIRST FLOOR PLAN


SKY SITTING WITH ARTIFICIAL WATERFALL WITH RAINFALL
LAWN

SCALE-1:175
C1 C2 C3 C4

THIS IS A PRESENTATION DRAWING IT MAY BE MODIFIED DURING EXECUTION


BUILDING TYPE-
SHEET NO:
MAIN BUILDING

GROUND FLOOR & FIRST FLOOR PLAN

TITLE: FLOORING DETAILS


1.58M

0.30M
SLAB BELOW SPECIFICATIONS:
SLEEVE TO HIDE SLEEVE TO HIDE SLEEVE TO HIDE SLEEVE TO HIDE
RAIN WATER PIPE RAIN WATER PIPE RAIN WATER PIPE RAIN WATER PIPE

jali work 0.68M 0.68M 0.68M

0.60M

0.60M

0.60M

0.60M
W2
0.22M 0.22M 0.22M 0.22M

0.37M

0.37M

0.37M

0.37M
W2

0.23x0.53
C62 C66 W3
V V 0.30M
V TOILET D5 D5 TOILET 70.23M
V D2
S D5 D5 S

1.88M
TOILET TOILET
2M X 2.50M 2M X 2.50M
UP
CRICKET NET PRACTICE PITCHES

0.30M
0.30x0.68
0.30x0.68

S S

W2 PROVISION FOR OPEN COURT


0.23x0.53

60.44M
BEDROOM BEDROOM BEDROOM BEDROOM
4.07M X 4.50M 3.89M X 6.1M 3.89M X 6.1M 4.07M X 4.50M TABLE TENNIS TENNIS COURT FOR DOUBLES

WAITING LOUNGE 6.23M X 10M


D4 D4 D4 D4
S S S

SWIMMING POOL
C44 S

TENNIS COURT FOR DOUBLES

W2 PASSAGE PASSAGE
55.12M

126.57M
0.30M
JOGGING TRACK

BABY POOL

LIFT
LD 1.40M X 1.80M

1.88M
S S D4
S S S
D4 D4 D4 S
GYMNASIUM FOR 50 PEOPLES

HEIGHT TO BE TAKEN

9m
LIVING ROOM

TRACK
4.07M X 4.50M AS PER SECTION

w
JOGGING TRACK
HALL

LIVING ROOM
65 SQ.MT

JOGGING
W2

i
4.07M X 4.50M W2

66.31M

d
water body water body

e
BEDROOM
HEIGHT TO BE TAKEN AS

o
BEDROOM

r
TOILET TOILET
O.T.S. O.T.S.

r
3.89M X 6.1M

o
2M X 2.50M 2M X 2.50M 3.89M X 6.1M
PER SECTION
PARTY LAWN

a
d

d
i
1.50M
D4

w
D4
1.45M

D5 D5

9m
JOGGING TRACK JOGGING TRACK

BALCONY V V BALCONY FOUNTAIN

4.10M VISITORS PARKING VISITORS PARKING


2.35M 2.35M 3.95M 1.53M 3.91M 3.99M

W2 W2 DUMMY JALI WORK

jali work jali work


SITE PLAN
SLEEVE TO HIDE SLEEVE TO HIDE
RAIN WATER PIPE RAIN WATER PIPE

0.23 x 0.53

SITE PLAN
SCALE-1:1500

SECOND FLOOR PLAN


SKY SITTING WITH ARTIFICIAL WATERFALL WITH RAINFALL
LAWN
SLAB BELOW

SCALE-1:175
C1 C2 C3 C4

SECOND FLOOR PLAN


1.58M

0.30M
GUTTER

SLEEVE TO HIDE
RAIN WATER PIPE
SLEEVE TO HIDE
RAIN WATER PIPE
SLEEVE TO HIDE
RAIN WATER PIPE
SLEEVE TO HIDE
RAIN WATER PIPE
OFFICERS CLUB
0.68M 0.68M 0.68M 0.68M
(PRESIDENT; HON.
0.60M

0.60M

0.60M

0.60M
0.22M 0.22M 0.22M 0.22M
0.37M

0.37M

0.37M

0.37M
COLLECTOR,LATUR DISTRICT)
0.37M

0.37M

S S 0.23x0.53
D4 D4

TITLE
S
OF THE PROPOSED OFFICERS CLUB, LATUR

SLOPE
DN
0.30M
0.30M

0.30M

PROJECT
0.30M

0.30M

0.30x0.68
0.30x0.68
0.30M

0.30M
0.30M

0.30M
0.30M

0.30M

0.23x0.53
0.30M

0.30M

DRAWN CHECKED : KK
0.30M

0.30M

RIDGE LINE
0.30M

0.30M

TO BE COVERED BY POLYCORBONATE SHEET


0.30M

0.30M

DATE:
0.30M

0.30M

SCALE
0.30M

0.30M
0.30M

0.30M

1.76M
S
1.80M

SLOPE
SLOPE
1.80M

3.70M

MACHINE ROOM
D4 3.70M x 1.80M consultants

TO BE COVERED BY POLYCORBONATE SHEET

Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,


SLAB BELOW Latur-413512,Maharashtra.
Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in

OPEN TO SKY TO BE
COVERED BY POLYCORBONATE SHEET
OPEN TO SKY TO BE
COVERED BY POLYCORBONATE SHEET ARCHITECTS:
GUTTER

2.46M
KRISHNAKUMAR BANGAD

0.93M
FIIA, COA, FIV, IIID
DOME TO BE TAKEN CA/2004/32977
AS PER ELEVATION

SLEEVE TO HIDE SLEEVE TO HIDE


RAIN WATER PIPE RAIN WATER PIPE

0.60M 0.60M
0.30M

0.30M
0.23M

0.23M

0.45M 0.45M

TERRACE FLOOR PLAN


SCALE-1:175
THIS IS A PRESENTATION DRAWING IT MAY BE MODIFIED DURING EXECUTION
SHEET NO:

0.15

0.15
150 MM THK SLAB 150 MM THK SLAB

0.40
600
PARKING LEVEL 0.31 75mm THK.

0.23
S2 - 175THK. HANDLE
PRICAST COVER TITLE: SEPTIC TANK DETAIL
U.G.T TANK FIRE FIGHTING TANK 300 FREE BOARD
1.80

1.80
4.50MX5.00MX1.80M 0.15 9.30X5.00X1.80 600
SPECIFICATIONS:
T10 @125 C/C
VERTICAL OUTSIDE
FACE (STAGGERED) T10 @125 C/C
VERTICAL INSIDE
600 FACE (STAGGERED)
SLOPE SLOPE 450

0. OPEN GUTTER IN
15

15
BRICK BAT

0.

3.07
4.50 5.00 FILLING AND
WATER PROOFING TREATMENT AS PER PECIFICATIONS
T8 @150 C/C CEMEMT LINING
HORIZONTAL
0.15

SECTION A-A' (STAGGERED)

PROVIDE EXTRA REINFT


SECTION
AT TOP OF BEAM
150 MM THK SLAB T12 @150 C/C IN
WATER PROOFING 230
DETAIL OF TYPICAL INSPECTION CHEMBER
2600 IN LENGTH TREATMENT AS
PER SPECIFICATIONS.
EXTRA OPEN GUTTER
230 T10 @200 C/C
T10 @250 C/C
WITH
230 (BOTHWAYS)
AT TOP & BOTTOM FACE
SOIL PIPE HIGH CEMENT

230

230
U.G.T TANK S1
GRADIENT SLOPE LINING

1.80
4.50MX5.00MX1.80M 150THK. P.C.C.
1:200

4-T10 HARD STRATA

SLOPE
0.10
0.23m BRICK WORK
5.00
WATER PROOFING TREATMENT AS PER PECIFICATIONS
25 mm THK. CEMENT
PLASTERING WITH
SECTION B-B' SMOOTH CEMENT
5.30 FINISHING
INLET PIPE
5.00 1X1 M MAN HOLE OPENING
1.50 X 0.75
0.70 1.10
SLOPE

INLET 1.00
4.20 INSPECTION

0.60

0.60
CHAMBERS
CHAMBER 0.60 X

1.09
0.60 0.60 0.90
4.50MX5.00MX1.80M

1.82
0.90 0.90
U.G.T TANK

OUTLET

1.10
Aerobic Chamber
CHAMBERS
4.50

1.30 3.10 1.30


230 0.30 0.30
230
1.07
7.06
150 mm THK. M15 25 mm THK. WATER PROOF 150 mm THK.
SECTION AA'
MANHOLE

BED CONCRETE BEDDING WITH SMOOTH M20 RCC SLAB


1.30

LINKS CEMENT FINISHED


T8@ 150C/C OPENING
7 NOS 10 SURFACE
1.80 X 0.75

OFFICERS CLUB
230 MM THK R.C.C. WALL (PRESIDENT; HON.
PLAN

A IN M20 GRADE
9.95

INSPECTION WASTE WATER PIPE INSPECTION COLLECTOR,LATUR DISTRICT)


CHAMBER 0.60 X CONCRETE CHAMBER 0.60 X
0.90 7.96 0.90 TITLE
T10 @125 C/C
MANHOLE

T10 @125 C/C


VERTICAL OUTSIDE
VERTICAL INSIDE OF THE PROPOSED OFFICERS CLUB, LATUR
TO GUTTER
1.30

FACE (STAGGERED) FACE (STAGGERED)


1.00 PROJECT
1.28

1.28
0.90

0.90
T8 @150 C/C
HORIZONTAL OUTSIDE
FACE (STAGGERED)
DRAWN CHECKED : KK

1.00
T8 @150 C/C
HORIZONTAL INSIDE 0.60 MANHOLE 0.60
1.07 T10 @250 C/C FACE (STAGGERED) SCALE DATE:
600

EXTRA 0.75
600
600
230MM THK0.75 230MM THK
B.B.WALL IN B.B.WALL IN
5.00

230Thk.
C.M. 1:6 C.M. 1:6
consultants
ALL COLUMNS SIZE & REINE'T TO BE

4.50
FIRE FIGHTING TANK

EXTENDED UPTO TOP OF WATER TANK INLET OUTLET


SEPTIK TANK
3.68
9.30X5.00X1.80

CHAMBERS MANHOLE MANHOLE CHAMBERS Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,
Latur-413512,Maharashtra.
50 MM Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in

3.68
SCHEDULE OF SLAB [AT UNDERGROUND WATER TANK LEVEL]
ARCHITECTS:
REINFORCEMENT ALONG
SLOPE

SLAB TYPE REMARK


SLAB Thk.
SHORT SPAN LONG SPAN
KRISHNAKUMAR BANGAD
T10 @ 200 C/C T10 @ 200 C/C
FIIA, COA, FIV, IIID
100

AT BOTTOM TWOWAY
FACE
S1 230
T10 @ 200 C/C T10 @ 200 C/C AT TOP TWOWAY
5.00 FACE CA/2004/32977
S2 175 T12 @ 125 C/C T12 @ 125 C/C TWOWAY
1.30 2.95
4.20

6.46
SCHEDULE OF BEAMS [AT UNDERGROUND WATERTANK TOP SLAB LEVEL]

BEAM
SIZE BOTTOM REINFORCEMENT
FULL SPAN CURTAILED
TOP REINFORCEMENT
EXTRA AT SUPPORT
STIRRUPS
REMARKS
DETAIL AT A 75 mm UPVC VENT PIPE FIXED TO
COMPOUND/ RETAINING WALL
NUMBERS B D CENTRALLY FULL SPAN DIA. NOS. AND SPACING
PLACED LEFT RIGHT
B100 450 450 4-T20 4-T20 4-T20 T8 15[100], BAL. @ 200C/C AT WATERTANK
2.00 m HEIGHT ABOVE TANK SLAB
ON PINS FOUR LEGGED STIRRUPS TOP SLAB LEVEL

PLAN OF SEPTIC TANK


THIS IS A PRESENTATION DRAWING IT MAY BE MODIFIED DURING EXECUTION
SHEET NO:

WATER PROOFING TREATMENT


WITH DR.FIXIT PIDIFIN 2K//RBR COATING
TITLE: TYPICAL DETAIL
FLOORING IN LOBBY TD TERRACE
SPECIFICATIONS:
HEAT RESISTANT TILES KOTA STONE
WITH EPOXY GROUT IN THE JOINTS 18-20 MM THK
KOTA STONE
SKIRTING FLOORING IN HEAT
RESISTANCE TILE WITH EPOXY

0.15
KOTA STONE
0.15

JOINT SPACERS
FLOORING 600 X 600

125MM TH.

RCC SLAB

TOILET
SHOWER AREA

TILE DROP DETAIL


BLACK GRANITE STONE WATER PROOFING
Providing cement based OFFICERS CLUB
(PRESIDENT; HON.
water proofing treatment COLLECTOR,LATUR DISTRICT)

to terraces (Indian water TITLE


18-20 MM THK Terrace SSR ITEM OF THE PROPOSED OFFICERS CLUB, LATUR

VITRIFIED proofing or alike) with NO. 31.04 PROJECT

brick bats laid in required CHECKED : KK


ANTISKID TILE SKIRTING slope to drain the water
DRAWN
SCALE DATE:

300 X 300 for any span after


cleaning the base consultants

surface. Applying a coat Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,


Latur-413512,Maharashtra.

of cement slurry admixed Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in

ARCHITECTS:
with approved water KRISHNAKUMAR BANGAD
proofing compound and
BRICK WALL laying the brick bats on
FIIA, COA, FIV, IIID
CA/2004/32977

bottom layer in C.M.1:5


admixed with approved
water proofing compound
filling up to half depth of
brick bats
THIS IS A PRESENTATION DRAWING IT MAY BE MODIFIED DURING EXECUTION
SCHEDULE OF SPECIFICATIONS SCHEDULE OF SPECIFICATIONS

SR.NO DESCRIPTION PARTICULARS OF MATERIAL AND MAKE SR.NO DESCRIPTION PARTICULARS OF MATERIAL AND MAKE

1 FOUNDATION THE DEPTH OF EXCAVATION FOR FOUNDATION IS UP TO


DOOR FRAMES
2.50 METER FOR ANY TYPE OF FOUNDATION STRATA 8
HAVING SOIL BEARING CAPACITY 200 KN/M.SQ
a Building main entrance door i) teakwood /plywood door frame
a Plain Cement Concrete M- 15 b Quaters main Door frames. ii) Teak wood door frame
b RCC Footing and Columns M- 25
c Room Door frames. iii) Teak wood door frame
2 PLINTH LEVEL d Toilets Door Frames iv) Granite door frame
a RCC Columns and Plinth beams M- 25
10 DOOR SHUTTERS
b Masonry work in foundation and plinth Fly Ash brick work 230 mm thick in c.m. 1:6 i) toughned glass door shutters 12 mm thick with vision panel.
a Buliding main entrance door
c Filling in Plinth Murum Filling with contractor 's murum available on site of work
d Rubble Soling 150 to 230 mm thick rubble soling with stone dust and sand b Quaters Main door ii)Single leafed flush door shutters 35mm thick with lamination on both sides
e Bedding to plinth beam 150 MM thick layer of cement mortar 1:6 below plinth / ground beams. c Internal door iii)Single leafed flush door shutters 35mm thick with lamination on both sides
f PCC at Ground floor Leveling course of P>C>C> M - 15 150 mm thick Toilet door iv) FRP door shutters.
d
g Anti termite treatment Anti termite treatment to the foundations and below plinth PCC.

3 SUPER STRUCTURE
a All building R.C.C. work R.C.C. in M-25 WINDOWS
b Under ground and overhead water tanck etc. R.C.C. in M-25 a Room windows i) Alluminum framed sliding Windows with Glass and with mosquito net with M.S Grill.
c Reinforcements Thermo mechanical Treated (TMT)TOR steel Fe 500 b Toilet windows i) Alluminum Louvered ventilator with M.S Grill.
d Cover for RCC Members P.V.C. blocks /Reinforcement bars -As specified on drawings. 11 KITCHEN PLATFORM Black Granite 15 to 18 mm thk over kaddapah base and
verticals with heavy duty stainless steel sink.
4 WALLS
a External walls AAC Blocks wall 200 mm thick in chemical bonding 12 RAILING
b Internal Walls. R.C.C. in M-25 a Paradi and Railing for Living room Balcony R.C.C pardi 150mm thick up to 450 mm height and s.s brush
finish pipe railing 450 mm height above pardi.
5 PLASTER WORK
a Internal room ceiling 6mm thick gypsum plaster b Paradi and Railing for staircase R.C.C pardi 150mm thick up to 750 mm height and s.s brush
6mm thick cement plaster in 1:4 c.m. with wall care putty finish pipe railing 150 mm height above pardi.
b Common area ceiling
c Internal room wall ceiling 10 mm thick gypsum plaster
Common area wall ceiling Bituminious Roads:
6mm thick cement plaster in 1:4 with wall care putty 13 ROAD
d External Finish Sand faced plaster 21 to 23 mm thick in two coats 15 and 6 to 8 mm in 1:4 C.M. WBM Compacted 200 mm thick rubble soling along with hard
murrum watering and compaction,WBM compacted layer of
5 FLOORING 150mm thickness, 75 mm thickness bituminious bond Macadam,
a i) black granite stone flooring and steps /risers. 20 mm thick premix carpet, premix seal coat with paver finish.
Entrance steps
ii) Vitrified tiles 600 x 600 x 10 mm thick flooring Jogging Track:
b Entrance Lobby at Ground floor
Providing and fixing 328 x 328x 28 mm black rock finished paver
c Lobby at typical and terrace floor iii) 600 x 600 x 10 mm thick vitrified tile.
tiles over 50mm thk cushioning bed of sand or stone chippings.
d Staircase -mid landing area and staircase treads and risers iv) polish kotah stone for staircase mid landing , and tread and riser 25 to 30 mm thick flooring
All room area.
14 INTERNAL PAINTING
e v) vitrified tile 600 x 600 x10 mm height
a Ceilings Oil bound distemper
f All toilets. vi) 600 x 600 x 10 mm thick Antiskid vitrified tile in rustic finish
b Walls Plastic Emulsion
g Terraces viii) External grade tiles.
15 EXTERNAL PAINTING Waterproof exterior polymer based paint with primer.
h Staircase -mid landing area and staircase treads and risers ix) 600 x 100 mm thick Vitrified tile .
16 Plumbing AND PIPPING
i Security Cabin x) 600 x 100 mm thick Vitrified tile .
a Watersupply CPVC pipe
6 SKIRTING AND DADO b Drainage UPVC pipe
a Entrance Lobby at Ground floor i) black granite stone flooring and steps /risers. c Plumbing Fixtures make - Jaquar-continatal
b Lobby at typical and terrace floor ii) Vitrified tiles 600 x 600 x 10 mm thick flooring
17 ANTI TERMITE TREATMENT Treatment as per Indian stardard specifications.
c Staircase -mid landing area and staircase treads and risers iv) polish kotah stone 25 to 30 mm thick flooring, 100mm in height At Foundation level.
for staircase mid landing and tread and riser.
All room area. At Plinth level / two stages.
d v) vitrified tile 600 x 100 mm height
Around the periphery of the building.
e All toilets. vi) 300 x 600 Antiskid vitrified tile in rustic finish
f All kitchens. vi) 300 x 600 Antiskid vitrified tile in rustic finish 18 SANITARYWARE AND make - Jaquar-continatal

g Security Cabin ix) Vitrified tile 600 x 100 mm height . SANITARY FITTINGS
WINDOW FRAME 19 WATER PROOFING
7 Black Granite stone 20 to 25 mm thick at all four sides
a Toilet Membrane waterproofing technology with water proof bedding 25mm thick

b Terrace Membrane waterproofing technology with I.P.S. of 75 mm thick.


SCHEDULE OF SPECIFICATIONS SCHEDULE OF SPECIFICATIONS

SR.NO DESCRIPTION PARTICULARS OF MATERIAL AND MAKE SR.NO DESCRIPTION PARTICULARS OF MATERIAL AND MAKE

8 GMNASIUM 11 SWIMMING POOL


a FLOORING i) partly wooden flooring and partly rubber flooring a FLOORING i) ceramic tile flooring
b ACOUSTICS b UNDER WATER LIGHTING
c LIGHTING c SWIMMING POOL BASIC ITEMS

main drain ABS Square main drain/Round 450 x 450 with main frame screwed on base frame duly
d groutable on the pool bottom deepest part
EQUIPMENTS
overflow grating Suitable for 12'' wide over flow gutter modular type available in different colors made in Plastic
treadmill pro fit
filtered water inlet -floor inlet ABS Concrete floor inlet withss screw flow 12 m3/hrwith 2" female and male connection
eleptical pro fit
-wall inlet ABS Return inlet "Multiflow" for threading
spin bike pro fit
ladders Made in SS 304 with 38 mm OD ,14 gauge hand rails and anti skid SS trades fitted with nut
functional trainer pro fit
smith machine pro fit handrails
leg curl+ leg extation pro fit diving board
lat pul down/ row pro fit

peck fly pro fit d SWIMMING POOL FILTER SYSTEM

shoulder press/ chest press pro fit top mount filter plant 1200 dia Totally anti-corrosive manufactured with high quality glass fiber and polyester resins.

incline bench pro fit SandFilter - Fiberglass+C28 Reinforced polyester filter With inner
gel coat
flate bench pro fit

plate stand pro fit Working Pressure : 2.5 Kg

stool pro fit filter media


pro fit circulating pump
plane bench
electric starter panel
plate and rod and dumbles pro fit
e SWIMMING POOL MAINTANANCE
vibrator pro fit

dummble rack pro fit metalic vaaccum head

pro fit telescopic handle


rod stand
vaccum hose
9. BILLARD ROOM cleaning curved brush
a FLOORING deep bag kit
b LIGHTING
basic test kit
f
c EQUIPMENTS SWIMMING POOL PLUMBING
billard table pvc socket,elbow, tee, pipe,mta,fta, ball valve,reducer
brush,footvalve , solvent, etc
a set of pool balls
g SWIMMING POOL DECK AREA FLOORING mosaic tile paving
cue sticks must be minimum length of 1m and max.
weight of 100gm

traingle
chalk

10. SPA
a steam bath
sauna bath
massage table
pedicure and manicure section
zacussi for couple and group of 4
8 layer cushion system followed by primer layer to improve bonding of acrylic with
12 LAWN TENNIS COURT subfloor , acrylic resurfacer layer for filling and smoothing subfloor following by fine rubber
course for cushion. final line marking with acrylic texture coat white line coat

providing and fixing removable tennis poles of 75 x 75 x 3 mm square. the powder coated
TENNIS COURT NET POLES thikness is of 60 microns and in built gear box in square m.s.pipe . the heignt of the pipe is
( FIXED POLES INCLUDING NET ) 1m from ground level. net tornament grade : twin twisted grade : twin twisted 2.5mm thk with
45mm x 45mm opening , length 13.5m , height 1m
SCHEDULE OF SPECIFICATIONS SCHEDULE OF SPECIFICATIONS

SR.NO DESCRIPTION PARTICULARS OF MATERIAL AND MAKE SR.NO DESCRIPTION PARTICULARS OF MATERIAL AND MAKE

13 BADMINTON COURT 16 CRICKET NET PRACTICE PITCHES

a FLOORING Surface Board:- TEAK WOOD SPORTS FLOORING finished with 21 mm thick, 57 to 92 mm wide a FLOORING
and in random length in tongue and groove shape. The edges of the boards will have a finger lock
groove and the bottom side with air pass groove and treated with special anti termite and water b LIGHTING
resistant lacquer. Maple wood is the hardest of hard woods and is the recommended wood for c
Badminton court. All major tournaments are played on Teak/Maple Wood Floor only The Under
ACOUSTICS
Frame:- Made of Pine wood runners of 70 mm x 45 mm, treated with anti-termite solution and fixed on
the bottom side with 19 mm thick EPDM air cushioned pads, stappled through the two wings at 300
mm x 300 mm
17 PARTY LAWN 1000 SQ.MT
The floor will be machine sanded in uniform level and finished with BONA DIN APPROVED P. U.
Polishing water based polyurethane lacquer. Game line marking to be carried out in required colors
before applying the finish coat

b LIGHTING
c ACOUSTICS

d BADMINTON COURT NET POLES RESTAURANT


18

FLOORING

e BADMINTON COURT GAME LINE MARKING LIGHTING


ACOUSTICS

14 TABLE TENNIS
a FLOORING
b ACOUSTICS 19 ACCOMODATION NO.
c SUITE 8
LIGHTING
VIP SUITE 4

d EQUIPMENTS
table with net 20 ADMIN OFFICE
ball
racket/ paddle/ bat wooden laminated racket covered with rubber on one or two sides depending on grip 21 MEETING ROOM

22 CONFERENCE ROOM
15 SQUASH COURT
a Surface Board:- Made of Kiln Seasoned (moisture containt of approximately 14% at the time time of
FLOORING
dispatch), Treated Original North Amirician Maple Wood finished with 21 mm thick, 57 to 83 mm wide
PLOT AREA 3 ACRES
and in random length in tongue and groove shape. The edges of the boards will have a finger lock
groove and the bottom side with air pass groove and treated with special anti termite and water
resistant lacquer. Maple wood is the hardest of hard woods and is the recommended wood for squash
court. All major tournaments are played on Maple Wood Floor.
The Under Frame:- Made of commercial quality pine wood runners of 70 mm x 45 mm, treated with
anti-termite solution and fixed on the bottom side with 19 mm thick air cushioned pads, stappled
through the two wings at 350 mm x 350 mm

b Description:- Supply and Application of Bounce Wall Hard Plaster System meeting specifications for
HARD PLASTER Squash Court laid down by wsf specification. The system consists of a 10/12 mm base coat with silica
sand and top coat of 4-5mm, which makes it a total thickness of 14-15 mm. Due to extremely hard
nature of plaster a slight uneven color distribution may be seen once the plaster has dried, this doesn't
affact the strength or integrity of the plaster and must not be considered as a defect.
Area:- Wall plaster playing area is only below red lines

c WALL PAINTING
d GLASS BACK WALL free standing glass back wall made of 12 mm thick toughened glass with four panels, 1 door, 4 fines, fixtures and fittings and all the materials
required for eracting the glass walls. The height of the glass wall will be 2130 mm above the finished floor level

e SOUND BOARD SYSTEM (7 feet x 17 inch) x 3 Nos; Tin board of 22 gauge

f GAME LINE MARKING


BUILDING TYPE-
SHEET NO:
T.B T.B T.B
MAIN BUILDING
PB60 PB61 PB62 PB63 PB64 PB65
T.B T.B
T.B

FOUNDATION & FIRST FLOOR PLAN

PB107

PB109
PB103 PB57A PB57A

PB104

PB104

PB104

PB104
PB77A PB90A PB93 PB113
T.B T.B PB98A
T.B PB101
PB81A PB85A PB57 PB58 TITLE: R.C.C PLAN FOR FOUNDATION AND FIRST FLOOR
PB46B

PB106
PB50 PB51 PB52 PB53 PB54 PB55 PB55A T.B PB56A PB56
T.B T.B
SPECIFICATIONS:

PB104
PB24

PB24
PB48 PB49
PB68A
DUCT
T.B
PB24A

PB105
PB93A PB98
PB72 PB77 PB90
PB47 PB102 PB46A PB46B
PB100
PB52A PB52A T.B

PB104

PB104

PB104

PB104
T.B PB112
PB68 PB39 PB43
PB40 PB41 PB42 PB44

PB45 PB46

PB106
PB76A PB38A
PB81 PB100A
PB71A PB89A PB92A PB97A
T.B T.B T.B T.B PB85

T.B PB37A PB37 PB38


C45

PB94

PB67 PB92
T.B PB76 PB36 PB89 PB111
T.B PB71 PB97 PB99
T.B T.B PB108
PB108
LIFT
T.B T.B T.B

T.B T.B PB25 PB26 PB27 PB28 PB29 PB31 PB32 PB33 PB34

PB30 PB35 PB35A PB35B

PB66
PB84 PB20A PB21A PB22A PB23A
PB79

PB95 PB96A PB99A PB110


PB91 T.B PB96
T.B PB69 PB69 T.B PB70 PB75 PB88 PB96

T.B

PB108
PB108
PB24A
0.23x0.53

PB66A PB24
PB24

PB24

PB78 PB83

PB16

PB9 PB10 PB11 PB12 PB13 PB14 PB15 PB17 PB18 PB19 PB20 PB21 PB22 PB23

PB74 PB87

PB78 PB83

PB6 PB7 PB8

FOUNDATION PLAN PB78


PB86

SCALE-1:150 PB73
PB5
PB80 PB82
PB5A

PB1 PB2 PB3 PB4 PB4A

B75 B76 B77 B78 B79 B80


STRUCTURAL CONSULTANT
B70 B71 B72 B73 B74 SANJAY JATHADE M.TECH.(STR)
S2
B147
S2
'ROYAL PLAZA'COMPLEX F.FLOOR,S.NO.12,MURARGI PETH
S2 B115 S4
B121A
B128
B152
BEHIND BHAGWAT PETROL PUMP.SOLAPUR-413001
S4 S2 S2 B67 B68
B109
B142 CELL.9423589358 Email-sanjay_ jathade@rediffmail.com
B119 B119

B61 B65 B65 B131 B133 B136 S2 S2


B59 B60 B62 B63 B64 B66A B66 S1 S1 S1 S1 B146

B86 S5 B92 B96 S5 B105 B67 B68 OFFICERS CLUB


B56 S4 S4
S2
(PRESIDENT; HON.
B55
B57
S4 B120B
S4 S4 B120B S4
COLLECTOR,LATUR DISTRICT)
S5 S5 B58 B58A
B58 S1 B145 S1
B94
S1 B102
B99 B127
B90
B84 B88 S2 B141 B151 TITLE
S3 S3
B108
B114
B121 B49 B50 B51 B52 B53 B53A
OF THE PROPOSED OFFICERS CLUB, LATUR
B54
B49A B49A

S4 B118 B118 S2 S2 B144 S2


PROJECT
S4 S4
S4 S4 S1 S1
B43 B44
C45
B45 B46 B47 B53B B53C B53D
DRAWN DD CHECKED : KK
B130
B48 B120A B49B B49B
B135
B150 SCALE DATE:
B83 S4
S4 S4 S4 S4 B113
B58 B58 B58A B120 B126 B137
B98 B107 S1 S2 S1 B148 S1 B148 S2
B101 B140
S4 S4 S1 S1
B39 B40 B41 B42
B38 S4 B118A B118A
S4 consultants
B87 B33 B34 B35 B36 B37 B37A
B89
S4
B29 B30/30K B30A/30K B31/31K B32
S2 S1 S1 S2
B26 Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,
S3 S4 B27 B28 B28 B27 Latur-413512,Maharashtra.
B82 S3 S4 S4
Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in
S2 S1
B129
S5 S5 B97 B106 B112 B15 B15 B15 B124 B149
S1 B132

B22
B93 B100 B125 S1
B134 B138 B139
B143 ARCHITECTS:
B24 S1 S1 S1 S1

B117 B117 B25


KRISHNAKUMAR BANGAD
B23
B85 S5 S4
S5
B91 B95 B104 S4 S4
FIIA, COA, FIV, IIID
B9 B10 B11 B12 B13 B14 B14 B14 B16 B17 B18 B19 B20 B21
CA/2004/32977
B111
B123
S4 S4 S4

FIRST FLOOR PLAN B6 B7 B8

SCALE-1:150 B110 S4 B116 S4 B116 S4


B122

B1 B2 B3

THIS IS A PRESENTATION DRAWING IT MAY BE MODIFIED DURING EXECUTION


BUILDING TYPE-
SHEET NO:
MAIN BUILDING

FOUNDATION PLAN

TITLE: COLUMN & FOOTING DETAILS

SPECIFICATIONS:

STRUCTURAL CONSULTANT

SANJAY JATHADE M.TECH.(STR)


'ROYAL PLAZA'COMPLEX F.FLOOR,S.NO.12,MURARGI PETH
BEHIND BHAGWAT PETROL PUMP.SOLAPUR-413001
CELL.9423589358 Email-sanjay_ jathade@rediffmail.com

OFFICERS CLUB
D:\officers club\RESTAURANT\New Final a.png

(PRESIDENT; HON.
COLLECTOR,LATUR DISTRICT)

TITLE
OF THE PROPOSED OFFICERS CLUB, LATUR
PROJECT

DRAWN DD CHECKED : KK
SCALE DATE:

consultants

Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,


Latur-413512,Maharashtra.
Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in

ARCHITECTS:
KRISHNAKUMAR BANGAD
FIIA, COA, FIV, IIID
CA/2004/32977

THIS IS A PRESENTATION DRAWING IT MAY BE MODIFIED DURING EXECUTION


BUILDING TYPE-
SHEET NO:
MAIN BUILDING

FOUNDATION & FIRST FLOOR PLAN

TITLE: R.C.C PLAN FOR FOUNDATION AND FIRST FLOOR

SPECIFICATIONS:

STRUCTURAL CONSULTANT

SANJAY JATHADE M.TECH.(STR)


'ROYAL PLAZA'COMPLEX F.FLOOR,S.NO.12,MURARGI PETH
BEHIND BHAGWAT PETROL PUMP.SOLAPUR-413001
CELL.9423589358 Email-sanjay_ jathade@rediffmail.com

OFFICERS CLUB
(PRESIDENT; HON.
COLLECTOR,LATUR DISTRICT)

TITLE
OF THE PROPOSED OFFICERS CLUB, LATUR
PROJECT

DRAWN DD CHECKED : KK
SCALE DATE:

consultants

Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,


Latur-413512,Maharashtra.
Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in

ARCHITECTS:
KRISHNAKUMAR BANGAD
FIIA, COA, FIV, IIID
CA/2004/32977

THIS IS A PRESENTATION DRAWING IT MAY BE MODIFIED DURING EXECUTION


BUILDING TYPE-
SHEET NO:
MAIN BUILDING

FIRST FLOOR PLAN DETAILS

TITLE: SLAB & BEAM SCHEDULE DETAILS

SPECIFICATIONS:

STRUCTURAL CONSULTANT

SANJAY JATHADE M.TECH.(STR)


'ROYAL PLAZA'COMPLEX F.FLOOR,S.NO.12,MURARGI PETH
BEHIND BHAGWAT PETROL PUMP.SOLAPUR-413001
CELL.9423589358 Email-sanjay_ jathade@rediffmail.com

OFFICERS CLUB
D:\officers club\RESTAURANT\New Final a.png

(PRESIDENT; HON.
COLLECTOR,LATUR DISTRICT)

TITLE
OF THE PROPOSED OFFICERS CLUB, LATUR
PROJECT

DRAWN DD CHECKED : KK
SCALE DATE:

consultants

Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,


Latur-413512,Maharashtra.
Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in

ARCHITECTS:
KRISHNAKUMAR BANGAD
FIIA, COA, FIV, IIID
CA/2004/32977

THIS IS A PRESENTATION DRAWING IT MAY BE MODIFIED DURING EXECUTION


BUILDING TYPE-
SHEET NO:
MAIN BUILDING

SECOND & ROOF FLOOR PLAN


B1 B2 B3

SB1 SB1 B75 B76 B77 B78 B79 B80

SB1

SB1
S6
B110 B122

B70 B71 B72


B73
B74
TITLE: R.C.C PLAN FOR SECOND AND ROOF FLOOR

SB1
SB1
B128
B109
S2 B115
S4 S2 S4
B121A
S2 B132 SPECIFICATIONS:
B119 B119

B59 B60 B61 B62 B63 B64 B65 B65 B66A B66

S5 B92 B96 S5
B86 B105
B56 S4 S4
S2

B55 B57 S4
S4 B120B S4 B120B S4
S5 S5 B58 B58A
B94 B58
S1 B102
B99 B127
B90 B131
B84 B88 S2
B114
B108 B121
S3 S3
B54
B49A B49A

S4 B118 B118
S4 S4
S4 S4
B43 B44 B45 B46 B47
C45

B48 B120A

B83 S4
S4 S4 S4 S4 B113
B58 B58 B58A B120 B126 B130
B107
S4 S4
B38 B39 B40 B41 B42 LIFT S4
S4 B118A B118A

S4
B29 B30/30K B30A/30K B31/31K B32
B87
B89 B98 B101
B26
S3 S4
B82 S3 S4 S4
S2 S1
S5 S5 B106 B112 B15 B15 B15 B124
B93 B125 B129

B22 B24

B117 B117
B23
B85 S5 S5 S4 S4 S4
B91 B95 B104

B9 B10 B11 B12 B13 B14 B14 B14 B16 B17 B18 B19 B20 B21

B111
B123
S4 S4 S4

B6/30K B7/30K B8/31K

SECOND FLOOR PLAN


SB1

SB1
S6 B110 S4 B116 B122
S4 B116 S4 S6

SCALE-1:150
SB1 B1 B2 B3 SB1
S6

STRUCTURAL CONSULTANT

SANJAY JATHADE M.TECH.(STR)


'ROYAL PLAZA'COMPLEX F.FLOOR,S.NO.12,MURARGI PETH
BEHIND BHAGWAT PETROL PUMP.SOLAPUR-413001
CELL.9423589358 Email-sanjay_ jathade@rediffmail.com
SB1 B70 B71 B72 SB1

B75 B76 B77 B78 B79 B80


SB1 SB1 S6 SB1 SB1
B67 B68 B69
BK1 BK1 BK1 BK1 BK1

OFFICERS CLUB
D:\officers club\RESTAURANT\New Final a.png

B128
B132
(PRESIDENT; HON.
COLLECTOR,LATUR DISTRICT)

B59 B60 B61 B62 B63 B64 B65 B66


TITLE
B85 S5
B92 B96 S5
OF THE PROPOSED OFFICERS CLUB, LATUR
S4 B119 S2 B119 S4

B55
B56
B57
S4 B109
S4 S4 B110 S4
PROJECT
B58 B58 B58A
S4
S1 B102
B99 B127
B88 S2
B90

B114
B131
DRAWN DD CHECKED : KK
B108 B121
B84
S3 S3
B54
B50 B51
SCALE DATE:
S4 B118 B118
S4 S4
S4 S4
B43 B44 B45 B46 B47
C45

B48 B49

B83 S4 S4 B113
consultants
S4 S4 S4 B58 B58 B58A B126 B130
B120
B B107
S4 S4
B38 B39 B40 B41 B42 S4
S4 LIFT
B117 B117
Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,
B87 Latur-413512,Maharashtra.
B89 B98 Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in
S4
B29 B30 B30A B31 B32

B82 S3
B26 B101
S3 ARCHITECTS:
S2 S1

S4 B106 B112 B124


B125
B129
KRISHNAKUMAR BANGAD
B22
B23
B24
FIIA, COA, FIV, IIID
B81
S5
B91 B95
S5 BK1 BK1 BK1 BK1 BK1
CA/2004/32977
B9 B10 B11 B12 B13 B14 B15 B16 B17 B18 B19 B20 B21

B111
B123

B6 B7 B8
SB1

SB1
SB1

SB1

SB1 SB1

ROOF FLOOR PLAN


S4 S4 S4
S6 S6

SCALE-1:150 SB1
S6
B1 B2 B3
S6
SB1

ROOF FLOOR PLAN

THIS IS A PRESENTATION DRAWING IT MAY BE MODIFIED DURING EXECUTION


BUILDING TYPE-
SHEET NO:
MAIN BUILDING

SECOND FLOOR PLAN

TITLE: SLAB & BEAM SCHEDULE DETAILS

SPECIFICATIONS:

STRUCTURAL CONSULTANT

SANJAY JATHADE M.TECH.(STR)


'ROYAL PLAZA'COMPLEX F.FLOOR,S.NO.12,MURARGI PETH
BEHIND BHAGWAT PETROL PUMP.SOLAPUR-413001
CELL.9423589358 Email-sanjay_ jathade@rediffmail.com

OFFICERS CLUB
D:\officers club\RESTAURANT\New Final a.png

(PRESIDENT; HON.
COLLECTOR,LATUR DISTRICT)

TITLE
OF THE PROPOSED OFFICERS CLUB, LATUR
PROJECT

DRAWN DD CHECKED : KK
SCALE DATE:

consultants

Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,


Latur-413512,Maharashtra.
Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in

ARCHITECTS:
KRISHNAKUMAR BANGAD
FIIA, COA, FIV, IIID
CA/2004/32977

THIS IS A PRESENTATION DRAWING IT MAY BE MODIFIED DURING EXECUTION


BUILDING TYPE-
SHEET NO:
MAIN BUILDING

SLOPING ROOF & CORNICE DETAIL

TITLE: WORKING DRAWING


1.00M

SPECIFICATIONS:

SECTION AA'

0.15M
4.20M

8.4
2M 2M

3.10M
8.4
0.85M

1.00M
3.45M PLINTH PROTECTION

C78 C79 C80 C81


PLINTH PROTECTION

14.33M
W4 W3 D2

D4

PASSAGE WAITING LOUNGE


D4
D5
SLEEVE TO HIDE SLEEVE TO HIDE SLEEVE TO HIDE SLEEVE TO HIDE

15.40M
RAIN WATER PIPE RAIN WATER PIPE RAIN WATER PIPE RAIN WATER PIPE
C66
C59A
V1

RECEPTION
D5 D5
D4

V V
D4
V

UP LOBBY V V

GYMNASIUM FOR 50 PEOPLES D3


D1

D1 D5 D5

D4 D2 D2

D2 PASSAGE
BILLARD ROOM D3 PRESIDENT CABIN D5
6.15M X 6M 4.26 M X 6 M

ADMIN. OFFICE BACK OFFICE TOILET

9.60M
6.4 M X 6 M 5MX6M
PEDICURE
D4
AND MANICURE
PASSAGE
3.47 M x 3.85 M 6.15M x 3.85M 1.98 M x 3.85M
SPA

LD

D4
D5 D4
D1
D4
TOILET PASSAGE
2MX4M D4 D4
RECEPTION D4 D4

MEETING ROOM / LIBRARY COURTYARD COURTYARD


8.1M X 5M 4.9M X 5M
CONFERENCE ROOM
D1 D1
HALL D1 4.9M X 5M D1
7M X 5M STEAM BATH
MALE MASSAGE
ROOM
FEMALE MASSAGE
ROOM
SAUNA

65 SQ.MT V
4M x 3.37M
2.7 M x 3.37 M 2.7 M x 3.37 M
4M x 3.37M

C23

W1 W1 W1 W1

SIT OUT SIT OUT

C6 C7

water body water body

SKY SITTING WITH ARTIFICIAL MD WATERFALL WITH RAINFALL


LAWN

8.75M
C3

C1 C4

UP

FRONT YARD

PLINTH PROTECTION PLINTH PROTECTION

GROUND FLOOR PLAN

KEY PLAN
SCALE-1:750

1.20M
ELEVATION SECTIONAL ELEVATION SECTION BB'

15.40M

MOLDINGS IN
MOLDINGS IN PLAIN CEMENT
PLAIN CEMENT
OFFICERS CLUB
0.15M
(PRESIDENT; HON.
4.20M

0.12M 0.12M

COLLECTOR,LATUR DISTRICT)
4.20M

4.20M

0.12M
SLAB 0.20M 0.12M
0.21M
0.12M 0.20M
0.53M 0.53M 0.53M 0.12M

2.44M 4.00M 2.44M 2.20M 0.43M 0.12M


2.20M
2.00M 2.00M
0.19M

0.41M
TITLE
SLAB
0.20M

OF THE PROPOSED OFFICERS CLUB, LATUR


C1 C2 C3 C4 0.27M
0.16M

PROJECT
0.21M 0.12M 0.12M 0.14M

0.25M
7.70M 7.70M 0.15M

0.16M 0.12M 0.12M 0.12M

DRAWN CHECKED : KK
PLAN SCALE DATE:
DETAIL AT 'C'

1.00M consultants

0.08M

0.11M
MARBLE Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,
0.04M MARBLE JOINT Latur-413512,Maharashtra.

1.50M 0.08M 0.02M RAILING


Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in
0.06M
0.08M

0.02M
0.13M
0.11M

0.13M
ARCHITECTS:
0.15M
1.08M

0.12M

0.09M
0.02M KRISHNAKUMAR BANGAD
1.45M

FIIA, COA, FIV, IIID


0.31M CA/2004/32977
BALCONY
MARBLE

0.90
BALUSTER

0.15M 0.03M

0.02M
0.06M
0.03M
0.06M
0.37M

0.02M
0.06M
0.04M
UV RESISTANT
0.09M
0.02M POLY ACRYLIC

2.35M CEMENT
0.04M
0.30M
0.10M
0.20

0.07M
DETAIL AT 'A'
FLOORING

PCC

DETAIL OF SINGLE BALCONY RAILING ELEVATION


BALCONY RAILING PLAN BALUSTER DETAIL AT 'A' THIS IS A PRESENTATION DRAWING IT MAY BE MODIFIED DURING EXECUTION
BUILDING TYPE-
SHEET NO:
MAIN BUILDING
STAIRCASE DETAILS
STAIRCASE & LIFT DETAILS
MID
LANDING 130THK. MB1 F.F LVL. TITLE: STAIRCASE & LIFT DETAILS
LVL. 1.0

1.0 SPECIFICATIONS:

130THK.
F.F.BEAM 130THK.
T8@200c/c DESHUTTERING PERIOD
SPAN IN M UP TO 4.5 M ABOVE 4.5 M ABOVE 6.0 M
T12@125c/c MID MB1
T12@125c/c SLAB 7 DAYS 14 DAYS 14 DAYS
LANDING
BEAM 14 DAYS 21 DAYS 21 DAYS
T8@200c/c LVL.
1.0 T8@200c/c A B
C57 C58
L1 L2
PL.LVL. T10@125c/c T10@125c/c L1/3 OR 65XDIA.OF BAR L2/3 OR 65XDIA.OF BAR
T8@200c/c 130THK. WHICHEVER IS MAX. WHICHEVER IS MAX.
PB47 EXTRA REIN.
SECTION-BB TOP REIN. AT CONT.SUPP.
TOP REIN.
SECTION-AA
BOTT REIN. BOTT REIN.
STIRRUPS STIRRUPS
END SUPP. CONTINUS SUPP.
MB1 END SUPP.
C40 C41
A B

STAIRCASE PLAN @ TYP.CONT.BEAM


MIDLANDING LVL.
DESHUTTERING PERIOD
LIFT DETAILS

STRUCTURAL CONSULTANT

SANJAY JATHADE M.TECH.(STR)


'ROYAL PLAZA'COMPLEX F.FLOOR,S.NO.12,MURARGI PETH
BEHIND BHAGWAT PETROL PUMP.SOLAPUR-413001
CELL.9423589358 Email-sanjay_ jathade@rediffmail.com

D:\officers club\RESTAURANT\New Final a.png


OFFICERS CLUB
(PRESIDENT; HON.
COLLECTOR,LATUR DISTRICT)

TITLE
OF THE PROPOSED OFFICERS CLUB, LATUR
PROJECT

DRAWN DD CHECKED : KK
SCALE DATE:

consultants

Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,


Latur-413512,Maharashtra.
Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in

ARCHITECTS:
KRISHNAKUMAR BANGAD
FIIA, COA, FIV, IIID
NOTE : CA/2004/32977
DO NOT SCALE THE DRAWING
CONCRETE GRADE SHALL BE M20
'T' INDICATES TOR STEEL OF GRADE Fe 500
OF GRADE Fe 250 N/mm2
SBC OF SOIL ASSUMED AS 30 T/m2 CLEAR COVER TO MAIN REIN.
FOOTING 40mm, COLUMN 25mm BEAM 35mm, SLAB 20mm
ALL REIN.SHALL BE BENT UP AS SHOWN TO SATISFY THE
THE DEVELOPMENT LENGTH CRITERIA AS PER 465/2000
(FOR DEVELOPMENT LENGTH REFER SECT-DD)
MINIMUM CEMENT CONTENT & MAXIMUM
W/C RATIO USED FOR FOUNDATION CONCRETE SHOULD BE
AS PER CLASUSE 1.2,8.2,4.1,9.1.2 (TABLE-5) OF IS-456-2000 PLAN SHOWING BOTTOM
IF THERE ANY DEVIATION,REFERANCE SHALL BE MADE TO
THIS OFFICE BEFOR EXECUTION
REINFORCEMENT OF LIFT-2 THIS IS A PRESENTATION DRAWING IT MAY BE MODIFIED DURING EXECUTION

CLIENT NAME OF WORK TITLE


SHEET NO:

2.92M 2.92M TITLE: ENTRANCE GATE DETAIL

0.85M

0.85M
SPECIFICATIONS:
stone wall
redbrick wall
5.10M
0.39M 0.39M
0.56M
5.14M

1.25M

1.25M
1.15M 1.15M

2.75M
3.65M

3.65M
glass toughned glass

3.38M
3.38M

3.31M
4.00M 4.00M

officers club

1.99M

1.99M
1.76M

1.76M
ENTRANCE GATE ENTRANCE GATE

ELEVATION

ABIN SECURITY CABIN

2.92M 2.92M
ENTRANCE GATE ENTRANCE GATE
0.83M

0.83M
OFFICERS CLUB
(PRESIDENT; HON.
COLLECTOR,LATUR DISTRICT)

5.10M
TITLE
PROPOSED OFFICERS CLUB, LATUR
NAMEPLATE OF THE
stone wall PROJECT

DRAWN CHECKED : KK
SCALE DATE:

PLAN consultants

sloping roof sloping roof


Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,
Latur-413512,Maharashtra.
Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in

2.92M 2.92M

ARCHITECTS:
1.50M

1.50M
0.85M

0.85M

stone wall
redbrick wall

0.80M
5.10M
4.00M 4.00M
0.80M

0.39M 0.39M
0.56M
5.14M

KRISHNAKUMAR BANGAD
1.25M

1.25M

1.15M 1.15M
2.75M
1.50M

1.50M
1.25M

1.25M
3.65M

3.65M

toughned glass toughned glass


3.50M

3.50M
3.38M
1.25

3.38M

3.31M

4.00M 4.00M

officers club
1.99M

1.99M
1.76M

1.76M

FIIA, COA, FIV, IIID


1.25M

1.25M

1.25M
1.20M

1.20M

1.31
1.29
1.25

stone wall ENTRANCE GATE ENTRANCE GATE stone wall

ELEVATION CA/2004/32977

SECURITY CABIN SECURITY CABIN


4.0M x 3.5 M 4.0M x 3.5 M

2.92M 2.92M
column upto 1.25m from ground lvl stone wall upto1.25M from ground lvl stone wall upto1.25M from ground lvl stone wall upto1.25M from ground lvl column upto 1.25m from ground lvl column upto 1.25m from ground lvl stone wall upto1.25M from ground lvl
ENTRANCE GATE ENTRANCE GATE
0.83M

0.83M

5.10M
stone wall stone wall stone wall stone wall NAMEPLATE stone wall stone wall
stone wall

PLAN

BOUNDARY WALL AND ENTRANCE GATE

THIS IS A PRESENTATION DRAWING IT MAY BE MODIFIED DURING EXECUTION


SHEET NO:

B 300X530 4-T16 2-T16 T8@150c/c T8@200c/c TITLE: SECURITY CABIN DETAIL

SPECIFICATIONS:

COLUMN & FOOTING SCHEDULE


21" B
10-T16
FOOTING TOP
S
TO
FIRST FLOOR
21"
T8@6"c/c B
1.50M

FOOTING SIZE(LXB) 5'6''X5'6"


WATERPROOFING B.B. D 20"
B
COBA
REIN.PARALLELTO 'L' 13-T10
REIN.PARALLELTO 'B' 13-T10
0.10M

0.60M R.C.C. ROOF SLAB 150 MM P.C.C 6'0"X6'0"X0'4"


THK.
COLUMN MKD. C1,C2,C3,C4
3.20M

FIXED TOUGHNED GLASS

2.40M

600 X 100 MM MIRROR


POLISHED KOTA STONE
0.90M

0.90M

SKIRTING.
2.00M
TREAD=300 600 X 600 MM KOTA
mm. STONE OF 25 TO 30 MM
RISER=150mm. THK.
G.L. P.C.C. BED 1:4:8
SECTION a' - a'
A'

2.00M
BRICK MASONARY

P.C.C. BED MURRUM FILLING

P.C.C. BED

1.65M
1.65M

SECTION AA' a' a'

ENTRANCE STEPS DETAIL


SCALE 1:10
WINDOW = W A'

SECTION A' - A' SIZE = 2000 X 1500

OFFICERS CLUB
(PRESIDENT; HON.
COLLECTOR,LATUR DISTRICT)
A'
1.56M 1.56M TITLE
PROPOSED OFFICERS CLUB, LATUR
0.60M

0.60M
0.30M0.30M

0.30M0.30M
OF THE
PROJECT

DRAWN CHECKED : KK
1.00M 3.00M 1.00M 3.00M SCALE DATE:
D D
5.53M

5.53M
SLOPE
consultants

Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,


SLOPE
3.50M
3.20M

Latur-413512,Maharashtra.

SECURITY CABIN W SLOPE


SECURITY CABIN W
Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in

3.50M

3.50M
4.0M x 3.5 M 4.0M x 3.5 M ARCHITECTS:
KRISHNAKUMAR BANGAD
SLOPE
600 X 600 MM KOTA FIIA, COA, FIV, IIID
STONE
OF 25 TO 30 MM THK. CA/2004/32977
1.00M 2.00M 0.97M 1.00M 2.00M 1.00M

1.23M 1.23M

A W W
600 X 100 MM
MIRROR POLISHED KOTA STONE
SKIRTING.

THIS IS A PRESENTATION DRAWING IT MAY BE MODIFIED DURING EXECUTION


SHEET NO:
grid b grid b
grid b grid b
70.23M

grid b

TITLE: BOUNDARY WALL DETAIL


CRICKET NET PRACTICE PITCHES
grid b SPECIFICATIONS:

0.200
RETURN CREASE

STUMPS

BOWLING CREASE

POPPING CREASE

grid b

EMERGENCY GATE 1

PROVISION FOR OPEN COURT

0.600
60.44M

BACKCOURT
grid b

SERVICE LINE

BASELINE
TENNIS COURT FOR DOUBLES

grid b
P.C.C COPING

SWIMMING POOL
grid b

1.500
BACKCOURT

SERVICE LINE

BASELINE
TENNIS COURT FOR DOUBLES
grid b 230 MM BR. WALL
grid b grid b
grid b
55.12M

126.57M
DECK 3.00M
5
4
3

JOGGING TRACK 2
1 UP

GAMES EQUIPMENT
STORE ROOM WITH
grid b GENTS TOILET
LOCKERS
BABY POOL
LADIES TOILET

10.91M
15.40M

0.90
BEAM
C78 C79 C80 C81
17.37M
30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

8.00M 3.19M
1.09M

4.02M 3.69M 3.50M


W4 0.30M W3 D2

0.37M
0.30M
3.30M

JANITOR ROOM
GENTS CHANGING ROOM

1.50M 14
D4
13 15
11.

12 16 D6 D6 D6 D6 D6
STORE WAITING LOUNGE
33
5.49M

5.72M

PASSAGE
M

11 17
M

5.60M X 5.17M D4
33

D5

3.02M
10 18
11.

SLEEVE TO HIDE SLEEVE TO HIDE SLEEVE TO HIDE SLEEVE TO HIDE


3.00M

2.40M 9 19
RAIN WATER PIPE RAIN WATER PIPE RAIN WATER PIPE RAIN WATER PIPE 11.06M
8 20 C66
7 21
C59A
0.68M 0.68M 0.68M M 0.68M
COUNTER

6.43M
6
0.60M

0.60M

0.60M
.50

0.60M

RECEPTION
22

R1
2.3M X 2M R0 SHOWER AREA

.0
5 23 5.78M

0M
3.71M 1.98M
1.09M

2.91M

grid b
4
M

24 D6 D6 D6 D6 D6
D5 D5
48

4.

3 3.90M 3.86M 3.71M


4.

48

3.17M 25 DUCT 0.96M D4 0.23x0.53


3.69M 0.30M 3.74M 1.12M
M

2.43M W.C. W.C.


2 26 0.30M 0.30M 0.23M

1.92M
0.30M 5.04M 5.04M
1
UP 27 0.23x0.60

2.57M

2.57M
1.18M

V DUCT
V
D4
8.23M

3.40M
4.28M 4.24M V
1.22M

1.22M

4.45M

5.30M V V
ENTRANCE PORCH UP LOBBY LADIES CHANGING ROOM
0.98M

2.00M
4.24M 4.24M
GYMNASIUM FOR 50 PEOPLES 26 D1
5.27M

2 D6 D6 D6

1.20M
3 25 0.30x0.68

450X230 MM R.C.C.
W.C. W.C.
0.30x0.68
NON VEG KITCHEN D3
4 24
5.3M X 2M 6.60M 23 D1 D5 D5
5

1.20
soft sand filling 6 22
M

grid b
2.00M 0.23x0.53
48

6.37M 6.23M D2
4.

7 21 0.23M 0.62M D4 D2
3.00M

4.
48
M

0.23x0.53
RESTAURANT
3.28M

4.95M

8 20

1.57M

1.57M
SHOWER AREA
PASSAGE

1.08M
D2

1.20M
VEG KITCHEN 9 19

2.08M
6.01M
18 D2 D6 D6 D6 D6 D6
VEG KITCHEN 10
D5

6.01M
11 17 JANITOR ROOM
C3 3.84M 3.74M 3.98M 3.90M 3.86M 16
0.68M

0.68M
12

1.00M
13 15
0.51M

5.72M

5.72M

1.76M 1.90M

COLUMN
8.00M 14 3.47M 8.13M

0.68M
BILLARD ROOM

6.23M

6.00M

6.00M
2.96M

1.80M
3

1.80M
2 6.15M X 6M 2.96M ADMIN. OFFICE BACK OFFICE PRESIDENT CABIN TOILET

3.98M
15.23M

1
6M X 6.8M 6M X 4.8M 6M X 3M

4.43M

3.85M
3.10M
3.70M PEDICURE
3.75M

3.75M
D4

3.85M
AND MANICURE
2.24M 0.77M PASSAGE

9m
0.92M 3.35M x 3.85M
SPA

1.80M
LIFT 6.15M x 3.85M
LD 1.40M X 1.80M
5.72M 5.72M 0.23M
0.23M
8.36M 1.25M 2.71M 2.01M 2.68M 2.40M 1.34M 4.02M 0.62M 0.53M
TRACK

1.59M D4
3.51M D5 D4
1.25M 2.40M
8.61M

8.06M 1.23M 1.23M 6.00M 1.00M 1.25M


D4 D1

1.48M
1.50M

1.50M

1.50M

1.50M
TOILET
0.37M

PASSAGE
CHILDREN'S PLAY AREA 7M X 2M D4 D4 D4
RECEPTION CONFERENCE ROOM 1.00M
D4
1.00M
3.00M 1.69M 1.00M 1.00M 1.69M 3.00M

w
MEETING ROOM / LIBRARY

4.07M
COURTYARD COURTYARD 7M X 5M
4.63M

4.63M

4.64M
8.1M X 5M
5.00M

2.00M

5.00M

2.00M

2.00M
4.26M

D1 4.9M X 5M D1 4.9M X 5M

JOGGING TRACK
D1 D1

R.C.C FOOTING

0.70
MALE MASSAGE FEMALE MASSAGE SAUNA

8.10M
12.16M STEAM BATH ROOM ROOM

3.37M
4M x 3.37M
HALL

3.37M

3.37M
R4 4M x 3.37M 4M x 2.70M 4M x 2.70M
ING

GATE .55
0.23x0.53 2.86M R4. M V
78M

1.22M

8.21M
65 SQ.MT 2.00M

0.36M
1.20M

1.20M
0.37M

8.13M
1.50M

1.50M
DUCT 7.09M
1.20M

7.69M

7.69M
0.30M 0.30M 0.30M 4.90M DUCT C23

i
0.53M
3.84M 1.12M 1.20M 1.50M 1.20M 1.18M 1.50M 1.19M 1.23M 1.50M 1.23M 1.18M 1.50M 1.53M 2.17M 1.18M
3.74M 4.84M 4.91M 2.55M
ENTRA

JOGG

W1 W1 W1 W1
NCE GATE

14.00M

3.78M
d

SIT OUT SIT OUT


2.87M

2.87M
water trough water trough

100 MM THK. P.C.C. BED


0.23M

0.23M
SLEEVE TO HIDE SLEEVE TO HIDE
RAIN WATER PIPE

d
66.31M

1.20M RAIN WATER PIPE 1.20M


3

C6 C7

water body water body


grid b
4.00M

4.00M
4.04M
4.04M

2.00M

2.17M
7.00M

7.00M
WATERFALL WITH RAINFALL
2.19M

SKY SITTING WITH ARTIFICIAL MD


a

LAWN 4.00M

e
1.51M

1.51M
11.14M C3 11.14M
0.80M

7
6
3.50M 5 3.50M
2.88M

2.88M
4 C4
C1
3
2
0.23M

0.23M
1
o

4.00M
1.48M UP 1.48M

r
4.23M 4.23M
FRONT YARD
grid b
r

o
PARTY LAWN
e

a
d

d
type B
i
w

OFFICERS CLUB
9m

JOGGING TRACK JOGGING TRACK


(PRESIDENT; HON.
FOUNTAIN
grid b grid b COLLECTOR,LATUR DISTRICT)
GATE 1 A

GATE 2 A

VISITORS PARKING VISITORS PARKING

TITLE
OF THE PROPOSED OFFICERS CLUB, LATUR

grid b
PROJECT
grid b grid b grid b grid b

DRAWN CHECKED : KK
SCALE DATE:

consultants

Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,


Latur-413512,Maharashtra.
Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in

ARCHITECTS:
KRISHNAKUMAR BANGAD
FIIA, COA, FIV, IIID
CA/2004/32977
stone wall upto1.25M from ground lvl column upto 1.25m from ground lvl

stone wall stone wall

THIS IS A PRESENTATION DRAWING IT MAY BE MODIFIED DURING EXECUTION


SHEET NO:

GROUND FLOOR,FIRST FLOOR,SECOND FLOOR

TITLE: PLAYGROUND

SPECIFICATIONS:

OFFICERS CLUB
(PRESIDENT; HON.
COLLECTOR,LATUR DISTRICT)

TITLE
OF THE PROPOSED OFFICERS CLUB, LATUR
PROJECT

DRAWN DD CHECKED : KK
SCALE DATE:

consultants

Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,


Latur-413512,Maharashtra.
Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in

ARCHITECTS:
KRISHNAKUMAR BANGAD
FIIA, COA, FIV, IIID
CA/2004/32977

PLAY GROUND NEAR RESTAURANT THIS IS A PRESENTATION DRAWING IT MAY BE MODIFIED DURING EXECUTION
BUILDING TYPE-
SHEET NO:
RESTAURANT
KEY PLAN

TITLE: WORKING DRAWING

SPECIFICATIONS:

W 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
W 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

VEG KITCHEN 40
14 41
39
13 15 38 42
12 16 43
STORE 11 17 W1
37
W1 36 44
5.60M X 5.17M 10 18 LVL +4.50M 35 45
9 19 46
34
8 20 33 47 LVL +4.50M
7 21 48
COUNTER 6 22
NON VEG KITCHEN 32
49
70.23M

31
2.3M X 2M 5 23 30 50
4 24 29 51
3 25 52 CRICKET NET PRACTICE PITCHES
28
2 26 27
1
UP
LVL +4.50M
PROVISION FOR OPEN COURT

LVL +0.45M

60.44M
LVL +0.45M
ENTRANCE PORCH W.C. W.C. V V
TENNIS COURT FOR DOUBLES

NON VEG KITCHEN

SWIMMING POOL
5.3M X 2M V V MALE TOILET W.C. W.C.

W1
W1 RESTAURANT
RESTAURANT TENNIS COURT FOR DOUBLES

VEG KITCHEN FEMALE TOILET 55.12M


VEG KITCHEN

126.57M
C3 JOGGING TRACK
C3 JANITOR ROOM BABY POOL
11
.3

3M
3M

GYMNASIUM FOR 50 PEOPLES

.3
11

9m
TRACK

w
3

JOGGING TRACK
HALL

JOGGING
65 SQ.MT

i
2

66.31M

d
water body water body

e
o

r
FRONT YARD

o
PARTY LAWN

a
d

d
i
w
9m
JOGGING TRACK JOGGING TRACK
FOUNTAIN

VISITORS PARKING VISITORS PARKING

GROUND FLOOR PLAN FIRST FLOOR PLAN SITE PLAN


SCALE-1:150 SCALE-1:150 SCALE-1:1500

OFFICERS CLUB
(PRESIDENT; HON.
COLLECTOR,LATUR DISTRICT)
40

39 41
38 42
37 43
TITLE
36
35
44
45
OF THE PROPOSED OFFICERS CLUB, LATUR
34 46
33 47
32
31
48
49
PROJECT
30 50
29 51
28 DRAWN CHECKED : KK
LVL +8.55M
27
DN
D4

LVL +8.40M
SCALE DATE:

consultants

C3
Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,
Latur-413512,Maharashtra.
Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in

ARCHITECTS:
KRISHNAKUMAR BANGAD
FIIA, COA, FIV, IIID
CA/2004/32977

TERRACE FLOOR PLAN


SCALE-1:150

THIS IS A PRESENTATION DRAWING IT MAY BE MODIFIED DURING EXECUTION


BUILDING TYPE-
SHEET NO:
RESTAURANT
BUILT UP PLAN

TITLE: WORKING DRAWING

BUILT UP AREA GROUND FLOOR PLAN SPECIFICATIONS:

BUILT UP AREA STATEMENT UNIT


BUILT UP AREA GROUND FLOOR 367.53 SQ.MT.

DEDUCTIONS
DUCT 1
DUCT 1 3.73 SQ.MT.
3.73
DUCT 2 2.23 SQ.MT.
DUCT 2 70.23M

2.23
TOTAL DEDUCTIONS 5.96 SQ.MT. CRICKET NET PRACTICE PITCHES

BUILT-UP AREA STATEMENT PROVISION FOR OPEN COURT

CORRESPONDING

60.44M
TENNIS COURT FOR DOUBLES

CARPET AREA INCLUDING

SWIMMING POOL
STAIRCASE,LIFTS
TENNIS COURT FOR DOUBLES

TOTAL BUILT-UP AREA 361.57 SQ.MT.


55.12M

126.57M
JOGGING TRACK

BABY POOL

GYMNASIUM FOR 50 PEOPLES

9m
TRACK

w
JOGGING TRACK
HALL

JOGGING
65 SQ.MT

i
d

66.31M

d
water body water body

e
o

r
FRONT YARD

o
PARTY LAWN

a
d

d
i
w
9m
JOGGING TRACK JOGGING TRACK

GROUND FLOOR PLAN


FOUNTAIN

VISITORS PARKING VISITORS PARKING

SCALE-1:100 BUILT UP AREA FIRST FLOOR PLAN SITE PLAN


SCALE-1:1500

BUILT UP AREA STATEMENT UNIT


BUILT UP AREA FIRST FLOOR 408.57 SQ.MT.

DEDUCTIONS

DUCT 1 3.73 SQ.MT.


DUCT 2 2.23 SQ.MT.
OFFICERS CLUB
TOTAL DEDUCTIONS 5.96 SQ.MT. (PRESIDENT; HON.
COLLECTOR,LATUR DISTRICT)

BUILT-UP AREA STATEMENT TITLE


CORRESPONDING OF THE PROPOSED OFFICERS CLUB, LATUR
CARPET AREA INCLUDING PROJECT
DUCT 1 STAIRCASE,LIFTS
3.73 DRAWN CHECKED : KK

DUCT 2 TOTAL BUILT-UP AREA 402.61 SQ.MT. SCALE DATE:


2.23

consultants

Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,


Latur-413512,Maharashtra.

SUMMERY : Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in

ARCHITECTS:
KRISHNAKUMAR BANGAD
SR. TYPE OF NOS OF NOS OF B.U.A./ STAIRCASE TOTAL UNITS
NO. BUILDING BLDG FLR. INCLU. HEAD B.U.A. FIIA, COA, FIV, IIID
NOS NOS BALC. ROOM CA/2004/32977
STAIR, LIFT

1. RECREATIONAL 1 GR + 1 764.18 28.41 792.59 SQ.MT.


361.57 + 402.61
GR FLR + FIRST FLR

FIRST FLOOR PLAN


SCALE-1:100
THIS IS A PRESENTATION DRAWING IT MAY BE MODIFIED DURING EXECUTION
BUILDING TYPE-
SHEET NO:
RESTAURANT
CARPET AREA CALCULATION GROUND FLOOR PLAN GROUND FLOOR PLAN
CARPET AREA CALC. TYPICAL ROOM
TITLE: CARPET AREA
ROOM SIZE CARPET AREA UNIT
SPECIFICATIONS:
STORE 8X6.58 M 18.30 SQ.MT
KITCHEN 8X4.5 M 23.84 SQ.MT
PASSAGE 19.69 SQ.MT
RESTAURANT 147.9 SQ.MT

TOTAL CARPET AREA FOR ROOMS 209.73 SQMT


70.23M

DEDUCTIONS
CRICKET NET PRACTICE PITCHES

CARPET AREA STATEMENT AREA UNIT


PROVISION FOR OPEN COURT

SERVICES AREAS:

60.44M
TENNIS COURT FOR DOUBLES

SWIMMING POOL
STAIRCASE 17.21 SQ.MT.
TENNIS COURT FOR DOUBLES

55.12M

SQ.MT.

126.57M
DUCT 1 3.73 JOGGING TRACK

BABY POOL

GYMNASIUM FOR 50 PEOPLES

DUCT 2 2.23 SQ.MT.

9m
TRACK

w
JOGGING TRACK
HALL

JOGGING
65 SQ.MT

RESTAURANT GROUND FLOOR PLAN

i
d

66.31M

d
water body water body

e
13.85

o
W1 SQ.MT.

r
FRONT YARD

o
SCALE-1:120
PARTY LAWN

a
d

d
i
w
9m
JOGGING TRACK JOGGING TRACK

W2 13.85 SQ.MT. VISITORS PARKING


FOUNTAIN

VISITORS PARKING

W3 13.85 SQ.MT.
SITE PLAN
13.85 SQ.MT. SCALE-1:1500
W4

8.00M 5.26M
5.26M

W1 W4 TOTAL CARPET AREA AREA UNIT


50.34
13.85 13.85
4.98M

STORE STAIRS
11
.3

8M X 6.58M
3M

5.26M

17.21 SUM OF ROOM AREAS 209.73M SQMT


6.58M

49.11
OFFICERS CLUB
(PRESIDENT; HON.
COLLECTOR,LATUR DISTRICT)

DUCT 1
TOTAL CARPET AREA FOR 209.73M
RESTAURANT
SQMT TITLE
12.13M

3.73 PROPOSED OFFICERS CLUB, LATUR


47.22 GROUND FLOOR OF THE
1.22M
1.22M

DUCT 2 4.24M 7.54M PROJECT


2.23 4.24M

KITCHEN PASSAGE DRAWN CHECKED : KK


8M X 4.5M
34.17 SCALE DATE:
19.69
4.49M

TOTAL CARPET AREA AREA UNIT


5.26M

consultants
5.26M

8.00M 3.19M
W2 3.
01
M
W3 SUM OF ROOM AREAS 209.73M SQMT
13.85 50.34 13.85 Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,
Latur-413512,Maharashtra.
Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in

5.26M 5.26M
TOTAL CARPET AREA FOR 209.73M ARCHITECTS:
SQMT KRISHNAKUMAR BANGAD
GROUND FLOOR
FIIA, COA, FIV, IIID
CA/2004/32977

RESTAURANT GROUND FLOOR PLAN

THIS IS A PRESENTATION DRAWING IT MAY BE MODIFIED DURING EXECUTION


BUILDING TYPE-
SHEET NO:
RESTAURANT
CARPET AREA CALCULATION FIRST FLOOR PLAN FIRST FLOOR PLAN
CARPET AREA CALC. TYPICAL ROOM
TITLE: CARPET AREA
ROOM SIZE CARPET AREA UNIT
SPECIFICATIONS:

KITCHEN 8X5.1 M 42.41 SQ.MT


PASSAGE 22.66 SQ.MT
RESTAURANT 147.9 SQ.MT

TOTAL CARPET AREA FOR ROOMS 212.97 SQMT

DEDUCTIONS
70.23M

CRICKET NET PRACTICE PITCHES

CARPET AREA STATEMENT AREA UNIT


PROVISION FOR OPEN COURT

SERVICES AREAS:

60.44M
TENNIS COURT FOR DOUBLES

SWIMMING POOL
STAIRCASE 17.21 SQ.MT.
TENNIS COURT FOR DOUBLES

SQ.MT.
55.12M

126.57M
DUCT 1 3.73 JOGGING TRACK

BABY POOL

GYMNASIUM FOR 50 PEOPLES

DUCT 2 2.23 SQ.MT.

9m
TRACK

w
JOGGING TRACK
HALL

JOGGING
65 SQ.MT

i
d

66.31M

d
water body water body

e
W1 13.85

o
RESTAURANT FIRST FLOOR PLAN SQ.MT.

r
FRONT YARD

o
PARTY LAWN

a
d

d
i
SCALE-1:120

w
9m
JOGGING TRACK JOGGING TRACK

W2 13.85 SQ.MT. VISITORS PARKING


FOUNTAIN

VISITORS PARKING

W3 13.85 SQ.MT.
SITE PLAN
W4 13.85 SQ.MT. SCALE-1:1500

8.00M 3.19M
NAME OF AREA NO. SIZES AREA UNIT
5.26M
5.26M

77.85 TOILET 1
KITCHEN STAIRS
MALE TOILET
5.20M

8.00X5.17 M
5.17M

17.21
5.17M

5.17M

42.41
5.20M

PASSAGE 18.51 SQ.MT.


12
.19

OFFICERS CLUB
M

(PRESIDENT; HON.
W.C 2 1.20X1.00 2X1.39=2.78 SQ.MT. COLLECTOR,LATUR DISTRICT)
8.00M

JANITOR ROOM 1.45X1.30 1.88 SQ.MT. TITLE


DUCT 1
1.18M

PROPOSED OFFICERS CLUB, LATUR


1.18M

RESTAURANT
3.73 OF THE
7.02M
70.06 PROJECT
1.22M

2.60M
DUCT 2
0.83M

W.C. W.C.

1.39 1.39 PASSAGE 2.23 2.68M 2.83M


10.98M
FEMALE TOILET DRAWN CHECKED : KK
18.51
3.13M

1.55 1.55
1.20M

1.20M

PASSAGE DATE:
MALE TOILET W.C. W.C.

M
PASSAGE 5.83 SQ.MT. SCALE
15
8.
5.83
FEMALE TOILET
22.66 W.C 2 1.20 X 1.352X1.55=3.10 SQ.MT.
2.16M

1.88
1.30M

PASSAGE consultants
JANITOR ROOM
5.30M

1.45M 2.55M
5.26M

M
01
3.
TOTAL 32.1 SQMT Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,
Latur-413512,Maharashtra.
Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in

5.26M 5.26M
TOTAL CARPET AREA AREA UNIT ARCHITECTS:
KRISHNAKUMAR BANGAD
FIIA, COA, FIV, IIID
SUM OF ROOM AREAS 212.97 SQMT CA/2004/32977

SUM OF TOILET AREAS 32.1


RESTAURANT FIRST FLOOR PLAN TOTAL CARPET AREA FOR 245.07
SQMT
GROUND FLOOR

THIS IS A PRESENTATION DRAWING IT MAY BE MODIFIED DURING EXECUTION


10.91M
BUILDING TYPE-
SHEET NO:
RESTAURANT
17.37M
W 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
GROUND FLOOR & FIRST FLOOR PLAN
8.00M 3.19M

1.09M
TITLE: WORKING DRAWING

3.30M
1.50M 14
SPECIFICATIONS:

0.30M

0.30M
13 15

11
12

0.30M

0.30M
16
STORE

.3
3.00M

5.49M

5.72M
M3
11

0.30M

0.30M
17

3M
W1 5.60M X 5.17M

.3
10

0.30M

0.30M
18

11
2.40M 9

0.30M

0.30M
19
8

0.30M

0.30M
20
7

0.30M

0.30M
21
COUNTER 6

0.30M

0.30M
2.10M
22
2.3M X 2M 5

0.30M

0.30M
23

1.09M
4 2.91M

0.30M

0.30M

M
24

48

4.
3

0.30M

0.30M

4.
25

48
3.17M

M
2.43M 2

0.30M

0.30M
26
1
UP

1.18M
8.23M 4.28M 4.24M

1.22M

1.22M

4.45M
LVL +0.45M
5.30M LVL +0.45M
ENTRANCE PORCH
0.98M

0.98M
4.24M 4.24M
70.23M

NON VEG KITCHEN 0.45M 0.60M 0.75M 0.60M 0.30M

5.3M X 2M V V CRICKET NET PRACTICE PITCHES

8M
4.

4
3.00M

4.
48
W1 2.91M

M
RESTAURANT

3.28M

4.95M
PROVISION FOR OPEN COURT

VEG KITCHEN

60.44M
TENNIS COURT FOR DOUBLES

VEG KITCHEN
C3

SWIMMING POOL
0.51M

5.72M

5.72M
8.00M TENNIS COURT FOR DOUBLES

11
.3

3M
55.12M

3M

126.57M
.3
JOGGING TRACK

11
BABY POOL

3 GYMNASIUM FOR 50 PEOPLES

9m
TRACK
1

w
JOGGING TRACK
HALL

JOGGING
65 SQ.MT

i
d

66.31M

d
water body water body

e
o

r
FRONT YARD

5.72M 5.72M

o
PARTY LAWN

a
d

d
i
w
GROUND FLOOR PLAN

9m
JOGGING TRACK JOGGING TRACK
FOUNTAIN

VISITORS PARKING VISITORS PARKING

SCALE-1:100 10.91M
SITE PLAN
SCALE-1:1500

17.37M
W 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

8.00M 3.19M
1.31M

1.09M

5.40M

VEG KITCHEN 1.50M 40


41
0.30M

0.30M

39 12
42 .19
0.30M

0.30M

38
M
5.49M

5.72M
43
0.30M

0.30M

3M

37
W1
.3
0.30M

0.30M

36 44
11
3.00M

45 OFFICERS CLUB
0.30M

0.30M

LVL +4.50M 35
0.30M

0.30M

34 46
47
(PRESIDENT; HON.
0.30M

0.30M

33
M
LVL +4.50M
COLLECTOR,LATUR DISTRICT)
83
0.30M

0.30M

48
NON VEG KITCHEN 32
6.

49
0.30M

0.30M

31
1.09M

7.
69
50 2.91M
0.30M

0.30M

30

M
TITLE
0.53M

51
0.30M

0.30M

7.00M 29
52 PROPOSED OFFICERS CLUB, LATUR
0.30M

0.30M

28
27
OF THE
PROJECT
1.18M

8.23M 2.83M
LVL +4.50M
DRAWN CHECKED : KK
1.22M

4.45M
W.C. W.C. V
0.30M 0.60M 0.75M
V
0.60M 0.30M
2.83M
SCALE DATE:
3.05M

MALE TOILET W.C. W.C.

2.91M
consultants
W1 RESTAURANT
4.72M

3.02M

M
19
7.

8.
33

FEMALE TOILET
M

Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,


C3 Latur-413512,Maharashtra.
Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in
JANITOR ROOM

5.72M
0.74M

ARCHITECTS:
11
.3

M
3M

11.65M
.19

KRISHNAKUMAR BANGAD
12

FIIA, COA, FIV, IIID


CA/2004/32977

5.72M 5.72M

FIRST FLOOR PLAN


SCALE-1:100
THIS IS A PRESENTATION DRAWING IT MAY BE MODIFIED DURING EXECUTION
BUILDING TYPE-
SHEET NO:
RESTAURANT
TERRACE FLOOR PLAN

TITLE: WORKING DRAWING & FLOORING DETAIL

SPECIFICATIONS:

1.50M 40
41

0.30M

0.30M
39

0.30M

0.30M
38 42
43

0.30M

0.30M
37
44

0.30M

0.30M
36
45

0.30M

0.30M
35

0.30M

0.30M
34 46
47

0.30M

0.30M
33
48

0.30M

0.30M
32

0.30M

0.30M
31 49
50

0.30M

0.30M
30
51

0.30M

0.30M
29

0.30M

0.30M
28

LVL +8.55M
27
DN
D4
70.23M

LVL +8.40M

CRICKET NET PRACTICE PITCHES

PROVISION FOR OPEN COURT

60.44M
TENNIS COURT FOR DOUBLES

SWIMMING POOL
TENNIS COURT FOR DOUBLES

C3 55.12M

126.57M
JOGGING TRACK

BABY POOL

GYMNASIUM FOR 50 PEOPLES

9m
TRACK

w
JOGGING TRACK
HALL

JOGGING
65 SQ.MT

i
d

66.31M

d
water body water body

e
o

r
FRONT YARD

o
PARTY LAWN

a
d

d
i
w
9m
JOGGING TRACK JOGGING TRACK
FOUNTAIN

VISITORS PARKING VISITORS PARKING

TERRACE FLOOR PLAN SITE PLAN


SCALE-1:1500

SCALE-1:100

S
S
OFFICERS CLUB
(PRESIDENT; HON.
40
41
COLLECTOR,LATUR DISTRICT)
39
38 42
43
37
44
TITLE
36
35 45 OF THE PROPOSED OFFICERS CLUB, LATUR
34 46
33 47 PROJECT
32 48
31
30
49
50
DRAWN CHECKED : KK
29 51
28 SCALE DATE:
LVL +8.55M
27
DN
D4

LVL +8.40M

consultants
S
Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,
Latur-413512,Maharashtra.
Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in

ARCHITECTS:
KRISHNAKUMAR BANGAD
C3 FIIA, COA, FIV, IIID
CA/2004/32977

TERRACE FLOOR PLAN


FLOORING DETAILS THIS IS A PRESENTATION DRAWING IT MAY BE MODIFIED DURING EXECUTION

SCALE-1:100
BUILDING TYPE-
SHEET NO:
RESTAURANT
ELEVATION-1

fixed toughned glass TITLE: WORKING DRAWING

SPECIFICATIONS:

LVL 1.00 M LVL 1.00 M


+ 8.50M SECOND SLAB LVL

LVL +0.00 M LVL 0.00 M


+ 6.85M FIRST FLOOR LINTEL LVL
4.05 lines represented
t.g. t.g.
for curvature of column
window window
LVL +1.00 M
+5.35M FIRST FLOOR SILL LVL

LVL +2.91 M
LVL 4.28 M
+ 4.45M FIRST SLAB LVL B

W 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

tensile fabric tensile fabric 14


13 15
12
STORE 11
16
17
W1 5.60M X 5.17M 10 18
9 19
8 20
7 21
COUNTER 6 22
2.3M X 2M 5 23
4 24

LVL +0.00 M LVL 0.00 M 3


2
25
26
1
UP
4.05

open open C
LVL +0.45M LVL +0.45M

ENTRANCE PORCH

A
NON VEG KITCHEN
5.3M X 2M V V

LVL +1.00 M LVL +2.40 M LVL +2.40 M W1


RESTAURANT
VEG KITCHEN
VEG KITCHEN
C3

11
.3
3M

3M
.3
11
3

2
1
0.45

0.45

exposed brickwork exposed brickwork + 0.45M PLINTH LVL


+ 0.00M GROUND LVL GROUNDDFLOOR PLAN
KEY PLAN
SCALE-1:400

SCALE-1:80
LVL +1.41 M

LVL +1.00 M

OFFICERS CLUB
+ 8.50M SECOND SLAB LVL (PRESIDENT; HON.
LVL +0.00 M
COLLECTOR,LATUR DISTRICT)

TITLE
LVL +0.45 M LVL +0.45 M
OF THE PROPOSED OFFICERS CLUB, LATUR
+ 6.85M FIRST FLOOR LINTEL LVL PROJECT

false DRAWN CHECKED : KK


window W1
W1 window SCALE DATE:
+5.35M FIRST FLOOR SILL LVL

+ 4.45M FIRST SLAB LVL


consultants
LVL +0.00 M LVL +0.00 M LVL +0.20 M
LVL +0.30 M LVL +0.30 M

Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,


Latur-413512,Maharashtra.
+ 2.85M FIRST FLOOR LINTEL LVL Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in

LVL +0.00 M ARCHITECTS:


window window KRISHNAKUMAR BANGAD
W1 W1
+1.35M FIRST FLOOR SILL LVL FIIA, COA, FIV, IIID
CA/2004/32977
LVL +0.45 M LVL +0.45 M + 0.45M PLINTH LVL
+ 0.00M GROUND LVL

SCALE-1:80
THIS IS A PRESENTATION DRAWING IT MAY BE MODIFIED DURING EXECUTION
BUILDING TYPE-
SHEET NO:
RESTAURANT
ELEVATION-2

TITLE: WORKING DRAWING

SPECIFICATIONS:

fixed toughned glass


LVL +2.82 M

+ 8.50M SECOND SLAB LVL


B

W 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

EL LVL LVL -3.02 M LVL +2.47 M LVL +2.61 M LVL +2.61 M LVL +2.47 M LVL -3.02 M
+ 6.85M FIRST FLOOR LINTEL LVL 13
12
14

15

STORE 11
16
17
W1 5.60M X 5.17M 10 18
LVL +3.97 M 9
8
19
20
7 21
COUNTER 6 22
2.3M X 2M 5 23
4 24

lines represented 3
2
25
26
LVL +0.00 M LVL +0.00 M LVL +0.00 M LVL +0.00 M
window t.g. t.g. window
1
UP
for curvature of column LVL -2.42 M

C A
LVL +0.45M LVL +0.45M

+5.35M FIRST FLOOR SILL LVL


ENTRANCE PORCH

NON VEG KITCHEN


5.3M X 2M V V

W1 RESTAURANT
VEG KITCHEN
VEG KITCHEN
C3

+ 4.45M FIRST SLAB LVL

11
.3
3M

3M
.3
11
LVL +1.00 M LVL +1.00 M LVL +1.00 M LVL +1.00 M 3

2
1

greek coumn tensile fabric tensile fabric


design LVL +3.97 M
GROUNDDFLOOR PLAN
LVL -3.02 M LVL +2.47 M LVL +2.61 M
t.g. t.g. LVL +2.61 M LVL +2.47 M LVL -3.02 M KEY PLAN
LVL +0.00 M LVL +0.00 M LVL +0.00 M open open LVL -3.25 M
SCALE-1:400

exposed brickwork exposed brickwork + 0.45M PLINTH LVL


+ 0.00M GROUND LVL

ELEVATION AT D fixed toughned glass

SCALE-1:90

fixed toughned glass


OFFICERS CLUB
(PRESIDENT; HON.
COLLECTOR,LATUR DISTRICT)
+ 9.05M STAIRCASE WINDOW LINTEL LVL
+ 8.50M SECOND SLAB LVL TITLE
OF THE PROPOSED OFFICERS CLUB, LATUR
W
+ 7.55M STAIRCASE WINDOW SILL LVL PROJECT
lines represented
for curvature of column
LVL +0.00 M LVL +0.00 M
+ 6.85M FIRST FLOOR LINTEL LVL DRAWN CHECKED : KK
SCALE DATE:
window window
+5.35M FIRST FLOOR SILL LVL
+ 4.53M STAIRCASE WINDOW
+ 4.45M FIRST SLAB LVL LINTEL LVL consultants

LVL +1.50 M

tensile fabric Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,


tensile fabric Latur-413512,Maharashtra.
W
+ 3.05M STAIRCASE WINDOW SILL LVL Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in

t.g. t.g.
lines represented ARCHITECTS:
for curvature of column open open
4.50

LVL +1.50 M
KRISHNAKUMAR BANGAD
LVL +0.00 M LVL +0.00 M
FIIA, COA, FIV, IIID
LVL +1.50 M
CA/2004/32977
m.s.railing
exposed brickwork exposed brickwork + 0.45M PLINTH LVL
+ 0.00M GROUND LVL

fixed toughned glass

ELEVATION AT B
THIS IS A PRESENTATION DRAWING IT MAY BE MODIFIED DURING EXECUTION
MANHOLE WITH
BUILDING TYPE-
M.S. COVER
SHEET NO:
600MMX600MM
RESTAURANT
STAIRCASE DETAIL
RCC WATER TANK FOR
GENERAL USE
19,000 LTR. CAPACITY CAGE LADDER 0.20MM THK
MANHOLE WITH TITLE: WORKING DRAWING
GRANITE FOR TREAD
M.S. COVER
600MMX600MM
SPECIFICATIONS:

RCC WATER TANK FOR 0.30M

GENERAL USE
19,000 LTR. CAPACITY CAGE LADDER
WATER INLET
FROM UGT

12 MM THICK 20 MM THK.
INTERNAL PLASTER GRANITE
WATER OUTLET
FOR LANDING,
CAGE LADDER
0.15M THK RISER

3.64 x 3.50 x 1.50 CLEAR DEPTH


3.70 x 1.30 x 1.50 CLEAR DEPTH
WAIST SLAB

DOMESTIC TANK
FLUSHING TANK

(+)0.30 FREE BOARD

CAPACITY 19000 Ltr


(+)0.30 FREE BOARD

CAPACITY 7000 Ltr


B
THE FIXING DETAIL W 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

MANHOLE WITH 14

13 15

M.S. COVER W1
STORE
5.60M X 5.17M
12
11
16
17
10 18

600MMX600MM 9
8
19
20
7 21
COUNTER 6 22
2.3M X 2M 5 23
4 24
3 25
2 26
1
UP

MANHOLE WITH
C A
LVL +0.45M LVL +0.45M
ENTRANCE PORCH

NON VEG KITCHEN


5.3M X 2M V V

LADDER W1
VEG KITCHEN
RESTAURANT

PLAN AT O.H.T. LVL


VEG KITCHEN
C3

11
.3
3M

3M
.3
11
W 3

2
1

GROUNDDFLOOR PLAN
KEY PLAN
SCALE-1:400

1.50M 40
W W 41

0.30M

0.30M
39 40MM MORTOR
42

0.30M

0.30M
38
TERRACE SLAB +8.55M 3.19M 3.19M 43

0.30M

0.30M
37
44

0.30M

0.30M
52 36
51 45

0.30M

0.30M
TREAD=300MM 35
50
46

0.30M

0.30M
RISER=150MM 34

5.40M
49
47

0.30M

0.30M
48 14 40 33
47 1.50M 1.50M 48

0.30M

0.30M
32
13

0.30M

0.30M
46 15 41

0.30M

0.30M
39
49

0.30M

0.30M
45 12 31

0.30M

0.30M
16 42

0.30M

0.30M
44 38
50

0.30M

0.30M
30

5.49M

5.49M
11

0.30M

0.30M
17 43

0.30M

0.30M
43 37
51

0.30M

0.30M
42 29
10

0.30M

0.30M
18 44

0.30M

0.30M
36

0.30M

0.30M
MIDLANDING+6.04 M 41 28
9

0.30M

0.30M
19 45

0.30M

0.30M
40 35
39 8
27
DN
0.30M

0.30M
20 46

0.30M

0.30M
34
38 7

0.30M

0.30M
21 47 D4

0.30M

0.30M
33
37 6
0.30M

0.30M
22 48

0.30M

0.30M
36 32
5
0.30M

0.30M
35 23 49

0.30M

0.30M
LVL +8.40M
31
34 4 OFFICERS CLUB
0.30M

0.30M

24 50

0.30M

0.30M
33 30
3 (PRESIDENT; HON.
0.30M

0.30M

25 51

0.30M

0.30M
32 29
31 2 COLLECTOR,LATUR DISTRICT)
0.30M

0.30M

26 52

0.30M

0.30M
30
28
1
29
28
UP 27
TITLE
27
FIRST SLAB +4.50 M PROPOSED OFFICERS CLUB, LATUR
26 OF THE
TREAD=300MM
RISER=150MM
24
25
GROUND FLOOR PLAN FIRST FLOOR PLAN TERRACE PLAN PROJECT
23
22
DRAWN CHECKED : KK
21
20 SCALE DATE:
19
18 FINISHED PLASTER
17 LEVEL
MIDLANDING+2.01 M 16
15
BRICK WALL
consultants
14
13
12 GRANITE
11 0.20M Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,
10
SKIRTING FLUSHED WITH THE WALL Latur-413512,Maharashtra.
Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in
9
8
7
GRANITE ARCHITECTS:
6 5 FLOORING KRISHNAKUMAR BANGAD
5 40MM MORTOR
4
DETAIL A
3 FIIA, COA, FIV, IIID
2
1
+0.45M LVL CA/2004/32977
0.05 M

150 MM THK.RCC SLAB

SECTION RCC BEAM

DETAIL OF SKIRTING NOISING DETAIL


THIS IS A PRESENTATION DRAWING IT MAY BE MODIFIED DURING EXECUTION
DETAIL AT-X
BUILDING TYPE-
SHEET NO:
RESTAURANT

1.00M DOOR DETAIL

1.20M TITLE: WORKING DRAWING

SPECIFICATIONS:
C/L OF WALL

R.C.C. R.C.C.
0.75M RCC BEAM

0.30M
PLASTER

TOWER TOWER
FIXED GLASS
BOLT BOLT 'A' 'A'

DOOR DOOR GRANITE


FRAME
FRAME FRAME

19 mm granite
door frame
B

2.40M
35MM THK SHUTTER OF SOLID W 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

CORE FINISHED WITH BOTH


OUTSIDE OUTSIDE

2.10M
SIDE 1.5MM THK. 14

LAMINATE AS APPROVED STORE


13
12
11
15
16
17
W1 5.60M X 5.17M 10 18
9 19
8 20
7 21
COUNTER 6 22
2.3M X 2M 5 23
4 24
3 25
2 26
1
UP

GODREG LOCK WITH HANDLE


TADIPATTI TADIPATTI C A
LVL +0.45M LVL +0.45M
ENTRANCE PORCH

NON VEG KITCHEN


5.3M X 2M V V

W1 RESTAURANT
VEG KITCHEN
VEG KITCHEN

ALDROP ALDROP C3

11
.3
GRANITE DOOR FRAME

3M

3M
.3
11
SOLID CORE FLUSH DOOR 3

2
1

SINGLE LEAF SHUTTER WITH


LAMINATE ON BOTH SIDE
STOPPER STOPPER
GROUNDDFLOOR PLAN
FINISHED FINISHED KEY PLAN

OUTSIDE

INSIDE
FLOOR FLOOR SILL - 0.15 20MM TH. GRANITE STONE STRIP
SCALE-1:400
LEVEL LEVEL
5MM CLEARANCE
F.F.L F.F.L
INSIDE

ELEVATION OF MD ELEVATION SECTION D'-D'


SECTION - Y Y SECTION - Y Y
30 mm thk.
f. r. p. door
32MM THK. SOLID CORE hinge
FLUSH DOOR SHUTTER WITH VENEER 'D' X
INSIDE
INTERNAL INTERNAL INTERNAL

OUTSIDE 'D'
EXTERNAL
0.23M EXTERNAL
granite A.A.C.
1.00M door frame BLOCK WALL
SINGLE SHUTTER FIBRE DOOR
SECTION AT AA' (DOOR MD) SECTION AT AA' WITH GRANITE DOOR FRAME - D2( 0.75 X 2.60M )
OFFICERS CLUB
(PRESIDENT; HON.
COLLECTOR,LATUR DISTRICT)

LOCATION - MD ( 1.20M X 2.40M ) MAIN DOOR LOCATION - D1( 1.00 X 2.40 M ) ALL DOOR LOCATION-D2( 1.00 X 2.40 M ) ALL TOILET DOOR TITLE
OF THE PROPOSED OFFICERS CLUB, LATUR
D3( 0.75 X 2.40 M ) ALL TOILET DOOR PROJECT

DRAWN CHECKED : KK
LINTEL SCALE DATE:
S.NO NAME SIZE SPECIFICATION HINGE TOWER BOLT TADIPATTI HANDLE ALDROP
LVL
SIX HINGES OF 0.150 0.30 M LONG HEAVY 0.30 M LONG 0.30 M LONG 0.45 M LONG
1 MD 1.20MX2.40M 2.40 TEAK WOOD DOOR FRAME IN PANELLING TYPE OF THK 0.04 M AS SHOWN IN DRG AND INSTALLED AT SITE WITH THE USE OF ANCHOR M HEAVY DUTY DUTY BRASS PLATED HEAVY DUTY HEAVY DUTY HEAVY DUTY
FASTERNER OF REQUIRED STRENGTH AS APPROVED .DOUBLE LEAF PANELLED DOOR SHUTTER WITH TEAK WOOD STYLES ,TOP RAIL AND CHROME PLATED TWO TOWER BRASS PLATED BRASS PLATED BRASS PLATED consultants
INTERMEDIATE RAILS (IF REQUIRED)OF SIZE 100MMX40MM ,LOCK AND BOTTOM RAILOF SIZE 200MM X40MM WITH INSERT PANELS OF 19MM BOLT INTERNALLY INTERNALLY EXTERNAL EXTERNAL SIDE
THK BOTH SIDES WATER PROOF PLYWOOD WITH VENEER OF APPROVED MAKE.WITH FIXTURES OF APPROVED MAKE SIDE & INTERNAL
SIDE BOTH Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,
Latur-413512,Maharashtra.
Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in

TEAK WOOD DOOR FRAME IN PANELLING TYPE OF THK 0.04 M AS SHOWN IN DRG AND INSTALLED AT SITE WITH THE USE OF SIX HINGES OF 0.150 0.30 M LONG HEAVY 0.30 M LONG 0.30 M LONG 0.45 M LONG
1 D1 1.00MX2.40M 2.40 ANCHOR FASTERNER OF REQUIRED STRENGTH AS APPROVED M HEAVY DUTY DUTY BRASS PLATED HEAVY DUTY HEAVY DUTY HEAVY DUTY ARCHITECTS:
DOUBLE LEAF PANELLED DOOR SHUTTER WITH TEAK WOOD STYLES ,TOP RAIL AND INTERMEDIATE RAILS (IF REQUIRED)OF SIZE CHROME PLATED TWO TOWER BRASS PLATED BRASS PLATED BRASS PLATED
100MMX40MM ,LOCK AND BOTTOM RAILOF SIZE 200MM X40MM WITH INSERT PANELS OF 19MM THK BOTH SIDES WATER PROOF BOLT INTERNALLY INTERNALLY EXTERNAL EXTERNAL SIDE KRISHNAKUMAR BANGAD
PLYWOOD WITH VENEER OF APPROVED MAKE.WITH FIXTURES OF APPROVED MAKE SIDE & INTERNAL FIIA, COA, FIV, IIID
SIDE BOTH
CA/2004/32977
2 DOOR FRAME OF BLACK GRANITE WITH FULL BULLNOSING INSTALLED WITH SKILLED LABOUR WITH ARALDITE AS APPROVED THREE HINGES OF 0.20 M LONG HEAVY 0.20 M LONG 0.15 M LONGHEAVY 0.30 M LONG
D2 1.00MX2.40M 2.40
32 MM THK SOLID CORE FLUSH DOOR OF WATERPROOF GRADE WITH LAMINATE OF BOTH SIDES OF WENGE DESIGN 0.125M HEAVY DUTY DUTY CROME PLATED HEAVY DUTY M.S DUTY M.S CROME HEAVY DUTY M.S
CHROME PLATED ONE TOWERBOLT CROME PLATED PLATED EXTERNALSIDE CHROME PLATED
INTERNALLY INTERNALLY & INTERNAL SIDE BOTH EXTERNAL SIDE
2 DOOR FRAME OF BLACK GRANITE WITH FULL BULLNOSING INSTALLED WITH SKILLED LABOUR WITH ARALDITE AS APPROVED THREE HINGES OF 0.20 M LONG HEAVY 0.20 M LONG 0.15 M LONGHEAVY 0.30 M LONG
D3 0.75MX2.40M 2.40
32 MM THK SOLID CORE FLUSH DOOR OF WATERPROOF GRADE WITH LAMINATE OF BOTH SIDES OF WENGE DESIGN 0.125M HEAVY DUTY DUTY CROME PLATED HEAVY DUTY M.S DUTY M.S CROME HEAVY DUTY M.S
CHROME PLATED ONE TOWERBOLT CROME PLATED PLATED EXTERNALSIDE CHROME PLATED
INTERNALLY INTERNALLY & INTERNAL SIDE BOTH EXTERNAL SIDE

THIS IS A PRESENTATION DRAWING IT MAY BE MODIFIED DURING EXECUTION


BUILDING TYPE-
SHEET NO:
RESTAURANT
WINDOW DETAIL

R.C.C. BEAM
0.60M TITLE: WORKING DRAWING

SPECIFICATIONS:
100
EXHAUST FAN
300X300MM

1.25
FIX GLASS
EQ.

0.90M
10X10MM SQ. BARS
WELDED TO FLATS
TYP)
M.S. GRILL
C' C'
EQ.

GLASS LOUVERS

UPVC FRAME 2.00


outside

WINDOW SCHEDULE FOR THE FIRST, SECOND, THIRD FLOOR PLAN:


SECTION
inside

ELEVATION SR. NAME SIZE TOTAL SILL@ LINTEL@ LOCATION SPECIFICATIONS(refer details)
100

AT A A 1 W 3.00X1.50 4 0.90 M 2.40M STAIRCASE UPVC.SLIDING WINDOW


2 W1 2.00X1.50 2 0.90 M 2.40M KITCEHEN, STORE UPVC.SLIDING WINDOW
RCC LINTEL
75MM THK. outside LOCATION - MS GRILL DOOR 3 V 0.60X0.90 4 1.50 M 2.40M TOILET GLASS LOUVERS

ELEVATION SILL LINTEL SPECIFICATION WINDOW SCHEDULE FOR FIRST & SECONDFLOOR
SCALE- 1:100 NAME SIZE LVL LVL
SECTION D'-D' 1 W 3.00M X 1.50M 0.90M 2.40 M IVORY POWDER COATED ONE OPENABLE AND
SCALE- 1:100
TWO FIXED THREE TRACK UPVC SLIDING
DETAIL B WINDOWS (2+ 1 MOSQUITO NET) WITH SHUTTER
inside
WITH M.S.GRILL [EVERY SHUTTER - 0.5XWIDTH OF
R.C.C. BEAM
WINDOW ] 20 MM THICK MIRROR POLISHED
BLACK GRANITE SILL 100 MM WIDE WITH
PLASTER ROUNDED NOSING ON INTERNAL SIDE& EXTERNAL
0.10M

SIDE
outside IVORY POWDER COATED THREE TRACK UPVC
2 W1 2.00M X 1.50M 0.90M 2.40 M
ALUMINUM FRAME GRANITE FRAME SLIDING WINDOWS (2+ 1 MOSQUITO NET) WITH
FIX GLASS 10X10MM SQ.BARS SHUTTER WITH M.S.GRILL [EVERY SHUTTER -
GLASS LOUVERS WELDED TO FLATS 0.5XWIDTH OF WINDOW ] 20 MM THICK MIRROR
SCALE- 1:100
TYP) POLISHED BLACK GRANITE SILL 100 MM WIDE WITH
M.S. GRILL ROUNDED NOSING ON INTERNAL SIDE& EXTERNAL
SIDE
PLAN AT. C'-C'

4 V 0.60M X 0.90M 1.50M 2.40 M POWDER COATED UPVC FIXED


ANODIZED ALUMINUM LOUVERED VENTILATORS WITH M.S. GRILL OFFICERS CLUB
PANNEL WITH ADJUSTABLE LOUVERS (PRESIDENT; HON.
AND EXHAUST FAN VENTILATORS - V = 0.60M X 0.9M. VENTILATORS AND M.S. GRILLS COLLECTOR,LATUR DISTRICT)

TITLE
OF THE PROPOSED OFFICERS CLUB, LATUR
PROJECT

DRAWN CHECKED : KK
SCALE DATE:

consultants

Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,


Latur-413512,Maharashtra.
Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in

ARCHITECTS:
KRISHNAKUMAR BANGAD
FIIA, COA, FIV, IIID
CA/2004/32977

THIS IS A PRESENTATION DRAWING IT MAY BE MODIFIED DURING EXECUTION


BUILDING TYPE-
SHEET NO:
RESTAURANT
FIRST FLOOR BEAM SCHEDULE
EXTRA
STAIRCASE DETAIL FIRST FLOOR PLAN
STIRRUPS
STIRRUPSB
BEAM MKD. SIZE BOTT. REIN TOP REIN @CONT. BOTH END REMARK
(L/3 from support)
ALANCE MID TITLE: SLAB & BEAM & STAIRCASE DETAILS
SUPP.
F.F LVL. MB1 125THK. LANDING
B1,2,12 300X450 2-T16+2-T20 2-T16 2-T20 T8@150c/c T8@200c/c -------- 76 LVL.
0. SPECIFICATIONS:
B3,25 300X450 2-T20 2-T16 4-T20 T8@150c/c T8@150c/c CANT. 0.8
3
B4,5,6,5B,11 230X450 2-T16 2-T12 -------- T8@200c/c T8@200c/c --------
125THK.
B5A 300X450 3-T16 2-T12 -------- T8@200c/c T8@200c/c -------- 125THK. F.F.BEAM
T8@200c/c
B7 300X450 4-T20 2-T16 2-T20 T8@100c/c T8@150c/c --------
MB1 MID T10@125c/c
B8 300X450 2-T20 2-T16 -------- T8@200c/c T8@200c/c -------- LANDING T10@125c/c
B9,23 T8@200c/c T8@200c/c LVL. T8@200c/c
300X450 2-T20 2-T16 2-T20 -------- 0.7
T8@200c/c 6
B10 300X450 4-T20 2-T16 2-T16 T8@100c/c T8@150c/c --------
B13 300X450 2-T16+2-T20 2-T16 -------- T8@150c/c T8@200c/c -------- T10@125c/c
A B T10@125c/c PL.LVL.
125THK. T8@200c/c
B14 300X450 2-T20+1-T16 2-T12 2-T20 T8@200c/c T8@200c/c -------- MB1 PB8
T8@100c/c T8@150c/c SECTION-BB
B15 300X450 2-T20 2-T12 2-T20 --------
SECTION-AA
B16,24 300X450 2-T20+2-T16 2-T12 -------- T8@150c/c T8@200c/c --------
B17 150X300 2-T12 2-T12 -------- T8@200c/c T8@200c/c --------
B18,19,21 300X450 4-T20 2-T16 -------- T8@150c/c T8@150c/c --------
B20 230X450 2-T12 2-T12 -------- T8@200c/c T8@200c/c --------
B22 300X450 2-T20+2-T16 2-T12 2-T20 T8@150c/c T8@200c/c --------
B26 300X450 2-T20 2-T16 2-T20 T8@150c/c T8@150c/c --------
B27 300X450 2-T20+2-T16 2-T16 -------- T8@150c/c T8@200c/c --------
A B
B28 300X675 5-T25 4-T20 -------- T8@150c/c T8@150c/c 2-T12@EFOB
B29,32 450X675 8-T25 4-T20 -------- T8@150c/c T8@150c/c 4-lagged
B30,31,33 450X675 2-T25 2-T20 -------- T8@150c/c T8@150c/c cant(4-lgd)
STAIRCASE PLAN @ MIDLANDING LVL.
NOTE :

FIRST FLOOR SLAB SCHEDULE


SLAB
THK.
SHORT SPAN LONG SPAIN
STAIRCASE PLAN @ MIDLANDING LVL.
DIST.REIN. REMARK SLAB
a/4 b/4
SLAB
MKD REIN. REIN
T10@175C/C DESHUTTERING PERIOD
S1 125 T8@200C/C T8@200C/C ONE WAY
ALT BENT SPAN IN M UP TO 4.5 M ABOVE 4.5 M ABOVE 6.0 M
T10@125C/C a/7 a/5 b/5 b/7
S2 125 T8@200C/C T8@200C/C ONE WAY
ALT BENT CLEAR SPAN(a) CLEAR SPAN(b)
SLAB 7 DAYS 14 DAYS 14 DAYS
T8@150C/C END SUPP. STRUCTURAL CONSULTANT
S3 125 T8@200C/C T8@200C/C ONE WAY
END SUPP. CONTINUS SUPP. BEAM 14 DAYS 21 DAYS 21 DAYS
ALT BENT
T10@200C/C T10@200C/C SANJAY JATHADE M.TECH.(STR)
S4 125 T8@200C/C TWO WAY BAR BENDING IN SLAB (ALT.BENT) 'ROYAL PLAZA'COMPLEX F.FLOOR,S.NO.12,MURARGI PETH
ALT BENT ALT BENT L1 BEHIND BHAGWAT PETROL PUMP.SOLAPUR-413001
S5 100 T8@200C/C T8@200C/C T8@200C/C ONE WAY CELL.9423589358 Email-sanjay_ jathade@rediffmail.com

L1 L2 BAR BENDING IN SLAB (ALT.BENT) L1 L2 OFFICERS CLUB


L1/3 OR 65XDIA.OF BAR L2/3 OR 65XDIA.OF BAR L1 L1/3 OR 65XDIA.OF BAR L2/3 OR 65XDIA.OF BAR (PRESIDENT; HON.
WHICHEVER IS MAX. WHICHEVER IS MAX. WHICHEVER IS MAX. WHICHEVER IS MAX. COLLECTOR,LATUR DISTRICT)
L1 OR 65XDIA OF WHICHEVER IS
EXTRA REIN. EXTRA REIN.
TOP BAR MAX. TOP BAR
AT CONT.SUPP. TOP REIN. AT CONT.SUPP.
TOP REIN. TITLE
TOP REIN. TOP REIN.
OF THE PROPOSED OFFICERS CLUB, LATUR
PROJECT
BOTT REIN. BOTT REIN.
BOTT REIN. BOTT REIN. BOTTOM BAR BOTTOM BAR DRAWN CHECKED : KK
STIRRUPS STIRRUPS
END SUPP. CONTINUS SUPP. END SUPP. DATE:
STIRRUPS STIRRUPS SCALE
END SUPP. CONTINUS SUPP. END SUPP. STIRRUPS STIRRUPS
TYP.CONT.BEAM
TYP.CANT.BEAM (STAIRCASE DETAIL)
TYP.CONTINOUS BEAM consultants

NOTE: Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,


Latur-413512,Maharashtra.
DO NOT SCALE THE DRAWING FOR CANTILEVER BEAMS TOP REINFORCEMENT TO BE ANCHORED BEHIND FOR FOR BEAMS HAVING WIDTH OF 6" [150 MM] PROVIDE ONLY TWO WE SHALL NOT REMAIN RESPONSIBLE FOR Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in

FOUNDATION TO REST ON HARD STRATA 60 X D OR SPAN OF CANTILEVER WHICHEVER IS GREATER.[ D = DIA. OF BAR ] BARS IN ANY ONE LAYER & FOR BEAMS HAVING WIDTH OF 1) CONCRETE MIX, QUALITY, SHUTTERING, CURING, SUBSTANDARD CONSTRUCTION
MINIMUM DEPTH OF EXCAVATION SHOULD BE 1.5M BAR BENDING SHOULD BE AS PER DETAILS GIVEN. 9" [230 MM] PROVIDE ONLY THREE BARS IN ANY ONE LAYER. MATERIAL, WORKMANSHIP & FAULTY CONSTRUCTION PROCEDURE . ARCHITECTS:
CONCRETE AS PER DESIGN MIX UNLESS SPECIFIED LAP LENGTH FOR i] BEAMS & SLABS = 60 X D [ D = DIAMETER OF BAR ] 2) SAFETY OF OLD STRUCTURE DURING DEMOLITION AND SAFETY OF ABUTTING KRISHNAKUMAR BANGAD
PROPER CHAIRS TO BE PROVIDED TO ENSURE SPECIFIED THICKNESS
BASIC REFERENCE CODE IS 456-2000(1-2-3-4 EDITION) ii] COLUMNS = 45 X D [ D = DIAMETER OF BAR ] STRUCTURE / BUILDING. ANY ACCIDENT OCCURRING DUE TO CONSTRUCTION
OF SLAB TO RETAIN THE TOP BARS IN PROPER POSITION & ALSO
CONCRETE GRADE SHALL BE M20 ALL LAPS SHOULD BE STAGGERED & NOT MORE THAN 50% BARS TO BE PROVIDE PROPER COVERING & PINS FOR BEAM REINFORCEMENT OF ELEMENT OF BUILDING NOT DESIGNED BY US. FIIA, COA, FIV, IIID
EARTHQUAKE ZONE SPECIFIED IN IS 1893:2016-3rd ZONE LAPPED AT ANY GIVEN SECTION. FIRST STIRRUPS IN BEAM SHOULD START FROM ITS FACE CA/2004/32977
DUCTILE DESIGN TO SEISMIC FORCES IN IS 13920:2016 ALL COLUMNS OF FRAME SHOULD BE TIED IN BOTH DIRECTIONS BY TIE BEAMS/ OF SUPPORT [ i.e. FROM COLUMN OR BEAM FACE. ] PROPER PRECAUTIONS SHOULD BE TAKE BY SHORING, STRUTTING ETC.
'T' INDICATES TOR STEEL OF GRADE Fe 500 /PLINTH BEAMS AT GROUND LEVEL/PLINTH LEVEL.EVEN IF HEIGHT OF COLUMNS TO MAINTAIN THE STABILITY OF ABUTTING STRUCTURES. STRUCTURAL
OF GRADE Fe 250 N/mm2 IS WITHIN MAXIMUM ALLOWABLE HEIGHT LIMITS. PROVIDE LINKS FOR COLUMN REINFORCEMENT IN JUNCTION OF CONSULTANT SHOULD BE INFORMED IF ANY GUIDANCE IS REQUIRED
AT ANY LEVEL WHERE COLUMN SIZE GETS REDUCED IN EITHER DIMENSIONS, COLUMN, BEAMS & SLABS AS PER LINKS SPACING MENTIONED
SBC OF SOIL ASSUMED AS 30 T/m2 FOR THE SAME.
TIE OR PLINTH BEAMS ARE REQUIRED. IN OUR DRAWING.
CLEAR COVER TO MAIN REIN. SUPERVISION, IF SPECIFICALLY ASKED FOR, WILL BE PROVIDED TO THE
IF FOOTINGS OVERLAP EACH OTHER, NECESSARY REVISION SHOULD BE OUR RESPONSIBILITY SHALL REMAIN LIMITED TO SAFE AND SOUND
FOOTING 40mm, COLUMN 25mm BEAM 35mm, SLAB 20mm EXTENT OF VERIFICATION OF REINFORCEMENT ON SITE BUT RESPONSIBILITY
OBTAINED FROM OUR OFFICE. STRUCTURAL DESIGN.
MINIMUM CEMENT CONTENT & MAXIMUM DO NOT CAST ANY R.C.C. WORK UNLESS IT IS CHECKED AND REGARDING CORRECT & SOUND CONSTRUCTION SHALL SOLELY REST WITH
ALL STRUCTURAL CONCRETE SHALL BE WEIGHT BATCHED, CONTRACTOR / BUILDER / OWNER .
W/C RATIO USED FOR FOUNDATION CONCRETE SHOULD BE CONFIRMED BY R.C.C. DESIGNER
COLUMNS ORIENTATION AS PER ARCHITECTURAL CENTER LINE PLAN. MACHINE MIXED AND MECHANICALLY VIBRATED.
AS PER CLASUSE 1.2,8.2,4.1,9.1.2 (TABLE-5) OF ANY DISCREPANCY BETWEEN OUR DRAWING & ARCHITECTS DRAWING
BASIC REFERENCE CODE IS 456-2000(1-2-3-4 EDITION) ALL REIN.SHALL BE BENT UP AS SHOWN TO SATISFY THE SHALL BE BROUGHT TO OUR NOTICE BEFORE EXECUTION OF WORK,
THE DEVELOPMENT LENGTH CRITERIA AS PER 465/2000 DESHUTTERING PERIOD
DESHUTTERING PERIOD DO NOT SCALE THE DRAWING.
(FOR DEVELOPMENT LENGTH REFER SECT-DD) SPAN IN M UP TO 4.5 M ABOVE 4.5 M ABOVE 6.0 M
SPAN IN M UP TO 4.5 M ABOVE 4.5 M ABOVE 6.0 M 7 DAYS 14 DAYS 14 DAYS FORMWORK OF CANTILEVER CANOPY, CHAJJA ETC. SHOULD NOT BE
SLAB
SLAB 7 DAYS 14 DAYS 14 DAYS IF THERE ANY DEVIATION,REFERANCE SHALL BE MADE TO REMOVED WITHOUT PERMISSION OF THE STRUCTURAL CONSULTANT.
BEAM 14 DAYS 21 DAYS 21 DAYS
BEAM 14 DAYS 21 DAYS 21 DAYS THIS OFFICE BEFOR EXECUTION
THIS IS A PRESENTATION DRAWING IT MAY BE MODIFIED DURING EXECUTION
BUILDING TYPE-
SHEET NO:
RESTAURANT
SECOND FLOOR PLAN

TITLE:R.C.C PLAN FOR SECOND FLOOR & ITS DETAILS

SPECIFICATIONS:

SECOND FLOOR SLAB SCHEDULE


SLAB SHORT SPAN LONG SPAIN
THK. DIST.REIN. REMARK
MKD REIN. REIN
T10@175C/C
S1 125 T8@200C/C T8@200C/C ONE WAY
ALT BENT
T10@125C/C
S2 125 T8@200C/C T8@200C/C ONE WAY
SECOND FLOOR PLAN ALT BENT
T8@150C/C
S3 125 T8@200C/C T8@200C/C ONE WAY
SCALE-1:90 ALT BENT
T10@200C/C T10@200C/C
S4 125 T8@200C/C TWO WAY
ALT BENT ALT BENT
SECOND FLOOR BEAM SCHEDULE a/4 b/4
S5 100 T8@200C/C T8@200C/C T8@200C/C ONE WAY
EXTRA a/4 b/4
STIRRUPS SLAB SLAB
STIRRUPSB
BEAM MKD. SIZE BOTT. REIN TOP REIN @CONT. BOTH END REMARK
(L/3 from support)
ALANCE
SUPP.
B1,2,12 300X450 2-T16+2-T20 2-T16 2-T20 T8@150c/c T8@200c/c -------- STRUCTURAL CONSULTANT
a/7 a/5 b/5 b/7
B3,25 300X450 2-T20 2-T16 4-T20 T8@150c/c T8@150c/c CANT. CLEAR SPAN(a) CLEAR SPAN(b) SANJAY JATHADE M.TECH.(STR)
END SUPP. END SUPP.
B4,5,11 230X450 2-T16 2-T12 -------- T8@200c/c T8@200c/c -------- CONTINUS SUPP.
'ROYAL PLAZA'COMPLEX F.FLOOR,S.NO.12,MURARGI PETH
B6 230X450 2-T16 2-T16 -------- T8@200c/c T8@200c/c -------- BAR BENDING IN SLAB (ALT.BENT) BEHIND BHAGWAT PETROL PUMP.SOLAPUR-413001
CELL.9423589358 Email-sanjay_ jathade@rediffmail.com
B7 300X450 4-T20 2-T16 2-T20 T8@100c/c T8@150c/c -------- L1
B8 300X450 2-T20 2-T16 -------- T8@200c/c T8@200c/c -------- L1 OR 65XDIA OF WHICHEVER IS OFFICERS CLUB
TOP BAR MAX. TOP BAR
B9,23 300X450 2-T20 2-T16 2-T20 T8@200c/c T8@200c/c -------- (PRESIDENT; HON.
COLLECTOR,LATUR DISTRICT)
B10 300X450 4-T20 2-T16 2-T16 T8@100c/c T8@150c/c --------
B13 300X450 2-T16+2-T20 2-T16 -------- T8@150c/c T8@200c/c -------- BOTTOM BAR TITLE
BOTTOM BAR PROPOSED OFFICERS CLUB, LATUR
B14 300X450 2-T20+1-T16 2-T12 2-T20 T8@200c/c T8@200c/c -------- OF THE
STIRRUPS STIRRUPS PROJECT
B15 300X450 2-T20 2-T12 2-T20 T8@100c/c T8@150c/c --------
TYP.CANT.BEAM DRAWN CHECKED : KK
B16,24 300X450 2-T20+2-T16 2-T12 -------- T8@150c/c T8@200c/c -------- L1 L2
B18,19,21 T8@150c/c T8@150c/c SCALE DATE:
300X450 4-T20 2-T16 -------- -------- L1/3 OR 65XDIA.OF BAR L2/3 OR 65XDIA.OF BAR
WHICHEVER IS MAX. WHICHEVER IS MAX.
B20 230X450 2-T12 2-T12 -------- T8@200c/c T8@200c/c -------- EXTRA REIN.
B22 300X450 2-T20+2-T16 2-T12 2-T20 T8@150c/c T8@200c/c -------- TOP REIN. AT CONT.SUPP. TOP REIN.
consultants
B26 300X450 2-T20 2-T16 2-T20 T8@150c/c T8@150c/c --------
B27 300X450 2-T20+2-T16 2-T16 -------- T8@150c/c T8@200c/c -------- BOTT REIN. BOTT REIN. Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,
B28 300X675 5-T25 4-T20 -------- T8@150c/c T8@150c/c 2-T12@EFOB STIRRUPS STIRRUPS Latur-413512,Maharashtra.
Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in
END SUPP. CONTINUS SUPP. END SUPP.
B29,32 450X675 8-T25 4-T20 -------- T8@150c/c T8@150c/c 4-lagged
TYP.CONTINOUS BEAM ARCHITECTS:
B30,31,33 450X675 2-T25 2-T20 -------- T8@150c/c T8@150c/c cant(4-lgd)
KRISHNAKUMAR BANGAD
NOTE : FIIA, COA, FIV, IIID
DO NOT SCALE THE DRAWING FOR CANTILEVER BEAMS TOP REINFORCEMENT TO BE ANCHORED BEHIND FOR FOR BEAMS HAVING WIDTH OF 6" [150 MM] PROVIDE ONLY TWO WE SHALL NOT REMAIN RESPONSIBLE FOR
FOUNDATION TO REST ON HARD STRATA 60 X D OR SPAN OF CANTILEVER WHICHEVER IS GREATER.[ D = DIA. OF BAR ] BARS IN ANY ONE LAYER & FOR BEAMS HAVING WIDTH OF 1) CONCRETE MIX, QUALITY, SHUTTERING, CURING, SUBSTANDARD CONSTRUCTION CA/2004/32977
MINIMUM DEPTH OF EXCAVATION SHOULD BE 1.5M BAR BENDING SHOULD BE AS PER DETAILS GIVEN. 9" [230 MM] PROVIDE ONLY THREE BARS IN ANY ONE LAYER. MATERIAL, WORKMANSHIP & FAULTY CONSTRUCTION PROCEDURE .
CONCRETE AS PER DESIGN MIX UNLESS SPECIFIED LAP LENGTH FOR i] BEAMS & SLABS = 60 X D [ D = DIAMETER OF BAR ] 2) SAFETY OF OLD STRUCTURE DURING DEMOLITION AND SAFETY OF ABUTTING
PROPER CHAIRS TO BE PROVIDED TO ENSURE SPECIFIED THICKNESS
BASIC REFERENCE CODE IS 456-2000(1-2-3-4 EDITION) ii] COLUMNS = 45 X D [ D = DIAMETER OF BAR ] STRUCTURE / BUILDING. ANY ACCIDENT OCCURRING DUE TO CONSTRUCTION
OF SLAB TO RETAIN THE TOP BARS IN PROPER POSITION & ALSO
CONCRETE GRADE SHALL BE M20 ALL LAPS SHOULD BE STAGGERED & NOT MORE THAN 50% BARS TO BE PROVIDE PROPER COVERING & PINS FOR BEAM REINFORCEMENT OF ELEMENT OF BUILDING NOT DESIGNED BY US.
EARTHQUAKE ZONE SPECIFIED IN IS 1893:2016-3rd ZONE LAPPED AT ANY GIVEN SECTION. FIRST STIRRUPS IN BEAM SHOULD START FROM ITS FACE
DUCTILE DESIGN TO SEISMIC FORCES IN IS 13920:2016 ALL COLUMNS OF FRAME SHOULD BE TIED IN BOTH DIRECTIONS BY TIE BEAMS/ OF SUPPORT [ i.e. FROM COLUMN OR BEAM FACE. ] PROPER PRECAUTIONS SHOULD BE TAKE BY SHORING, STRUTTING ETC.
'T' INDICATES TOR STEEL OF GRADE Fe 500 /PLINTH BEAMS AT GROUND LEVEL/PLINTH LEVEL.EVEN IF HEIGHT OF COLUMNS TO MAINTAIN THE STABILITY OF ABUTTING STRUCTURES. STRUCTURAL
OF GRADE Fe 250 N/mm2 IS WITHIN MAXIMUM ALLOWABLE HEIGHT LIMITS. PROVIDE LINKS FOR COLUMN REINFORCEMENT IN JUNCTION OF CONSULTANT SHOULD BE INFORMED IF ANY GUIDANCE IS REQUIRED
AT ANY LEVEL WHERE COLUMN SIZE GETS REDUCED IN EITHER DIMENSIONS, COLUMN, BEAMS & SLABS AS PER LINKS SPACING MENTIONED
SBC OF SOIL ASSUMED AS 30 T/m2 FOR THE SAME.
TIE OR PLINTH BEAMS ARE REQUIRED. IN OUR DRAWING.
CLEAR COVER TO MAIN REIN. SUPERVISION, IF SPECIFICALLY ASKED FOR, WILL BE PROVIDED TO THE
IF FOOTINGS OVERLAP EACH OTHER, NECESSARY REVISION SHOULD BE OUR RESPONSIBILITY SHALL REMAIN LIMITED TO SAFE AND SOUND
FOOTING 40mm, COLUMN 25mm BEAM 35mm, SLAB 20mm EXTENT OF VERIFICATION OF REINFORCEMENT ON SITE BUT RESPONSIBILITY
OBTAINED FROM OUR OFFICE. STRUCTURAL DESIGN.
MINIMUM CEMENT CONTENT & MAXIMUM DO NOT CAST ANY R.C.C. WORK UNLESS IT IS CHECKED AND REGARDING CORRECT & SOUND CONSTRUCTION SHALL SOLELY REST WITH
ALL STRUCTURAL CONCRETE SHALL BE WEIGHT BATCHED, CONTRACTOR / BUILDER / OWNER .
W/C RATIO USED FOR FOUNDATION CONCRETE SHOULD BE CONFIRMED BY R.C.C. DESIGNER
COLUMNS ORIENTATION AS PER ARCHITECTURAL CENTER LINE PLAN. MACHINE MIXED AND MECHANICALLY VIBRATED.
AS PER CLASUSE 1.2,8.2,4.1,9.1.2 (TABLE-5) OF ANY DISCREPANCY BETWEEN OUR DRAWING & ARCHITECTS DRAWING
BASIC REFERENCE CODE IS 456-2000(1-2-3-4 EDITION) ALL REIN.SHALL BE BENT UP AS SHOWN TO SATISFY THE SHALL BE BROUGHT TO OUR NOTICE BEFORE EXECUTION OF WORK,
THE DEVELOPMENT LENGTH CRITERIA AS PER 465/2000 DESHUTTERING PERIOD
DESHUTTERING PERIOD DO NOT SCALE THE DRAWING.
(FOR DEVELOPMENT LENGTH REFER SECT-DD) SPAN IN M UP TO 4.5 M ABOVE 4.5 M ABOVE 6.0 M
SPAN IN M UP TO 4.5 M ABOVE 4.5 M ABOVE 6.0 M FORMWORK OF CANTILEVER CANOPY, CHAJJA ETC. SHOULD NOT BE
SLAB 7 DAYS 14 DAYS 14 DAYS THIS IS A PRESENTATION DRAWING IT MAY BE MODIFIED DURING EXECUTION
SLAB 7 DAYS 14 DAYS 14 DAYS IF THERE ANY DEVIATION,REFERANCE SHALL BE MADE TO REMOVED WITHOUT PERMISSION OF THE STRUCTURAL CONSULTANT.
BEAM 14 DAYS 21 DAYS 21 DAYS
BEAM 14 DAYS 21 DAYS 21 DAYS THIS OFFICE BEFOR EXECUTION
BUILDING TYPE-
SHEET NO:
RESTAURANT
FOUNDATION & FIRST FLOOR PLAN

T.B
TITLE:R.C.C PLAN FOR FOUNDATION AND FIRST FLOOR

2A
PB
SPECIFICATIONS:

T.B T.B T.B

2
PB
T.B
T.B T.B T.B C13

T.B
T.B T.B T.B

C6
T.B T.B T.B

C7 T.B

2A
PB
T.B T.B

PB
2A

T.B

B3 STRUCTURAL CONSULTANT
1

0
B3
SANJAY JATHADE M.TECH.(STR)
B12 B13
'ROYAL PLAZA'COMPLEX F.FLOOR,S.NO.12,MURARGI PETH
BEHIND BHAGWAT PETROL PUMP.SOLAPUR-413001
S4
CELL.9423589358 Email-sanjay_ jathade@rediffmail.com

OFFICERS CLUB
FIRST FLOOR BEAM SCHEDULE (PRESIDENT; HON.
COLLECTOR,LATUR DISTRICT)
B19 B19 S4 S4
B16 S1 S1 S1 B24 B3
9

B27
B2

2
TITLE
OF THE PROPOSED OFFICERS CLUB, LATUR
PROJECT
S4 S4 S4 DRAWN CHECKED : KK
B9
C10
SCALE DATE:

B2
B10 B11

8
8

B2
B2

B20 S3 8 B3
B15 3
B7 B8 B23
S2 S4
S4 S4 consultants
B26 S4
B17

C5 S5 S5 B5B

3
B3
8

Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,


B5A
B2

Latur-413512,Maharashtra.
B6 S1 Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in
B17

S5 S5 S4
C9
S4 S4 C8
S1 B21 ARCHITECTS:
B14 B22
B18 B5 KRISHNAKUMAR BANGAD
B4
8

FIIA, COA, FIV, IIID


B2
B2

S1 S2 B25
8

S1 CA/2004/32977
S4
S4
2
B3

B2
B1 B2 C4 B3 9

S4

FIRST FLOOR PLAN


SCALE-1:90
1

B3
B3

0
THIS IS A PRESENTATION DRAWING IT MAY BE MODIFIED DURING EXECUTION
BUILDING TYPE-
SHEET NO:
RESTAURANT
COLUMN & FOOTING SCHEDULE
FOUNDATION PLAN

SECOND FLOOR (COL.SIZE) (MAIN REIN.) (COL.SIZE) (MAIN REIN.) (COL.SIZE) (MAIN REIN.) (COL.SIZE) (MAIN REIN.)
TITLE: COLUMN & FOOTING DETAILS
TO (450X450) (12-T20) (300X450) (4-T16+4-T12) (300X450) (8-T16) (300X450) (10-T16)
FIRST FLOOR (STIRRUPS) (STIRRUPS) (STIRRUPS) (STIRRUPS)
(T8@150C/C) (T8@150C/C) (T8@150C/C) (T8@150C/C) SPECIFICATIONS:
450 300 300 300 300
12-T20 8-T16 12-T12 8-T16 8-T16
FOOTING TOP 2-T16
TO 450 450 450 530 530
FIRST FLOOR
T8@150c/c T8@150c/c T8@150c/c T8@150c/c T8@150c/c

FOOTING SIZE(LXB) 1.98X1.98 1.67X1.44 1.37X1.37 1.75X1.44 1.82X1.52


D 500 450 450 450 500
REIN.PARALLELTO 'L' 16-T12 11-T10 10-T10 12-T10 12-T10
REIN.PARALLELTO 'B' 16-T12 13-T10 10-T10 14-T10 15-T10
P.C.C 2.13X2.13X100 1.82X1.60X100 1.52X1.52X100" 1.90X1.60X100 1.98X1.67X100
COLUMN MKD. C1,C2,C7,C8,12 C9,C14 C10,C15,C20,C21 C11,C16,C17
C3,C4,C5,C6
C13,C18,C19 C22, C23
PLINTH BEAM SCHEDULE

PLINTH BEAM SCHEDULE


EXTRA STIRRUPS STIRRUPSB
BEAM MKD. SIZE BOTT. REIN TOP REIN @CONT. BOTH END
ALANCE
REMARK COLUMN & FOOTING SCHEDULE
SUPP. (L/3 from support)
300
PB1 300X380 2-T16 2-T12 2-T20+2-T16 T8@150c/c T8@150c/c CANT.
FOOTING TOP 4-T12
PB2,7,11,12,15,16 300X380 2-T16 2-T12 2-T16 T8@150c/c T8@200c/c -------- TO
PB2A 300X380 2-T16 2-T12 2-T20+2-T16 T8@150c/c T8@200c/c -------- 300
PLINTH LVL.
PB3,9,9A 300X380 3-T16 2-T12 2-T16 T8@150c/c T8@200c/c --------
PB4,13,17,18 300X380 4-T16 2-T12 -------- T8@150c/c T8@200c/c --------
PB5 230X380 2-T12 2-T12 -------- T8@200c/c T8@200c/c -------- FOOTING SIZE(LXB) 0.91X0.91
D 300
PB6,7A 300X380 4-T16 2-T12 2-T16 T8@150c/c T8@200c/c --------
REIN.PARALLELTO 'L' 6-T10
PB6A,8,10 300X380 2-T16 2-T12 -------- T8@200c/c T8@200c/c --------
REIN.PARALLELTO 'B' 6-T10
PB14 230X380 2-T16+1-T12 2-T12 -------- T8@200c/c T8@200c/c -------- STRUCTURAL CONSULTANT
P.C.C 1.06X1.06X100
PB19 230X380 2-T16 2-T12 -------- T8@200c/c T8@200c/c -------- COLUMN MKD. SC1 SANJAY JATHADE M.TECH.(STR)
T.B 230X380 2-T12 2-T12 -------- T8@200c/c T8@200c/c -------- 'ROYAL PLAZA'COMPLEX F.FLOOR,S.NO.12,MURARGI PETH
MB1 230X450 2-T16 2-T12 -------- T8@150c/c T8@150c/c -------- BEHIND BHAGWAT PETROL PUMP.SOLAPUR-413001
L1 L2
CELL.9423589358 Email-sanjay_ jathade@rediffmail.com
L1

OFFICERS CLUB
(PRESIDENT; HON.
L1 L2 COLLECTOR,LATUR DISTRICT)
L1
L1/3 OR 65XDIA.OF BAR L2/3 OR 65XDIA.OF BAR
L1 OR 65XDIA OF WHICHEVER IS WHICHEVER IS MAX. WHICHEVER IS MAX. TITLE
MAX.
OF THE PROPOSED OFFICERS CLUB, LATUR
TOP BAR TOP BAR EXTRA REIN.
AT CONT.SUPP. PROJECT
TOP REIN. TOP REIN.
DRAWN CHECKED : KK
SCALE DATE:
BOTTOM BAR BOTTOM BAR BOTT REIN. BOTT REIN.
STIRRUPS STIRRUPS
STIRRUPS STIRRUPS END SUPP. CONTINUS SUPP. END SUPP.
consultants
TYP.CANT.BEAM TYP.CONTINOUS BEAM A-T8@100c/c FOR L/3
B-COLUMN LINK AS Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,
Latur-413512,Maharashtra.
Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in
PER SCHEDULE
ARCHITECTS:
NOTE:
DO NOT SCALE THE DRAWING FOR CANTILEVER BEAMS TOP REINFORCEMENT TO BE ANCHORED BEHIND FOR FOR BEAMS HAVING WIDTH OF 6" [150 MM] PROVIDE ONLY TWO WE SHALL NOT REMAIN RESPONSIBLE FOR
KRISHNAKUMAR BANGAD
BARS IN ANY ONE LAYER & FOR BEAMS HAVING WIDTH OF
FOUNDATION TO REST ON HARD STRATA 60 X D OR SPAN OF CANTILEVER WHICHEVER IS GREATER.[ D = DIA. OF BAR ]
9" [230 MM] PROVIDE ONLY THREE BARS IN ANY ONE LAYER.
1) CONCRETE MIX, QUALITY, SHUTTERING, CURING, SUBSTANDARD CONSTRUCTION FIIA, COA, FIV, IIID
MINIMUM DEPTH OF EXCAVATION SHOULD BE 1.5M BAR BENDING SHOULD BE AS PER DETAILS GIVEN. MATERIAL, WORKMANSHIP & FAULTY CONSTRUCTION PROCEDURE .
CONCRETE AS PER DESIGN MIX UNLESS SPECIFIED LAP LENGTH FOR i] BEAMS & SLABS = 60 X D [ D = DIAMETER OF BAR ] 2) SAFETY OF OLD STRUCTURE DURING DEMOLITION AND SAFETY OF ABUTTING CA/2004/32977
PROPER CHAIRS TO BE PROVIDED TO ENSURE SPECIFIED THICKNESS
BASIC REFERENCE CODE IS 456-2000(1-2-3-4 EDITION) ii] COLUMNS = 45 X D [ D = DIAMETER OF BAR ] STRUCTURE / BUILDING. ANY ACCIDENT OCCURRING DUE TO CONSTRUCTION
OF SLAB TO RETAIN THE TOP BARS IN PROPER POSITION & ALSO
CONCRETE GRADE SHALL BE M20 ALL LAPS SHOULD BE STAGGERED & NOT MORE THAN 50% BARS TO BE PROVIDE PROPER COVERING & PINS FOR BEAM REINFORCEMENT OF ELEMENT OF BUILDING NOT DESIGNED BY US.
EARTHQUAKE ZONE SPECIFIED IN IS 1893:2016-3rd ZONE LAPPED AT ANY GIVEN SECTION. FIRST STIRRUPS IN BEAM SHOULD START FROM ITS FACE
DUCTILE DESIGN TO SEISMIC FORCES IN IS 13920:2016 ALL COLUMNS OF FRAME SHOULD BE TIED IN BOTH DIRECTIONS BY TIE BEAMS/ OF SUPPORT [ i.e. FROM COLUMN OR BEAM FACE. ] PROPER PRECAUTIONS SHOULD BE TAKE BY SHORING, STRUTTING ETC.
'T' INDICATES TOR STEEL OF GRADE Fe 500 /PLINTH BEAMS AT GROUND LEVEL/PLINTH LEVEL.EVEN IF HEIGHT OF COLUMNS TO MAINTAIN THE STABILITY OF ABUTTING STRUCTURES. STRUCTURAL
OF GRADE Fe 250 N/mm2 IS WITHIN MAXIMUM ALLOWABLE HEIGHT LIMITS. PROVIDE LINKS FOR COLUMN REINFORCEMENT IN JUNCTION OF CONSULTANT SHOULD BE INFORMED IF ANY GUIDANCE IS REQUIRED
AT ANY LEVEL WHERE COLUMN SIZE GETS REDUCED IN EITHER DIMENSIONS, COLUMN, BEAMS & SLABS AS PER LINKS SPACING MENTIONED
SBC OF SOIL ASSUMED AS 30 T/m2 FOR THE SAME.
TIE OR PLINTH BEAMS ARE REQUIRED. IN OUR DRAWING.
CLEAR COVER TO MAIN REIN. SUPERVISION, IF SPECIFICALLY ASKED FOR, WILL BE PROVIDED TO THE
IF FOOTINGS OVERLAP EACH OTHER, NECESSARY REVISION SHOULD BE OUR RESPONSIBILITY SHALL REMAIN LIMITED TO SAFE AND SOUND
FOOTING 40mm, COLUMN 25mm BEAM 35mm, SLAB 20mm EXTENT OF VERIFICATION OF REINFORCEMENT ON SITE BUT RESPONSIBILITY
OBTAINED FROM OUR OFFICE. STRUCTURAL DESIGN.
MINIMUM CEMENT CONTENT & MAXIMUM DO NOT CAST ANY R.C.C. WORK UNLESS IT IS CHECKED AND REGARDING CORRECT & SOUND CONSTRUCTION SHALL SOLELY REST WITH
ALL STRUCTURAL CONCRETE SHALL BE WEIGHT BATCHED, CONTRACTOR / BUILDER / OWNER .
W/C RATIO USED FOR FOUNDATION CONCRETE SHOULD BE CONFIRMED BY R.C.C. DESIGNER
COLUMNS ORIENTATION AS PER ARCHITECTURAL CENTER LINE PLAN. MACHINE MIXED AND MECHANICALLY VIBRATED.
AS PER CLASUSE 1.2,8.2,4.1,9.1.2 (TABLE-5) OF ANY DISCREPANCY BETWEEN OUR DRAWING & ARCHITECTS DRAWING
BASIC REFERENCE CODE IS 456-2000(1-2-3-4 EDITION) ALL REIN.SHALL BE BENT UP AS SHOWN TO SATISFY THE SHALL BE BROUGHT TO OUR NOTICE BEFORE EXECUTION OF WORK,
THE DEVELOPMENT LENGTH CRITERIA AS PER 465/2000 DESHUTTERING PERIOD
DESHUTTERING PERIOD DO NOT SCALE THE DRAWING.
(FOR DEVELOPMENT LENGTH REFER SECT-DD) SPAN IN M UP TO 4.5 M ABOVE 4.5 M ABOVE 6.0 M
SPAN IN M UP TO 4.5 M ABOVE 4.5 M ABOVE 6.0 M FORMWORK OF CANTILEVER CANOPY, CHAJJA ETC. SHOULD NOT BE
SLAB 7 DAYS 14 DAYS 14 DAYS
SLAB 7 DAYS 14 DAYS 14 DAYS IF THERE ANY DEVIATION,REFERANCE SHALL BE MADE TO REMOVED WITHOUT PERMISSION OF THE STRUCTURAL CONSULTANT. THIS IS A PRESENTATION DRAWING IT MAY BE MODIFIED DURING EXECUTION
BEAM 14 DAYS 21 DAYS 21 DAYS
BEAM 14 DAYS 21 DAYS 21 DAYS THIS OFFICE BEFOR EXECUTION
BUILDING TYPE-
SHEET NO:
RESTAURANT
W 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

GROUND FLOOR & FIRST FLOOR PLAN


S S

TITLE: FLOORING DETAILS


14
13 15
12 16
SPECIFICATIONS:
STORE 11 17
W1 5.60M X 5.17M 10 18
9 19
8 20
7 21
COUNTER 6 22
2.3M X 2M 5 23
4 24
3 25
2 26
1
UP

LVL +0.45M LVL +0.45M

ENTRANCE PORCH

70.23M

NON VEG KITCHEN


5.3M X 2M V V
CRICKET NET PRACTICE PITCHES

W1
RESTAURANT
VEG KITCHEN
PROVISION FOR OPEN COURT

60.44M
VEG KITCHEN S TENNIS COURT FOR DOUBLES

C3

SWIMMING POOL
S
TENNIS COURT FOR DOUBLES

55.12M

126.57M
JOGGING TRACK

BABY POOL

2 GYMNASIUM FOR 50 PEOPLES

9m
TRACK

w
JOGGING TRACK
HALL

JOGGING
65 SQ.MT

i
d

66.31M

d
water body water body

e
o

r
FRONT YARD

o
PARTY LAWN

a
GROUND FLOOR PLAN

d
i
w
9m
JOGGING TRACK JOGGING TRACK
FOUNTAIN

VISITORS PARKING VISITORS PARKING

FLOORING DETAILS
SITE PLAN
SCALE-1:100 SCALE-1:1500

W 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
1

VEG KITCHEN 40
39 41
38 42
43
W1
37
36 44
OFFICERS CLUB
LVL +4.50M 35 45 (PRESIDENT; HON.
34 46 COLLECTOR,LATUR DISTRICT)
33 47 LVL +4.50M
48
NON VEG KITCHEN 32
31 49
TITLE
S
30 50
OF THE PROPOSED OFFICERS CLUB, LATUR
29 51
52
28
27
PROJECT

DRAWN CHECKED : KK
LVL +4.50M

S SCALE DATE:
W.C. W.C. V V
S S

MALE TOILET W.C. W.C. consultants


S S

W1 S RESTAURANT
Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,
FEMALE TOILET Latur-413512,Maharashtra.
S Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in
C3
JANITOR ROOM
S ARCHITECTS:
KRISHNAKUMAR BANGAD
FIIA, COA, FIV, IIID
CA/2004/32977

FIRST FLOOR PLAN


FLOORING DETAILS
SCALE-1:100 THIS IS A PRESENTATION DRAWING IT MAY BE MODIFIED DURING EXECUTION
BUILDING TYPE-
SHEET NO:

Starting point = 0.00M


RESTAURANT, TOILET

C 9,14 = M
End Point= M
C= M
C 3,5,10,15= M

C= M
C 20 = M

C 22,23 = M

C 21= M
C=M

C 4,6,11,16= M
C= M

C 17= M
C 7,12= M

C 1,18= M

C 2,19= M

C 8,14= M
RESTAURANT AND TOILET BLOCK

TITLE: CENTRE LINE PLAN

SPECIFICATIONS:

WAY TO BAR LOUNGE ON FIRST FLOOR


End point= M
C 23 = M
C 18,19= M
C 15,16,17= M

STORE

COUNTER
C 10,11= M
C 20= M
UP
C 12,13,14= M
C 21= M
ENTRANCE PORCH
C 5,6= M

NON VEG KITCHEN C 7,8,9= M


C9

RESTAURANT

VEG KITCHEN C 3,4= M


C 22= M
C 8,14= M

C 1,2= M

Starting Point= M

RESTAURANT CENTRE LINE PLAN D:\officers club\RESTAURANT\New Final a.png


OFFICERS CLUB
(PRESIDENT; HON.
COLLECTOR,LATUR DISTRICT)

Starting point = M
C 7,14= M
C 6,13= M
TITLE
End Point = M

OF THE PROPOSED OFFICERS CLUB, LATUR


C 1,8 = M

C 2,9 = M

C 3,10 = M

C 4,11 = M

C 12 = M
C5= M

PROJECT

DRAWN DD CHECKED : KK
SCALE DATE:

DECK End point= 0.00M consultants


C 9,10,11,12,13 =
URINAL

C 8,14= Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,


Latur-413512,Maharashtra.
URINAL

CHANGING ROOM TOILET CHANGING ROOM TOILET Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in

ARCHITECTS:
URINAL
LOCKERS

LOCKERS

GAMES EQUIPMENT
STORE ROOM WITH KRISHNAKUMAR BANGAD
URINAL

CHANGING ROOM TOILET CHANGING ROOM TOILET

LOCKERS C 7= M FIIA, COA, FIV, IIID


CA/2004/32977
LADIES TOILET GENTS TOILET
C5=M
TOILET

C1=M
C 2,3,4,6 = M
Start point = M

TOILET CENTRE LINE PLAN THIS IS A PRESENTATION DRAWING IT MAY BE MODIFIED DURING EXECUTION
BUILDING TYPE-
SHEET NO:
TOILET BLOCK
DECK C13
KEY PLAN

1.05M

0.45

0.45
6.17M TITLE: WORKING DRAWING

URINAL
0.75

0.75

0.75
16

1.50M
0.90 15

0.60

0.60
V V SPECIFICATIONS:
CHANGING ROOM 1.65M TOILET 1.33M CHANGING ROOM
14

URINAL
1.50M X 1.50M 1.50M X 1.50M 0.45 1.05M 1.50M X 1.50M

0.75

0.75
TOILET

0.75
0.45

0.45
1.50M X 1.50M

3.10M
13

3.10M
1.50M 1.50 1.50
0.90 1.50M
12

3.20M

0.45

0.45
LOCKERS

URINAL

LOCKERS
11
GAMES EQUIPMENT

0.75
0.75

0.75
70.23M
1.50M

1.50M
1.70M

4.70M
0.90 10
V V

4.70M
0.60

0.60
STORE ROOM WITH
CRICKET NET PRACTICE PITCHES

CHANGING ROOM 9

URINAL
CHANGING ROOM TOILET TOILET
1.50M X 1.50M 1.50M X 1.50M 1.50M X 1.50M

0.75

0.75

0.75
1.50M X 1.50M
8

0.45

0.45
LOCKERS
0.45 0.58
1.50 1.50
1.50M 0.90 1.50M 7
PROVISION FOR OPEN COURT

60.44M
1.60M 1.18M 1.60M 1.63M 6 TENNIS COURT FOR DOUBLES

0.45
6.0015M X 4.70M

0.75

SWIMMING POOL
5

1.50M
GENTS TOILET

1.50M
LADIES TOILET
1.50M

0.60
V 4
1.73M

7.00M X 4.70M TOILET


7.00M X 4.70M TENNIS COURT FOR DOUBLES

0.75
1.50M X 1.50M 55.12M

126.57M
0.45
1.00M 4.48M 1.50
6.08M 1.00M 1.00M 5.17M 2
JOGGING TRACK

BABY POOL

1
C6 UP
GYMNASIUM FOR 50 PEOPLES

C1 C2 C3 C4

9m
TRACK
C5

w
JOGGING TRACK
HALL

JOGGING
65 SQ.MT

i
d

d
66.31M
water body water body

e
o

r
GROUND FLOOR WORKING DRAWING PLAN
FRONT YARD

SCALE-1:60

o
PARTY LAWN

a
d

d
i
w
9m
JOGGING TRACK JOGGING TRACK
FOUNTAIN

VISITORS PARKING VISITORS PARKING

SITE PLAN
SCALE-1:1500
21.77M
DN
16
15

DECK 14
13
UP1 UP1 12
5.46M

0.60M0.60M0.60M0.60M0.60M
2 2 11
3 3
4 4 10

4.70M
5 5 9
6 6
7 7 8
8 8 7
9 9
10 10 6
11 11 5
12 12
13 13 4
14 14 3
15 15
16 16 2
1
C6
C1 C2 C3 C4 OFFICERS CLUB
C5 (PRESIDENT; HON.
COLLECTOR,LATUR DISTRICT)
TERRACE FLOOR PLAN SCALE-1:60
TITLE
OF THE PROPOSED OFFICERS CLUB, LATUR
PROJECT

DRAWN CHECKED : KK
DECK C13
SCALE DATE:
URINAL

consultants
S
V V
URINAL

CHANGING ROOM TOILET TOILET CHANGING ROOM


S S S S Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,
Latur-413512,Maharashtra.
S Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in
LOCKERS

URINAL

LOCKERS

ARCHITECTS:
S
GAMES EQUIPMENT
V V KRISHNAKUMAR BANGAD
STORE ROOM WITH
URINAL

TOILET TOILET
CHANGING ROOM CHANGING ROOM FIIA, COA, FIV, IIID
S S S S
S
LOCKERS CA/2004/32977

LADIES TOILET V GENTS TOILET


TOILET

S
S
S
S
C6
C1 C2 C3 C4
C5

TOILET BLOCK FLOORING DETAIL SCALE-1:60 THIS IS A PRESENTATION DRAWING IT MAY BE MODIFIED DURING EXECUTION
BUILDING TYPE-
SHEET NO:
TOILET BLOCK

BUILT UP AREA GROUND FLOOR TOILET BLOCK

TITLE: BUILT UP AREA & CARPET AREA

BUILT UP AREA GROUND FLOOR PLAN SPECIFICATIONS:

BUILT UP AREA STATEMENT UNIT


BUILT UP AREA GROUND FLOOR 124.45 SQ.MT.

DEDUCTIONS

3.52 DUCT
DUCT 3.52 SQ.MT.
70.23M

TOTAL DEDUCTIONS 3.52 SQ.MT.


CRICKET NET PRACTICE PITCHES

BUILT-UP AREA STATEMENT PROVISION FOR OPEN COURT

60.44M
CORRESPONDING TENNIS COURT FOR DOUBLES

CARPET AREA INCLUDING

SWIMMING POOL
STAIRCASE,LIFTS
TENNIS COURT FOR DOUBLES

GROUND FLOOR PLAN


55.12M

126.57M
TOTAL BUILT-UP AREA 120.93 SQ.MT.
JOGGING TRACK

BABY POOL

GYMNASIUM FOR 50 PEOPLES

SCALE-1:80

9m
TRACK

w
JOGGING TRACK
HALL

JOGGING
65 SQ.MT

i
d

66.31M

d
water body water body

e
o

r
FRONT YARD

o
PARTY LAWN

a
d

d
i
w
9m
JOGGING TRACK JOGGING TRACK
FOUNTAIN

VISITORS PARKING VISITORS PARKING

CARPET AREA SITE PLAN


SCALE-1:1500

DECK
CARPET AREA GROUND FLOOR PLAN
CHANGING ROOM
6.17M
1.50M
1.50M

1.50M
1.50M

TOILET

2.32 2.46 2.32 NAME OF AREA NO. SIZES AREA UNIT


4.75 15.53 2.46 TOILET
4.74 CHANGING ROOM
29.23
3.52 DUCT

STAIRS
TOILET 1
3.10M

1.50M 1.50M 1.50M 1.50M


3.10M

LOCKERS
LOCKERS

CHANGING ROOM
2.46 2.46 2.32 GAMES EQUIPMENT 8.22 LADIES TOILET
1.50M
1.50M

1.50M
1.50M

4.70M
2.32 TOILET TOILET CHANGING ROOM STORE ROOM WITH OFFICERS CLUB
(PRESIDENT; HON.
1.50M 1.50M 1.50M 1.50M 2.23M 1.50M LOCKERS PASSAGE 15.53 COLLECTOR,LATUR DISTRICT)
TOILET
17.90 CHANGING ROOMS 2 1.50 X 1.50 2X2.32=4.64 SQMT
1.50M
1.50M

LADIES TOILET 2.46 GENTS TOILET TITLE


LOCKERS 1 1.50 X 3.10 4.75 SQMT OF THE PROPOSED OFFICERS CLUB, LATUR
5.48M 1.50M 7.00M
PROJECT
SHOWER AREA
SQMT DRAWN CHECKED : KK
TOILET 3 1.50 X 1.50 3 X2.46=7.38
SCALE DATE:

GENTS TOILET
consultants

PASSAGE 22.64
Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,
Latur-413512,Maharashtra.
CHANGING ROOMS 2 1.50 X 1.50 2X2.32=4.64 SQMT Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in

LOCKERS 1 1.50 X 3.10 4.74 SQMT ARCHITECTS:


KRISHNAKUMAR BANGAD
FIIA, COA, FIV, IIID
TOILET 2 1.50 X 1.50 2 X2.46=4.92 SQMT
CA/2004/32977
GAMES EQUIPMENT 29.23 29.23 SQMT
TOTAL CARPET AREA 98.47 SQMT

GROUND FLOOR PLAN


SCALE-1:80 THIS IS A PRESENTATION DRAWING IT MAY BE MODIFIED DURING EXECUTION
BUILDING TYPE-
SHEET NO:
TOILET BLOCK
ELEVATION-1
+ 5.55M PARAPET LVL
TITLE: WORKING DRAWING

SPECIFICATIONS:

+ 2.40M SLAB LVL

4.65
+ 2.10M LINTEL LVL

window
+ 0.60M SILL LVL

+ 0.00M GROUND LVL

FRONT ELEVATION DECK C13

SCALE-1:70

URINAL
16
15
V V CHANGING ROOM
CHANGING ROOM TOILET
14

URINAL
1.50M X 1.50M 1.50M X 1.50M TOILET 1.50M X 1.50M
1.50M X 1.50M
13
12

C A

URINAL
LOCKERS

LOCKERS
11
GAMES EQUIPMENT 10
V V
CHANGING ROOM TOILET
CHANGING ROOM
STORE ROOM WITH 9

URINAL
TOILET
1.50M X 1.50M 1.50M X 1.50M 1.50M X 1.50M
1.50M X 1.50M
8
LOCKERS 7
6

GENTS TOILET
6.0015M X 4.70M 5
LADIES TOILET
7.00M X 4.70M V 4
TOILET
7.00M X 4.70M
1.50M X 1.50M 3
2
1
C6 UP
C1 C2 C3 C4
C5

GROUND FLOOR KEY PLAN

D
+ 3.30M PARAPET LVL

SITE PLAN
+ 2.40M SLAB LVL SCALE-1:350

+ 2.10M LINTEL LVL

+ 0.60M SILL LVL

+ 0.00M GROUND LVL

BACK ELEVATION
SCALE-1:70
OFFICERS CLUB
+ 5.55M PARAPET LVL + 5.55M PARAPET LVL (PRESIDENT; HON.
COLLECTOR,LATUR DISTRICT)

TITLE
OF THE PROPOSED OFFICERS CLUB, LATUR
PROJECT

DRAWN CHECKED : KK
SCALE DATE:
+ 2.40M SLAB LVL + 2.40M SLAB LVL

+ 2.10M LINTEL LVL + 2.10M LINTEL LVL


consultants

Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,


Latur-413512,Maharashtra.
+ 0.60M SILL LVL + 0.60M SILL LVL Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in

+ 0.00M GROUND LVL + 0.00M GROUND LVL ARCHITECTS:


KRISHNAKUMAR BANGAD

SIDE ELEVATION SIDE ELEVATION FIIA, COA, FIV, IIID


CA/2004/32977
SCALE-1:70 SCALE-1:70

THIS IS A PRESENTATION DRAWING IT MAY BE MODIFIED DURING EXECUTION


C/L OF WALL BUILDING TYPE-
SHEET NO:
TOILET BLOCK
0.75M RCC BEAM

0.30M
PLASTER
DOOR WINDOW DETAIL
R.C.C. BEAM
0.60M FIXED GLASS
'A' 'A'
TITLE: WORKING DRAWING
100
EXHAUST FAN
300X300MM GRANITE SPECIFICATIONS:
FRAME

FIX GLASS
EQ.

0.90M
10X10MM SQ. BARS
19 mm granite
WELDED TO FLATS door frame
TYP)
M.S. GRILL

2.40M
C' C' 35MM THK SHUTTER OF SOLID
EQ.

CORE FINISHED WITH BOTH


SIDE 1.5MM THK.

2.10M
LAMINATE AS APPROVED
GLASS LOUVERS

UPVC FRAME
outside

GODREG LOCK WITH HANDLE


inside
100

RCC LINTEL WINDOW SCHEDULE FOR THE FIRST, SECOND, THIRD FLOOR PLAN:
75MM THK. outside GRANITE DOOR FRAME SR. NAME SIZE TOTAL SILL@ LINTEL@ LOCATION SPECIFICATIONS(refer details)
SOLID CORE FLUSH DOOR
ELEVATION SINGLE LEAF SHUTTER WITH
1 V 0.60X0.90 5 1.50 M 2.40M TOILET GLASS LOUVERS

SCALE- 1:100 LAMINATE ON BOTH SIDE

SECTION D'-D' WINDOW SCHEDULE


SCALE- 1:100

OUTSIDE

INSIDE
DETAIL B inside SILL - 0.15 20MM TH. GRANITE STONE STRIP

R.C.C. BEAM
5MM CLEARANCE
F.F.L F.F.L
PLASTER INSIDE

ELEVATION SECTION D'-D'


0.10M

outside
ALUMINUM FRAME 30 mm thk.
GRANITE FRAME
FIX GLASS 10X10MM SQ.BARS 30 mm thk. f. r. p. door hinge
f. r. p. door
GLASS LOUVERS
SCALE- 1:100
WELDED TO FLATS
TYP)
M.S. GRILL
hinge IN
'D' X
PLAN AT. C'-C' INSIDE

SIZE
SILL LINTEL SPECIFICATION
OUT
NAME LVL LVL OUTSIDE 'D' 19 mm granite door OFFICERS CLUB
frame (PRESIDENT; HON.
granite A.A.C. COLLECTOR,LATUR DISTRICT)

1 0.60M X 0.90M 1.50M 2.40 M POWDER COATED UPVC FIXED door frame BLOCK WALL
V 19
PANNEL WITH ADJUSTABLE LOUVERS SINGLE SHUTTER FIBRE DOOR 19 TITLE
PROPOSED OFFICERS CLUB, LATUR
OF THE
VENTILATORS AND M.S. GRILLS WITH GRANITE DOOR FRAME - D2 0.20 m. thk.
38 PROJECT
a.a.c. block wall
( 0.75 X 2.60M )
DRAWN CHECKED : KK

DETAIL AT-X SCALE DATE:


LOCATION - D1( 1.00 X 2.40 M ) ALL TOILET DOOR
ANODIZED ALUMINUM LOUVERED VENTILATORS WITH M.S. GRILL
AND EXHAUST FAN VENTILATORS - V = 0.60M X 0.9M. D2( 0.75 X 2.40 M ) ALL TOILET DOOR
consultants

Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,


Latur-413512,Maharashtra.
S.NO NAME SIZE LINTEL SPECIFICATION HINGE TOWER BOLT TADIPATTI HANDLE ALDROP Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in

LVL
ARCHITECTS:
KRISHNAKUMAR BANGAD
1 DOOR FRAME OF BLACK GRANITE WITH FULL THREE HINGES OF 0.20 M LONG HEAVY 0.20 M LONG 0.15 M LONGHEAVY 0.30 M LONG FIIA, COA, FIV, IIID
D1 1.00MX2.40M 2.40
BULLNOSING INSTALLED WITH SKILLED LABOUR 0.125M HEAVY DUTY DUTY CROME PLATED HEAVY DUTY M.S DUTY M.S CROME HEAVY DUTY M.S
WITH ARALDITE AS APPROVED ONE TOWERBOLT CA/2004/32977
CHROME PLATED CROME PLATED PLATED EXTERNALSIDE CHROME PLATED
32 MM THK SOLID CORE FLUSH DOOR OF INTERNALLY INTERNALLY & INTERNAL SIDE BOTH EXTERNAL SIDE
WATERPROOF GRADE WITH LAMINATE OF
BOTH SIDES OF WENGE DESIGN

2 DOOR FRAME OF BLACK GRANITE WITH FULL THREE HINGES OF 0.20 M LONG HEAVY 0.20 M LONG 0.15 M LONGHEAVY 0.30 M LONG
D2 0.75MX2.40M 2.40
BULLNOSING INSTALLED WITH SKILLED LABOUR 0.125M HEAVY DUTY DUTY CROME PLATED HEAVY DUTY M.S DUTY M.S CROME HEAVY DUTY M.S
WITH ARALDITE AS APPROVED CHROME PLATED ONE TOWERBOLT CROME PLATED PLATED EXTERNALSIDE CHROME PLATED
32 MM THK SOLID CORE FLUSH DOOR OF INTERNALLY INTERNALLY & INTERNAL SIDE BOTH EXTERNAL SIDE
WATERPROOF GRADE WITH LAMINATE OF BOTH
SIDES OF WENGE DESIGN
THIS IS A PRESENTATION DRAWING IT MAY BE MODIFIED DURING EXECUTION
BUILDING TYPE-
SHEET NO:
TOILET BLOCK
PB19A
TOILET BLOCK
PB31 PB33
PB15 C9 PB16 C10 PB17 PB18 PB19 TITLE: R.C.C PLANS AND DETAILS
C8
SPECIFICATIONS:

PB11 PB12 PB13 PB14


PB21 PB26 PB28
PB22

PB23 PB24 PB25 PB29


PB20 PB27 PB30 PB32

PB10A
PB6 PB7 PB8 PB9 PB10

PB1 PB2 PB3 PB4 C5 PB5

FOUNDATION PLAN
SCALE-1:60

COLUMN & FOOTING SCHEDULE

9" 9"
8-T16 8-T16
FOOTING TOP
TO 18" 21"
FIRST FLOOR
STRUCTURAL CONSULTANT

SANJAY JATHADE M.TECH.(STR)


'ROYAL PLAZA'COMPLEX F.FLOOR,S.NO.12,MURARGI PETH
BEHIND BHAGWAT PETROL PUMP.SOLAPUR-413001
FOOTING SIZE(LXB) 5'0"X4'3" 5'6''X4'6" CELL.9423589358 Email-sanjay_ jathade@rediffmail.com

D 18" 18"
OFFICERS CLUB
(PRESIDENT; HON.
REIN.PARALLELTO 'L' 11-T10 12-T10 COLLECTOR,LATUR DISTRICT)

REIN.PARALLELTO 'B' 13-T10 15-T10 TITLE


PROPOSED OFFICERS CLUB, LATUR
P.C.C 5'6"X4'9"X0'4" 6'0"X5'0"X0'4" OF THE
PROJECT
C2,C3,C4,C5, C6,C9
C1,C7,C8,C14 DRAWN CHECKED : KK
C10,C11,C12,C13
SCALE DATE:

consultants

Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,


Latur-413512,Maharashtra.
Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in

ARCHITECTS:
KRISHNAKUMAR BANGAD
FIIA, COA, FIV, IIID
CA/2004/32977

THIS IS A PRESENTATION DRAWING IT MAY BE MODIFIED DURING EXECUTION


70.23M
SHEET NO:13
SPL-27
15.00 SPL-26
15.00 SPL-25
9.00
TITLE:
SPL-28
15.52

WORKING DRAWING_
SPL-29 15.00

6.43
Halogen-16
Halogen-13
SPL-24
ELECTRICAL DETALING
SPECIFICATIONS:

15.00
CRICKET NET PRACTICE
PITCHES RETURN CREASE

STUMPS

15.00
BOWLING CREASE

POPPING CREASE

SPL-30

Halogen-15 Halogen-14

EMERGENCY GATE 1

SPL-23

Halogen-7

15.00
Halogen-8

PROVISION FOR OPEN COURT

14.16
Halogen-9 Halogen-10

SPL-31

60.44M

BACKCOURT

SERVICE LINE

BASELINE
TENNIS COURT FOR DOUBLES SPL-22

15.00

SWIMMING POOL

15.00
Halogen-5 Halogen-6

25.00

SPL-32

SPL-21

BACKCOURT

SERVICE LINE

BASELINE
11.00

15.00
TENNIS COURT FOR DOUBLES

15.00
23.00

15.23

55.12M

Halogen-12 Halogen-11
SPL-34 SPL-33
SPL-36 SPL-35 DECK
10.39

126.57M
14.97 14.97 14.97

URINAL
12.00

URINAL
CHANGING ROOM

JOGGING TRACK
TOILET CHANGING ROOM TOILET

SPL-1

URINAL
LOCKERS

LOCKERS
GAMES EQUIPMENT
STORE ROOM WITH 5.00

URINAL
CHANGING ROOM TOILET CHANGING ROOM TOILET

LOCKERS SPL-20
BABY POOL
NOTE :
C78,79,80,81 IS TAKEN SQUARE UPTO 1M
FROM PLINTH AND AFTER 1M IT IS TAKEN AS
ROUND COL. PLEASE REFER ELEVATION FOR
THIS

LADIES TOILET GENTS TOILET


TOILET
20 Amp
DP MCB

PLINTH PROTECTION 15.40M


PLINTH PROTECTION

WAY TO BAR LOUNGE ON FIRST FLOOR


C78 C79 C80 C81

1.58

0.30
6.22
2.18 2.92
4.02M 3.69M 3.50M

0.50
0.95
28.00
12.93

W4 0.30M W3 D2
0.30M

0.37M

JANITOR ROOM
AQUARIUM AT 0.90M LVL

1.73
GENTS CHANGING ROOM

D4

2.73
STORE LVL +1.20M LVL +1.20M
WAITING LOUNGE
D6 D6 D6 D6 D6

27.01

1.43

1.10

1.10

1.10

1.10

1.10
PASSAGE

1.56
D4

1.00
3.02M
1.00 1.00 1.00 1.00 1.00 D5
SLEEVE TO HIDE SLEEVE TO HIDE

15.00
SLEEVE TO HIDE 0.75

OFFCIERS CLUB
RAIN WATER PIPE RAIN WATER PIPE RAIN WATER PIPE 11.06M 5.64 0.75
C66
LVL +1.05M C59A

1.07
0.68M 0.68M 0.68M

6.43M
0.60M

0.60M

0.60M
.50M

R1
LVL +1.20M
FIXED TOUGHNED GLASS FIXED TOUGHNED GLASS FIXED TOUGHNED GLASS FIXED TOUGHNED GLASS
PANEL AREA

RECEPTION
M.S. LOUVERS FIXED TOUGHNED GLASS
COUNTER SHOWER AREA

.0
R0 5.78M

0M

2.27
LVL +1.20M
3.71M 1.98M
D6 D6 D6 D6 D6
D5 D5
1.58
DUCT 0.96M 3.90M 3.86M 3.71M D4 0.23x0.53
3.69M 0.30M 3.74M 1.12M W.C. W.C.
0.30M

1.92M
0.30M 0.23M 5.04M 5.04M 0.30

Hon Collectors,Latur,District.
0.30M
UP 0.23x0.60

2.57M
2.57M
3.90

0.50

0.50
V DUCT V
D4

1.00
3.40M
LVL +1.20M LVL +1.20M

1.88
V

0.80
TREAD = 300MM

NON VEG KITCHEN ENTRANCE PORCH UP RISER = 177.8MM


LOBBY LADIES CHANGING ROOM V V

2.00M
1
SPL-2 GYMNASIUM FOR 50 PEOPLES
5.27M

2 26 D1 D6 D6 D6 0.30

1.20M
3 25 0.30x0.68 W.C. W.C.

1.55

1.17

1.17

1.17
D3 0.30x0.68 LVL +1.05M
4 24
20.52M 6.60M 23 D1 1.00 1.00 1.00 D5 D5
5

0.23M
soft sand filling 22

3.98
6
6.37M 6.23M 2.00M 2.02M D2 D2 0.23x0.53
21 0.23M 0.62M D4
15.39

0.95
RESTAURANT 0.23x0.53

1.57M
1.57M
8 20 SHOWER AREA

1.08M
D2 PASSAGE

1.20M
19

2.08M
9

6.01M
0.75 1.61
D2

TITLE
10 18 D6 D6 D6 D6 D6

PROPOSED CONSTRUCTION OF

6.01M
LDB 1.58 D5

1.08
11 17 JANITOR ROOM
3.84M 3.74M 3.98M 3.90M 3.86M
0.68M

0.68M
16

0.48
1.00M
12 2.36
ACK

13 15 LVL +1.20M LVL +1.20M LVL +1.20M

VEG KITCHEN 1.76M 14 3.47M 1.90M 8.13M

0.68M
6.23M
BILLARD ROOM
19.36

SPL-19
OF THE OFFICERS CLUB

6.00M

6.00M
1.80M
2.96M

1.80M
LVL +1.20M
6.15M X 6M 2.96M ADMIN. OFFICE BACK OFFICE PRESIDENT CABIN TOILET

3.98M
LVL +3.15M
15.23M

6M X 6.8M 6M X 4.8M 6M X 3M

4.43M

3.85M
3.10M
LVL +3.15M
3.70M PEDICURE
3.75M

3.75M
D4

3.85M
11.40

AND MANICURE
ING TR

0.30
2.24M 0.77M PASSAGE

PROJECT

9m
0.92M 3.35M x 3.85M
7.21

CAPACITY OF 6 PASSENGER
ACDB SPA

1.80M
1.80M
LIFT 6.15M x 3.85M
LD 1.40M X 1.80M LDB

1.88
0.23M
FIXED TOUGHNED GLASS PDB FIXED TOUGHNED GLASS
0.23M 1.00M 0.53M
8.36M 1.25M 2.40M 2.71M 2.01M 2.68M 2.40M 1.34M 4.02M 0.62M D4
1.59M
3.51M D5 D4
8.61M

0.30
8.06M 1.25M 2.40M 1.25M 1.23M 1.23M 6.00M 1.00M 1.25M
D1

1.48M
D4
1.50M

1.50M

1.50M

1.50M
panel
0.37M

CHECKED : KK
TOILET PASSAGE

DRAWN PRIYA
LVL +1.20M

CHILDREN'S PLAY AREA 7M X 2M D4 D4


D4
RECEPTION CONFERENCE ROOM D4
4.03M

zali work
JOGG

LVL +1.20M
1.00M 1.00M

w
LVL +1.20M
3.00M 1.69M 1.00M 1.00M 1.69M 3.00M

4.07M
MEETING ROOM / COURTYARD COURTYARD 7M X 5M
4.63M

4.63M

4.64M
zali work

8.1M X 5M
4.26M

5.00M

2.00M

5.00M

2.00M

2.00M

2.00M
LIBRARY 4.9M X 5M 4.9M X 5M

JOGGING TRACK
D1 D1 D1 D1 LVL +1.05M

SPL-3 31.75 MALE MASSAGE FEMALE MASSAGE SAUNA

DATE:12.09.2018
LVL +1.20M LVL +1.20M

8.10M
LVL +1.20M
STEAM BATH

15.00
SCALE
LVL +1.20M
12.16M ROOM ROOM

3.37M

3.37M
MT
4M x 3.37M

3.37M

3.37M
R4
GATE 0.23x0.53 2.86M R4
.5
.78M M
5 HALL V
4M x 3.37M 4M x 2.70M 4M x 2.70M

1.22M

8.21M
0.37M

0.37M

0.53M 1.20M

1.20M

0.36M
2.00M
8.13M
65 SQ.MT
1.50M

1.50M
LVL +1.20M LVL +1.20M
7.09M
1.20M

7.69M
DUCT

7.69M
0.30
0.30
0.30M 0.30M 0.30M 4.90M panel panel DUCT 0.30
C23

i
FIXED TOUGHNED GLASS FIXED TOUGHNED GLASS FIXED TOUGHNED GLASS
FIXED TOUGHNED GLASS FIXED TOUGHNED GLASS FIXED TOUGHNED GLASS
3.84M 3.74M 1.12M 1.20M 1.50M 1.20M 1.18M 1.50M 1.19M 4.84M 4.91M 1.23M 1.50M 1.23M 1.18M 1.50M 1.53M 2.17M 1.18M 1.21M 2.55M 3.99M
ENTRAN

OPENABLE GLASS OPENABLE GLASS


1.00M

M.S. LOUVERS W1 W1 W1 W1 M.S. LOUVERS


FIXED TOUGHNED GLASS

3.78M
14.00M LVL +1.20M
14.00M
CE GAT

2.87M

SIT OUT SIT OUT

2.87M
water trough zali work zali work water trough
0.23M

0.23M
d

SLEEVE TO HIDE SLEEVE TO HIDE

d
SLEEVE TO HIDE SLEEVE TO HIDE
RAIN WATER PIPE
E3

wall in stone 1.20M


RAIN WATER PIPE
RAIN
RAIN WATER
WATER PIPE PIPE
1.20M wall in stone
11.66 Halogen-2 cladding with cladding with
4m height
C6 C7
4m height
wall in stone 0.60M 0.60M wall in stone
0.30M

0.30M
Halogen-1 cladding with
fixed toughned fixed toughned
cladding with
waterfall having
wall 3.5m height water body glass glass

water body waterfall having


wall 3.5m height
4.00M

4.00M
4.04M 4.04M
consultants
66.31M

2.17M
teak wood
2.00M teak wood
7.00M

7.00M
2.19M

WATERFALL WITH RAINFALL


SPL-4 LVL +0.45M
SKY SITTING WITH ARTIFICIAL MD LVL +0.45M

e
LVL +1.20M
LAWN LVL +1.20M
4.00M
1.51M
a

1.51M
wall with 1.20m height wall with 1.20m height

LVL +1.20M

11.14M 11.14M
0.80M

7
C3
wall with 0.75m height
LVL +0.45M
6 LVL +0.45M
wall with 0.75m height
SPL-18
3.50M 5
3.50M
2.88M

2.88M
4 C4
C1
Bedre Arcade,ground floor,Behind Sushma Hotel,Shivaji Chowk,
3
2
0.23M

0.23M
NOTE : 1
4.00M
C1,2,3,4, IS TAKEN SQUARE UPTO 1M FROM
PLINTH AND AFTER 1M IT IS TAKEN AS TREAD = 300MM
Latur-413512,Maharashtra.
o

r
ROUND COL. PLEASE REFER ELEVATION FOR
1.48M THIS
RISER = 150MM
UP 1.48M

4.23M
wall with 0.75m height FRONT YARD
LVL +0.15M
4.23M
wall with 0.75m height
Tel:+91 2382 246105 Email: kk@spacemagic.inVisit:www.spacemagic.in

PLINTH PROTECTION

ARCHITECTS:
15.00

o
r

SPL-37 LVL +0.00M SPL-38

KRISHNAKUMAR BANGAD

15.00
PARTY LAWN
19.98

a
e

FIIA, COA, FIV, IIID


CA/2004/32977
d

d
SPL-5

SPL-17
i

WL1
Halogen-3

DESIRE ENGINEERING
w

SPL-40

DE Electrical
Halogen-4
SPL-39

11.56

JOGGING TRACK Service Consultants


9m

JOGGING TRACK
15.00

WL4 FOUNTAIN WL2

15.00
Shop-5 ,Dreams Heera Appt, Handewadi,Hadapasar Pune-411 028
8.42
GATE 1 A

GATE 2 A

VISITORS PARKING Mob. +91-8888823598/7887521120


VISITORS PARKING
E-mail- desire_engineering@outlook.com
WL3
Street LDB

SPL-6
SECURITY SECURITY
4.0M x 3.5 M
CABIN 4.0M x 3.5CABIN
M

SPL-11 SPL-12 SPL-13 SPL-14 SPL-15 SPL-16


ENTRANCE GATE 1 ENTRANCE GATE2
SPL-7 SPL-8 SPL-9 SPL-10
12.85 7.91 NAMEPLATE 11.17 5.63 12.76 12.15
THIS IS A PRESENTATION DRAWING IT MAY BE MODIFIED DURING EXECUTION
10.03 15.00 15.00 15.00
118.40M

9m w i d e r o a d
SHEET NO:01
TITLE:
WORKING DRAWING_
GROUND FLOOR ELECTRICAL
SPECIFICATIONS:
S.N. DESCRIPTION SYMBOLS
1 WALL LIGHT POINT
SWITCH BOARD WITH
2
HALF POINT
3 CEILING FAN

4 SOCKET OUTLET FOR


TV CABLE/ANTENA
1-5 AMP Point
5
PLINTH PROTECTION PLINTH PROTECTION
1-15 AMP Point PP1
6 CEILING LIGHT POINT
20A SOCKET OUTLET
WL16 WL15

7 FOR AC.

1.00

1.26

JANITOR ROOM
L3 L4
AQUARIUM AT 0.90M LVL
1.35 2.70 1.35
L20 L19 L18 L16 L2
PASSAGE L17 L14 GENTS CHANGING ROOM

8 EXHAUST FAN
L15 Sp-1 L16 L17 L18 L19 L20 L21 L22 Sp-2 L23 F2 F1 CHANGING ROOM CHANGING ROOM CHANGING ROOM CHANGING ROOM CHANGING ROOM

0.55
SLEEVE TO HIDE SP SP
CEILING ROSE

3.00

2.50
RAIN WATER PIPE 1.45 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 1.45

L12 L13 L14 L15


SB1
0.20

L5 L6
9

1.74

1.74
Sp-5 Sp-6 1.94 2.70 1.94
FIXED TOUGHNED GLASS FIXED TOUGHNED GLASS M.S. LOUVERS FIXED TOUGHNED GLASS
WAITING LOUNGE
10 BZ : BELL BUZZER
SHOWER AREA
SP SP L1
1.98 1.98 1.98
RECEPTION
L29 1.78 1.78
L24 L13

1.25
PP28 DUCT PP27 PP26
2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40
SB17 W.C. W.C.
1.00

0.20 L11 L10 L9 L8 L7

PP29
L10 L9 L8 L7 L6 L5 L4 L3 L2 L1
SB23 L1 L2 11 BELL PUSH

2.50

2.50

3.00
SB24 SB16 DUCT
0.20

1.25
L1 L2
1.50

F5 F4 F3 F2 F1

12 DISTRIBUTION BOARD
TREAD = 300MM 0.20 0.98 1.95 0.98
F3 F4 SB18 L6
2.40

L30 UP 1 RISER = 177.8MM

L25
LOBBY 0.20
L12
SB2
SB3
0.20
LADIES CHANGING ROOM

PP30

GYMNASIUM FOR 50 PEOPLES 2 26

Exh6
3 25 W.C. W.C.
L3 L4 L5 L6
20A/6A Switch Point
1.50

1.00
L11 L12 L13 L14 L15 L16 L17 L18 L19 L20 L21
4 24

2.50
LDB
PDB 5 23 0.20 0.20 0.30 0.20 0.20 CHANGING ROOM CHANGING ROOM
CHANGING ROOM

13 FOR AC.

2.50

2.50
22 ACsw8 AC9 ACsw7
6 SB12 ACsw92.40 0.20
SB19
PP10 F6 F7 F8 F9 SB22 2.40 0.30 1.66 3.31 1.66
7 21

0.60
ACsw6 AC7
L1 L2 0.20 L3 L1 L6 L7 SB11 AC5 SB10ACsw5 L3
L4

24.70M
1.11
8 20 PASSAGE
2.40

1.50

1.50

1.50
1.50

L1 L6
L31 9 19 L11 L10 L5

14 25mm CONDUIT.
L26 L1 L6 L7
10 18 WL10
CMP7

1.25
PP11 L28 L26 11 17 CMP1 1.75 2.70 0.95
JANITOR ROOM
BILLARD ROOM 12 16 ADMIN. OFFICE CMP2

2.40

2.40

2.40

2.40
F2 F1 F1
L29 L27 L25 L24 L23 L22 6.15M X 6M 13 15 6M X 6.8M BACK OFFICE

2.00
2.16 0.98

15 Low Voltage CONDUIT.

2.50

2.50
6M X 4.8M

1.50

1.50
1.50

PP1 0.20
14 PP8 PP7 PP2

F13 F12 F11 F10