You are on page 1of 16

ISOLATED SLOPED FOOTING DESIGN

M20,25,30,35 GRADE CONCRETE, FE415,500,550GRADE STEEL F1


Fck 20
Fy 500
COLUMN/PEDESTAL WIDTH(M) 0.23
COLUMN/PEDESTAL DEPTH(M) 0.38
LOAD FROM STRUCTURE(P)( KN) 450
MOMENT-Mx(KN.M) 2.58
MOMENT My(KN.M) 0.64
ADD 10% AS SELF WEIGHT(KN) 45
TOTAL LOAD(KN) 495
SBC OF SOIL(KN/SQ.M) slope 200
Approx AREA OF FOOTING in SQ.M flat 1.65
approx SIDES OF FOOTING IN Mts 1.28
LONGER SIDE OF FOOTING(A)(M) 1.35
SHORTER SIDE OF FOOTING(B)(M) 1.35
Check for Area of Footing Provided OK
Check for NUPI SAFE
Zx 0.41
Zx 0.41
MAX.NET UPWARD PRESSURE(KN/SQ.M) 254.77
MOMENT(ALONG SIDE,A)KN.M 53.9
MOMENT(ALONG SIDE,B)KN.M 40.9
EFFECTIVE WIDTH (B1)IN M 0.497
DEPTH OF FOOTING REQUIRED in mm 202
OVER ALL DEPTH OF FOOTING PROVIDED(FLAT+SLOPE) 375
FLAT DEPTH in mm 225
SLOPE DEPTH in mm 150
EFFECTIVE DEPTH in mm 310
Longer Dir- REINFORCEMENT in mm2 430.15
DIA OF REINFORCEMENT in mm 10 Pt%
MIN Reinforcement in mm2 524 0.34
REINFORCEMENT Required in mm2 524
Y16mm 518
SPACING
Y12mm 291 AREA OF
PROVIDED
Y10mm 202 BAR
PROVIDED REINFORCEMENT SPACING in mm Y12-150 150 78.6
AST PROVIDED in mm2 707 707
Shorter Dir- REINFORCEMENT in mm2 319.83
DIA OF REINFORCEMENT in mm 10 Pt%
MIN Reinforcement in mm2 524 0.34
REINFORCEMENT Required in mm2 524
Y16mm 518
Y12mm 291 SPACING AREA OF
Y10mm 202 PROVIDED BAR
PROVIDED REINFORCEMENT SPACING in mm 202 78.6
AST PROVIDED in mm2 524 524
ONEWAY SHEAR CALCULATION
CANTILIVER LENGTH in mm 560
BALACE LENGTH in mm 250
D1 in mm 66.96
D1+Def in mm 226.96
Critical N.A in mm 90.79
Yb in mm -88.93
B1 in mm 1527.87
EFFECTIVE WIDTH 1350.00
SHEAR (V)KN 85.98
SHEAR STRESS in N/mm2 0.281
Pt=(Ast/bd)X100 0.46
BETA= 5.06
TC in N/mm2 0.462
CHECK FOR ONE WAY SHEAR Tv<Tc SAFE
TWO WAY SHEAR CALCULATION
B*D IN M2 1.82
B0*D0 IN M2 0.370
SHEAR(V) KN 370.073
PERIMETER IN Mts 2.450
EFFECTIVE DEPTH in mm 268.482
Tv in N/mm2 0.563
Tc in N/mm2 1.118
CHECK FOR TWO WAY SHEAR Tv<Tc SAFE
RESULTS

Effective Depth 310


Check for NUPI SAFE
Oneway Shear SAFE
Two Way Shear SAFE
Check for bearing pressure SAFE
ISOLATED SLOPED FOOTING DESIGN
M20,25,30,35 GRADE CONCRETE, FE415,500,550GRADE STEEL( 1side restricted) H5
fck 20
fy 500
COLUMN/PEDESTAL WIDTH(M) 0.45
COLUMN/PEDESTAL DEPTH(M) 0.45
LOAD FROM STRUCTURE(P)( KN) 983
MOMENT-Mx(KN.M) 2.58
MOMENT My(KN.M) 0.64
ADD 10% AS SELF WEIGHT(KN) 98.3
TOTAL LOAD(KN) 1081.3
SBC OF SOIL(KN/SQ.M) slope 350
Approx AREA OF FOOTING in SQ.M flat 2.06
approx LONGER SIDE OF FOOTING IN Mts 2.30
approx SHORTER SIDE OF FOOTING IN Mts 1.29
LONGER SIDE OF FOOTING(A)(M) 1.80
SHORTER SIDE OF FOOTING(B)(M) 1.20
Check for Area of Footing Provided OK
Check For NUPI SAFE
Zx 0.65
Zy 0.43
MAX.NET UPWARD PRESSURE(KN/SQ.M) 462.1
MOMENT(ALONG LONGER SIDE,A)KN.M 233.9
MOMENT(ALONG SHORTER SIDE,B)KN.M 126.3
EFFECTIVE WIDTH (B)IN M Longer 0.619
EFFECTIVE WIDTH (B)IN M Shorter 0.544
DEPTH OF FOOTING REQUIRED in mm 443
OVER ALL DEPTH OF FOOTING PROVIDED(FLAT+SLOPE) 600
FLAT DEPTH in mm 230
SLOPE DEPTH in mm 370
EFFECTIVE DEPTH in mm 525
REINFORCEMENT (Longer-Dir) in mm 2
1169.5
MIN Reinforcement in mm 2
1104 Pt
DIA OF REINFORCEMENT in mm 10
REINFORCEMENT Required in mm2 1170
Y16mm 309 SPACING
Y12mm 174 PROVIDE
Y10mm 121 D
PROVIDED REINFORCEMENT SPACING in mm Y12mm 150
AST PROVIDED in mm2 943 943.2
REINFORCEMENT (Shorter-Dir) in mm2 603.4
MIN Reinforcement in mm2 952 Pt
DIA OF REINFORCEMENT in mm 10
REINFORCEMENT Required in mm2 952
Y16mm 253 SPACING
Y12mm 142 PROVIDE
D
SPACING
PROVIDE
Y10mm 99 D
PROVIDED REINFORCEMENT SPACING in mm Y10mm 100
AST PROVIDED in mm2 943 943.2

ONEWAY SHEAR CALCULATION: LONGER DIR


CANTILIVER LENGTH in mm 750
BALACE LENGTH in mm 225
D1 in mm 111.00
D1+Def in mm 276.00
Critical N.A in mm 110.40
Yb in mm 1.22
B in mm 1797.57
EFFECTIVE WIDTH 1797.57
SHEAR (V)KN 187.13
Shear Stress in N/mm2 0.377
Pt=(Ast/bd)X100 0.290
BETA= 7.998
TC in N/mm2 0.383
CHECK FOR ONE WAY SHEAR Tv<Tc SAFE

ONEWAY SHEAR CALCULATION: SHORTER DIR


CANTILIVER LENGTH in mm 675
BALACE LENGTH in mm 150
D1 in mm (Sloped) 82.22
D1+Def in mm 247.22
Critical N.A in mm 98.889
Yb in mm -30.405
B in mm 1260.811
EFFECTIVE WIDTH 1200.000
SHEAR (V)KN 83.17
Shear Stress in N/mm2 0.280
Pt=(Ast/bd)X100 0.330
BETA= 7.03
TC in N/mm2 0.404
CHECK FOR ONE WAY SHEAR Tv<Tc SAFE

TWO WAY SHEAR CALCULATION


L*B IN M2 2.16
a*b IN M2 0.695
SHEAR(V) KN = qu[(L*B)-(a*b)] 677.1
PERIMETER IN Mts 2.400
EFFECTIVE DEPTH in mm 391.1
Tv in N/mm2 0.721
Tc in N/mm2 1.118
CHECK FOR TWO WAY SHEAR Tv<Tc SAFE
CHECK FOR TRANFER OF LOAD AT COLUMN BASE
Actual Bearing Stress 4.85
A1 8.1225
A2 0.2025
A1/A2 6.33
Limit A1/A2 2
Consider A1/A2 2.00
Concrete Bearing Stress 18
CHECK FOR BEARING PRESSURE SAFE
B6 9" 15"
A7 9" 15"
A8 9" 15"
B1 15" 9"
E1 15" 9"
H1 15" 9"
H5 9" 18"
C1 18" 9"
RESULTS F2 9" 9"
Effective depth 525 G2 9" 9"
Check For NUPI SAFE C8 18" 9"
Oneway Shear Calculation Longer Dir SAFE H8 9" 24"
Oneway Shear Calculation Shorter Dir SAFE C7 9" 24"
Two Way Shear SAFE E5 24" 9"
Check for transfer of load at column base SAFE C4 9" 15"

Actual Pt% with full breadth of footing


0.34 0.124

AREA OF
BAR
78.6

0.34

AREA OF
BAR
78.6

D1 in mm 316.25
B1 in mm 1631.25

D1 in mm 287.50
B1 in mm 1106.25
ISOLATED SLOPED FOOTING DESIGN
M20,25,30,35 GRADE CONCRETE, FE415,500,550 GRADE STEEL (2 sides restricted)
M20 20
Fy 500
COLUMN/PEDESTAL WIDTH(M) 0.45
COLUMN/PEDESTAL DEPTH(M) 0.45
LOAD FROM STRUCTURE(P)( KN) 983
MOMENT-Mx(KN.M) 2.58
MOMENT My(KN.M) 0.64
ADD 10% AS SELF WEIGHT(KN) 98.3
TOTAL LOAD(KN) 1081.3
SBC OF SOIL(KN/SQ.M) slope 350
Approx AREA OF FOOTING in SQ.M flat 2.06
approx SIDES OF FOOTING IN Mts 1.44
LONGER SIDE OF FOOTING(A)(M) 1.50
SHORTER SIDE OF FOOTING(B)(M) 1.50
Check for Area of Footing Provided OK
Check For NUPI SAFE
Zx 0.56
Zy 0.56
MAX.NET UPWARD PRESSURE(KN/SQ.M) 442.613
MOMENT(ALONG SIDE,A)KN.M 366.0
MOMENT(ALONG SIDE,B)KN.M 366.0
EFFECTIVE WIDTH (B1)IN M 0.581
DEPTH OF FOOTING REQUIRED in mm 487
OVER ALL DEPTH OF FOOTING PROVIDED(FLAT+SLOPE) 675
FLAT DEPTH in mm 450
SLOPE DEPTH in mm 225
EFFECTIVE DEPTH in mm 607
Longer Dir- REINFORCEMENT in mm 2
1558.99
DIA OF REINFORCEMENT in mm 12
MIN Reinforcement in mm2 1200
REINFORCEMENT Required in mm2 1559
Y16mm 193
Y12mm 109
SPACING
PROVIDED
Y10mm 76
PROVIDED REINFORCEMENT SPACING in mm 125
AST PROVIDED in mm2 1356 1356
Shorter Dir- REINFORCEMENT in mm2 1558.99
DIA OF REINFORCEMENT in mm 12
MIN Reinforcement in mm2 1200
REINFORCEMENT Required in mm2 1559
Y16mm 193
Y12mm 109
SPACING
PROVIDED
Y10mm 76
PROVIDED REINFORCEMENT SPACING in mm 125
AST PROVIDED in mm2 1356 1356.00
ONEWAY SHEAR CALCULATION
CANTILIVER LENGTH in mm 1050
BALACE LENGTH in mm 443
D1 in mm 94.93
D1+Def in mm 476.93
Critical N.A in mm 190.77
Yb in mm -447.27
B1 in mm 2394.53
EFFECTIVE WIDTH 1500.00
SHEAR (V)KN 294.12
SHEAR STRESS in N/mm2 0.411
Pt=(Ast/bd)X100 0.38
BETA= 6.04
TC in N/mm2 0.430
CHECK FOR ONE WAY SHEAR Tv<Tc SAFE
TWO WAY SHEAR CALCULATION
L*B IN M2 2.25
a*b IN M 2
0.568
SHEAR(V) KN= qu[(L*B)-(a*b)] 744.581
PERIMETER IN Mts 1.507
EFFECTIVE DEPTH in mm 541.964
Tv in N/mm2 0.912
Tc in N/mm2 1.118
CHECK FOR TWO WAY SHEAR Tv<Tc SAFE
CHECK FOR TRANFER OF LOAD AT COLUMN BASE
Actual Bearing Stress 4.85
A1 9.9225
A2 0.2025
A1/A2 7.00
Limit A1/A2 2
Consider A1/A2 2.00
Concrete Bearing Stress 18
CHECK FOR BEARING PRESSURE SAFE
B6 9" 15"
A7 9" 15"
A8 9" 15"
B1 15" 9"
E1 15" 9"
H1 15" 9"
H5 9" 18"
C1 18" 9"
F2 9" 9"
G2 9" 9"
C8 18" 9"
H8 9" 24"
C7 9" 24"
RESULTS E5 24" 9"
Effective Depth 607 C4 9" 15"
Check For NUPI SAFE
Oneway Shear SAFE
Two Way shear SAFE
Check for bearing pressure SAFE

Pt

0.34

AREA OF BAR
113

Pt

0.34

AREA OF BAR
113
ISOLATED SLOPED FOOTING DESIGN
M20,25,30,35 GRADE CONCRETE, FE415,500,550GRADE STEEL( 1side restricted) H5
fck 20
fy 500
COLUMN/PEDESTAL WIDTH(M) 0.45
COLUMN/PEDESTAL DEPTH(M) 0.45
LOAD FROM STRUCTURE(P)( KN) 983
MOMENT-Mx(KN.M) 2.58
MOMENT My(KN.M) 0.64
ADD 10% AS SELF WEIGHT(KN) 98.3
TOTAL LOAD(KN) 1081.3
SBC OF SOIL(KN/SQ.M) slope 350
Approx AREA OF FOOTING in SQ.M flat 2.06
approx LONGER SIDE OF FOOTING IN Mts 2.30
approx SHORTER SIDE OF FOOTING IN Mts 1.29
LONGER SIDE OF FOOTING(A)(M) 1.80
SHORTER SIDE OF FOOTING(B)(M) 1.20
Check for Area of Footing Provided OK
Check For NUPI SAFE
Zx 0.65
Zy 0.43
MAX.NET UPWARD PRESSURE(KN/SQ.M) 462.1
MOMENT(ALONG LONGER SIDE,A)KN.M 233.9
ECCENTRIC DISTANCE IN SHORTER SIDE 1.05
MOMENT(ALONG SHORTER SIDE,B)KN.M 305.6
EFFECTIVE WIDTH (B)IN M Longer 0.619
EFFECTIVE WIDTH (B)IN M Shorter 0.544
DEPTH OF FOOTING REQUIRED in mm 506
OVER ALL DEPTH OF FOOTING PROVIDED(FLAT+SLOPE) 675
FLAT DEPTH in mm 525
SLOPE DEPTH in mm 150
EFFECTIVE DEPTH in mm 600
REINFORCEMENT (Longer-Dir) in mm 2
986.85
MIN Reinforcement in mm 2
1262 Pt 0.34
DIA OF REINFORCEMENT in mm 10
REINFORCEMENT Required in mm2 1262
Y16mm 287 SPACING
Y12mm 161 PROVIDE AREA
Y10mm 112 D OF BAR
PROVIDED REINFORCEMENT SPACING in mm 150 78.6
AST PROVIDED in mm2 943 943.2
REINFORCEMENT (Shorter-Dir) in mm2 1367.63
MIN Reinforcement in mm2 1087 Pt 0.34
DIA OF REINFORCEMENT in mm 12
REINFORCEMENT Required in mm2 1368
Y16mm 176 SPACING
Y12mm 99 PROVIDE AREA
Y10mm 69 D OF BAR
PROVIDED REINFORCEMENT SPACING in mm 125 113
AST PROVIDED in mm2 1085 1084.8

ONEWAY SHEAR CALCULATION: LONGER DIR


CANTILIVER LENGTH in mm 750
BALACE LENGTH in mm 150
D1 in mm 30.00
D1+Def in mm 490.00
Critical N.A in mm 196.00
Yb in mm -830.00
B in mm 3460.00
EFFECTIVE WIDTH 1800.00
SHEAR (V)KN 124.75
Shear Stress in N/mm2 0.141
Pt=(Ast/bd)X100 0.254
BETA= 9.140
TC in N/mm2 0.362
CHECK FOR ONE WAY SHEAR Tv<Tc SAFE

ONEWAY SHEAR CALCULATION: SHORTER DIR


CANTILIVER LENGTH in mm 1050
BALACE LENGTH in mm 450
D1 in mm (Sloped) 64.29
D1+Def in mm 521.29
Critical N.A in mm 208.514
Yb in mm -1010
B in mm 3219.200
EFFECTIVE WIDTH 1200.000
SHEAR (V)KN 249.51
Shear Stress in N/mm2 0.399
Pt=(Ast/bd)X100 0.333
BETA= 6.98
TC in N/mm2 0.4051
CHECK FOR ONE WAY SHEAR Tv<Tc SAFE

TWO WAY SHEAR CALCULATION


L*B IN M2 2.16
a*b IN M2 0.788
SHEAR(V) KN = qu[(L*B)-(a*b)] 634.2
PERIMETER IN Mts 1.500
EFFECTIVE DEPTH in mm 543.3
Tv in N/mm2 0.778
Tc in N/mm2 1.118
CHECK FOR TWO WAY SHEAR Tv<Tc SAFE

CHECK FOR TRANFER OF LOAD AT COLUMN BASE


Actual Bearing Stress 4.85
A1 9.9225
A2 0.2025
A1/A2 7.00
Limit A1/A2 2
Consider A1/A2 2.00
Concrete Bearing Stress 18
CHECK FOR BEARING PRESSURE SAFE
RESULTS
Effective depth 600
Check For NUPI SAFE
Oneway Shear Calculation Longer Dir SAFE
Oneway Shear Calculation Shorter Dir SAFE
Two Way Shear SAFE
Check for transfer of load at column base SAFE

Actual Pt% with full breadth of footing


0.091
D1 in mm 641.67
B1 in mm 1650.00

D1 in mm 875.00
B1 in mm 1116.67