Parameters Units
Mass Flow Rate Kg/hr
Density Kg/m3
Viscosity cP
Particle Diameter to be removed µm
Volumetric Flow Rate m3/hr
Minutes
( Bottom - NIL for
Residence Time heavy phase ) and
(NIL-NLL for light
phase)
mm
Selected NILL
Selected NILL/D
Volume Fraction at Selcted NILL
mm
LLILL
LLILL/D
Volume Fraction at Selcted LLILL
LILL mm
LILL/D
Volume Fraction at Selcted LILL
HILL mm
HILL/D
Volume Fraction at Selcted HILL
HHILL mm
HHILL/D
Volume Fraction at Selcted HHILL
Retention time at NILL to BTL Minutes
Retention time at HHILL to BTL Minutes
Retention time at HILL to BTL Minutes
Retention time at LILL to BTL Minutes
Retention time at LLILL to BTL Minutes
Volume Fraction @NLL
LLL mm
LLL/D
Volume Fraction at LLL
Retention Time for Light Phase at NLL to BTL
Retention Time for Light Phase at HHLL to HLL Minutes
Retention Time for Light Phase at HLL to LLL Minutes
Retention Time for Light Phase at HLL-BTM Minutes
Vt Terminal Velocity
NLL -NILL (Heavy particles from light phase) m/s
Selected Vt (Terminal Velocity) m/s
Stokes's Law Settling Time Minutes
Selcted HLL
Height above HLL
Height above HLL/D
Area corresponding to the height above HLL
Area above HLL
Stokes's Law Settling Time for Heavy phase to settle out of light
liquid Minutes
Stokes's Law Settling Time for Light phase to settle out of heavy
liquid Minutes
Available Retention Time (NIL to Boot BTL) based on Heavy Phase
Flow rate Minutes
e Separator Sizing Sheet (GPSA)
Light Phase
(Condesate/O Heavy Phase (Water)
Gas il) (ll) (hl)
28539.09 4650.048 10432.9
77.86 780 1050
0.013 0.35 0.7
150 100 100
366.5 6.0 9.9
2.5 2.5
2.5
1.3
814.58
1200
4.071384
3600
0.102
0.152825638792003
183.390766550404
500
0.416666666666667
0.3827
250
0.208333333333333
0.160807851122265
350
0.291666666666667
0.249570991571172
650
0.541666666666667
0.559468911072629
750
0.625
0.654941051237649
9
16
14
6
4
0.444
0.562
674.4
700
0.583333333333333
0.607204981155139
0.542
0.526284923811147
632
800
0.667
0.7027
840
0.7
0.740865977386167
400
0.333333333333333
0.293952561795625
7.73
0.49
16.75
28.79
0.0042
0.00424
0.8
2.5
0.002
0.0020
4.2
2.5
0.0064
0.006522
OK
0.293065031534889
0.347423522541271
0.115692328359357
OK
5
1.1307312
0.4968
400
0.333333333333333
0.288888888888889
0.32665568
890
310
0.258333333333333
0.22927852247
864.305141006014
0.500
5
4219
1.5
1266
2
1688
4019
7173
0.0042
0.002
15.93274
31.86549
4.7630
SA)
Remarks
For light phase, residence time will also include 1/2 of the surge time between
(LLL-HLL) i.e. from NLL-HLL , and 1 minute will be added for HLL to HHLL
Following Formula has been developed on the basis of Fig.6.24 GPSA 13th
Edition
H/D= ((VF+0.0611)/1.12472)*1.0559 if VF<0.5 or
(VF+0.0611)/1.12472)*0.9817 if VF>0.5
LLILL+100 mm
HILL+100
0.70*Diameter of separator
HILL+300 (if there is weir installed)or LLL =Standpipe +300 mm and standpipe
is at HILL+150
𝑉𝑡=1000∗𝑔∗ 〖𝐷𝑝〗 ^2 ∗(⍴𝑙𝑙−⍴ℎ𝑙)/18µll
Height (NLL-NILL)/Vt
OK
Available Settling Time > Stokes's Law Settling Time
𝑉𝑡=1000∗𝑔∗ 〖𝐷𝑝〗 ^2 ∗(⍴𝑙𝑙−⍴ℎ𝑙)/18µhl
Height (NILL-Bottom)/Vt
OK
Available Settling Time > Stokes's Law Settling Time
Assuming mesh pad area is equal to the cross sectional above HHLL
200 mm below weir Top which is equal to NLL in the settling comparment
In KIRK sheet length is lower as we don’t account for the volume in the head
Normally it is taken as standatd pipe sizes i.e. 14", 16" 18"