Professional Documents
Culture Documents
Vacant and Un-Encumbered Land of Construction Zone: Appendix
Vacant and Un-Encumbered Land of Construction Zone: Appendix
Name of Work: Strengthening of existing 2 lane from km 445/00 to 455/00 & km 475/00 to 500/00 (Total
Length =35.00Km) of NH-52 (New NH -15) under Annual Plan for the year of 2018-19
under Nagaon NH Division, Nagaon in the State of Assam on EPC Mode, Job No-
052(New-NH-15)/AS/2018-19/185
Vacant &
Chainage (KM) Width of Encumbered Vacant &
Unencumbered Total Area of
Sr. Length EROW Const. Road width of Encumbered Un-
width of Construction
No. (m) (m) Zone Construction Area (sq.m) encumbered
Constrcution Zone
From To (Reqd.) Zone Area (sq.m)
Zone (m)
Main PAVED
EARTHEN
Carriageway SHOULDER
SHOULDER (ES)
(MCW) (PS)
Formation Existing
K.M Land Use Pattern
Width width Width (m) ROW (m)
Width
Type
(m) Left Right Left Right
445 Flexible 7.0 1.00 1.00 0.60-1.00 0.60-1.00 12.0 45 Agri/ Residence (mixed)
446 Flexible 7.0 1.00 1.00 0.60-1.00 0.60-1.00 12.0 45 Agri/ Residence (mixed)
447 Flexible 7.0 1.00 1.00 0.60-1.00 0.60-1.00 12.0 45 Agri/ Residence (mixed)
448 Flexible 7.0 1.00 1.00 0.60-1.00 0.60-1.00 12.0 45 Agri/ Residence (mixed)
449 Flexible 7.0 1.00 1.00 0.60-1.00 0.60-1.00 12.0 45 Agri/ Residence (mixed)
450 Flexible 7.0 1.00 1.00 0.60-1.00 0.60-1.00 12.0 45 Agri/ Residence (mixed)
451 Flexible 7.0 1.00 1.00 0.60-1.00 0.60-1.00 12.0 45 Agri/ Residence (mixed)
452 Flexible 7.0 1.00 1.00 0.60-1.00 0.60-1.00 12.0 45 Agri/ Residence (mixed)
453 Flexible 7.0 1.00 1.00 0.60-1.00 0.60-1.00 12.0 45 Agri/ Residence (mixed)
454 Flexible 7.0 1.00 1.00 0.60-1.00 0.60-1.00 12.0 45 Agri/ Residence (mixed)
475 Flexible 7.0 1.00 1.00 0.60-1.00 0.60-1.00 12.0 45 Agri/ Residence (mixed)
476 Flexible 7.0 1.00 1.00 0.60-1.00 0.60-1.00 12.0 45 Agri/ Residence (mixed)
477 Flexible 7.0 1.00 1.00 0.60-1.00 0.60-1.00 12.0 45 Agri/ Residence (mixed)
478 Flexible 7.0 1.00 1.00 0.60-1.00 0.60-1.00 12.0 45 Agri/ Residence (mixed)
479 Flexible 7.0 1.00 1.00 0.60-1.00 0.60-1.00 12.0 45 Agri/ Residence (mixed)
480 Flexible 7.0 1.00 1.00 0.60-1.00 0.60-1.00 12.0 45 Agri/ Residence (mixed)
481 Flexible 7.0 1.00 1.00 0.60-1.00 0.60-1.00 12.0 45 Agri/ Residence/Market Area
482 Flexible 7.0 1.00 1.00 0.60-1.00 0.60-1.00 12.0 45 Agri/ Residence (mixed)
483 Flexible 7.0 1.00 1.00 0.60-1.00 0.60-1.00 12.0 45 Agri/ Residence (mixed)
484 Flexible 7.0 1.00 1.00 0.60-1.00 0.60-1.00 12.0 45 Agri/ Residence (mixed)
485 Flexible 7.0 1.00 1.00 0.60-1.00 0.60-1.00 12.0 45 Agri/ Residence (mixed)
486 Flexible 7.0 1.00 1.00 0.60-1.00 0.60-1.00 12.0 45 Agri/ Residence (mixed)
487 Flexible 7.0 1.00 1.00 0.60-1.00 0.60-1.00 12.0 45 Agri/ Residence/Market Area
488 Flexible 7.0 1.00 1.00 0.60-1.00 0.60-1.00 12.0 45 Agri/ Residence (mixed)
489 Flexible 7.0 1.00 1.00 0.60-1.00 0.60-1.00 12.0 45 Agri/ Residence/Market Area
490 Flexible 7.0 1.00 1.00 0.60-1.00 0.60-1.00 12.0 45 Agri/ Residence (mixed)
491 Flexible 7.0 1.00 1.00 0.60-1.00 0.60-1.00 12.0 45 Agri/ Residence (mixed)
Main PAVED
EARTHEN
Carriageway SHOULDER
SHOULDER (ES)
(MCW) (PS)
Formation Existing
K.M Land Use Pattern
Width width Width (m) ROW (m)
Width
Type
(m) Left Right Left Right
492 Flexible 7.0 1.00 1.00 0.60-1.00 0.60-1.00 12.0 45 Agri/ Residence (mixed)
493 Flexible 7.0 1.00 1.00 0.60-1.00 0.60-1.00 12.0 45 Agri/ Residence (mixed)
494 Flexible 7.0 1.00 1.00 0.60-1.00 0.60-1.00 12.0 45 Agri/ Residence (mixed)
495 Flexible 7.0 1.00 1.00 0.60-1.00 0.60-1.00 12.0 45 Agri/ Residence (mixed)
496 Flexible 7.0 1.00 1.00 0.60-1.00 0.60-1.00 12.0 45 Agri/ Residence (mixed)
497 Flexible 7.0 1.00 1.00 0.60-1.00 0.60-1.00 12.0 45 Agri/ Residence (mixed)
498 Flexible 7.0 1.00 1.00 0.60-1.00 0.60-1.00 12.0 45 Agri/ Residence (mixed)
499 Flexible 7.0 1.00 1.00 0.60-1.00 0.60-1.00 12.0 45 Agri/ Residence (mixed)
500 Flexible 7.0 1.00 1.00 0.60-1.00 0.60-1.00 12.0 45 Agri/ Residence/Market (mixed)
Type of Structure
Sl. Existing Overall
Span Arrangement Remark
No. chainage Super- Width
Foundation Sub-Structure
Structure
54.44+11.5x2+53.3+54.1=184
11 491.024 Well RCC RCC 8.6 Major Bridge
.84
Name of Work: Strengthening of existing 2 lane from km 445/00 to 455/00 & km 475/00 to
500/00 (Total Length =35.00Km) of NH-52 (New NH -15) under Annual
Plan for the year of 2018-19 under Nagaon NH Division, Nagaon in the
State of Assam on EPC Mode, Job No-052(New-NH-15)/AS/2018-19/185
Name of Work: Strengthening of existing 2 lane from km 445/00 to 455/00 & km 475/00 to
500/00 (Total Length =35.00Km) of NH-52 (New NH -15) under Annual Plan
for the year of 2018-19 under Nagaon NH Division, Nagaon in the State of
Assam on EPC Mode, Job No-052(New-NH-15)/AS/2018-19/185
The site has 06 nos. trees at isolated stretches falling on the extremity of earthen shoulder. The trees
requires to be felled for safety purposes, however, will not affect in construction of Project Highway. The
scope has been mentioned in Schedule-B (Annex-B1).
The Site has no other utilities affecting the existing road and proposed construction of Highway
Name of Work: Strengthening of existing 2 lane from km 445/00 to 455/00 & km 475/00 to 500/00
(Total Length =35.00Km) of NH-52 (New NH -15) under Annual Plan for the year of
2018-19 under Nagaon NH Division, Nagaon in the State of Assam on EPC Mode,
Job No-052(New-NH-15)/AS/2018-19/185
5. Project Facilities (Toll Gate & Plaza / Bus Bays/ Truck Lay buys/ Pedestrian Facilities :
The Site has no any Toll Plaza / Bus Bays/ Truck Lay buys etc.