Test form special for sarta early production facility (EPF)

project site /Kurdistan /IRAQ


Lest of Insulation Resistance Measurements for the low voltage (high voltage
tester. Cables form

Circuit nominal voltage: ________________

Test Voltage (D.C.): .________________

Insulation Resistance Between Phases /Poles Remarks


)Mega Ohm(
ITEM Cable No. or Insulation SINGLE
NO. Details of Resistance to THREE-PHSES TEST PHASE
Equipment (Mega Ohm) TEST
L1- L1- L1- L2- L2-N L3- L-N
L2 L3 N L3 N
1
2
3
4
5
6
7
8
9
11
11
12
13
14
16
17
18
19
21
21
22

Notes: Sequence of testing the insulation resistance shall be as follows:

(a)all cables must be free at the another ends, not connect with the any devices .
Tested / Checked by : (Name of Signature – : phone no.
Contractor’s Representative)of
Email
zardasht group ( )
Date :
Representative at the beneficiary Signature – : phone no.
company : (Name(s) of chevron
Email
company ( )