You are on page 1of 40

KARNATAKA

RISING
Maharashtra
Telangana

Goa Andhra Pradesh

KARNATAKA

Tamil Nadu
Kerala

In the dynamic State of Karnataka, the length of


National Highways before May 2014 was 6,760 km.
During 2014-2018 the NH sector has seen 100%
growth, and 372 km of new NH have been built in
the past 4 years. In 2018, the total length of National
Highways in the State including in-principle NH is
13,565 km. 163 projects, spanning a length of 3,345 km
worth Rs. 30,365 Cr have been sanctioned in Karnataka.
“When a network of good roads is
created, the economy of the country
also picks up pace. Roads are veins
and arteries of the nation, which help
to transform the pace of development
and ensure that prosperity reaches
the farthest corners of our nation.”
NARENDRA MODI
Prime Minister
“In the past four years, we have expanded the
length of Indian National Highways network to
1,26,350 km. The highway sector in the country has
seen a 20% growth between 2014 and 2018. Tourist
destinations have come closer. Border, tribal and
backward areas are being connected seamlessly.
Multimodal integration through road, rail and port
connectivity is creating socio economic growth
and new opportunities for the people.
In the coming years, we have planned projects with
investments worth over Rs 6 lakh crore, to further
expand the world’s second largest road network.”
NITIN GADKARI
Union Minister, Ministry of Road Transport &
Highways, Shipping and Water Resources,
River Development & Ganga Rejuvenation
Fast tracking National Highway
development in Karnataka
NH + IN PRINCIPLE NH LENGTH
UPTO YEAR 2018

13,565 km

NH LENGTH
UPTO YEAR 2014

6,760 km
Adding new
National Highways
in Karnataka

13,565 km
6,760 km

Yr 2014 - 2018
Yr 2010 - 2014

New NH New NH & In principle NH length

6
Construction of roads
in Karnataka

1,677 km
956 km

Yr 2014 - 2018
Yr 2010 - 2014

Constructed Constructed
length length

1,677 km of National Highways have


been built in 4 years

7
Road Projects
awarded in Karnataka

Yr 2010 - 2014 Yr 2014 - 2018

2,376 km 3,135 km

Total Cost Total Cost


Rs. 8,689 Cr Rs. 26,537 Cr

Growth of 205% in the awarded length


of road projects over last 4 years with
investments worth Rs. 26,537 Cr

8
Accelerated NH Development
under Central Road Fund (CRF)
in Karnataka
Yr 2010 - 2014 Yr 2014 - 2018

Total Cost Total Cost


Rs. 2,602 Cr Rs. 5,727 Cr

Significant increase of 120% in cost


of CRF works sanctioned for the
upgradation & improvement of roads &
bridges in the State

9
Landmark Projects
in Karnataka

10
Bengaluru Ring Road (STRR)
The Bengaluru Ring Road is being developed at a
tentative cost of Rs. 15,000 Cr. The project has 240
km in Karnataka and 45 km in Tamil Nadu. Under this
project, which is a part of the Bharatmala Pariyojana,
NHAI will implement the entire STRR around
Bengaluru. This Ring Road stretch will connect Hosur,
Anekal, Kanakapura, Ramanagara, Magadi, Dabaspet,
Doddaballapura, Devanahalli and Hoskote.

At a Glance
285 km Rs. 15,000 Cr
total length total cost

11
Shiradi Ghat Tunnel
The Shiradi Ghat Tunnel, spanning a total length 23.60
km is being built at a tentative cost of Rs. 10,000 Cr.
The tunnel, on completion, will connect with many
bridges, the longest bridge being 1.50 km in length
with highest pier of 100 mtr.

At a Glance
6 tunnels with a total Emergency lane for
length of 12.60 km each tube
2 driving lanes 10.50 m carriage
way width

12
Ring Road to Belgaum
Spanning a total length of 55 km, the 4/6 lane
Belgaum bypass will be built at a tentative cost
of Rs. 1,500 Cr, connecting NH-4 to NH-4A. It will
ease the traffic congestion in the city.

At a Glance
55 km total length Rs. 1,500 Cr total cost

13
6 laning and Access Control of
Bengaluru –Mysore section
This project is a part of the Bengaluru-Malappuram
Economic Corridor. The entire project has been
provided with Access Control, along with Service
Road. DPR has already been completed. Bids have
been received and awarded.

At a Glance
117 km total length 9 major bridges
Rs. 7,000 Cr 4 ROBs
estimated cost
8 km elevated
corridors

14
Bengaluru-Chennai Expressway
Bengaluru – Chennai Expressway has been planned as
a greenfield Expressway. It will serve as a key logistics
corridor, fast tracking import/export and improving
connectivity to the Chennai port. This project has
been identified as one of the priority projects under
Chennai–Bengaluru Industrial Corridor (CBIC). The
Expressway, worth Rs. 16,000 Cr, will pass through
three states, covering 76 km in Karnataka, 91 km in
Andhra Pradesh & 94 km in Tamil Nadu. On completion,
it will connect the proposed Multimodal Logistic Park
at Dobaspet, which is also accessible via NH207 or
Bengaluru Ring Road from BCE.

At a Glance
261 km total length Rs. 16,000 Cr
total cost

15
Bengaluru - Amaravati section
Bengaluru and Amaravati are connected via
two routes, Anantapur and Tirupati. The work on
Bengaluru - Amaravati section via Anantapur,
passing through NH-7 has been completed. This
4.5 km long 4 lane Elevated Highway now links the
Bengaluru International Airport.

The 4/6 lane road from Bengaluru to Amaravati


via Tirupati passing through Bengaluru – Kolar –
Mulbagal – Karnataka / Andhra Pradesh border on
NH-4 has been completed.

Hyderabad – Bengaluru section


The 4.5 km long 4 lane Elevated Highway on
NH-7 has been completed. Passing through the
Bengaluru International Airport, it connects
Bengaluru with Hyderabad, via Anantapur.

Under Setu Bharatam


7 Road Over Bridges (ROB) worth Rs. 473 Cr are in
tender stage. 4 laning of 1 ROB on Bellary–Hiriyur
section under Bharatmala Pariyojana is in progress.

16
Hubli-Haveri section
6 Laning & Strengthening of NH-48 ( Old NH-4) to be
Details
executed on Hybrid Annuity mode

Length 63.4 km

Total Project Cost Rs. 1200 Cr

Name of the district, the


Dharwad, Haveri
project passes through
Stage Work in progress

Hubli–Hospet section
4 Laning of Hubli – Hospet Section of NH-63 on EPC Mode.
Details
Project Road start from Proposed Hubli Bypass to Hospet.

Length 143.721 km

Total Project Cost Rs. 1334.70 Cr

Name of the district,


the project passes Dharwad, Gadag & Koppal
through
Stage Under Implementation

17
Belgaum-Dharwad section
Details 6 Laning of Belgaum-Dharwad Section of NH-4

Length 79.36 km

Total Project Cost Rs. 630 Cr

Name of the district, the


Dharwad & Belgaum
project passes through
Stage Operation & Maintenance

Hospet-Bellary-Karnataka /
AP Border section
4/6 Laning of Hospet-Bellary-Karnataka/AP Border section
Details
of NH-63

Length 95.37 km

Total Project Cost Rs. 870 Cr

Name of the district,


the project passes Bellary
through
Stage Under Implementation

18
Hungund-Hospet section
Details 4/6 Laning of Hungund-Hospet Section of NH-13

Length 97.87 km

Total Project Cost Rs. 946 Cr

Name of the district, the


Bagalkot, Koppal, Bellary
project passes through
Stage Operation & Maintenance

Davanagere-Haveri section
Details 6 Laning of Davanagere - Haveri section of NH-48 (Old NH-4)

Length 72.983 km

Total Project Cost Rs. 1,177 Cr

Name of the district,


Davangere, Haveri
the project passes
through
Stage Work in progress

19
Hospet-Chitradurga section
Details 4 Laning of Hospet-Chitradurga section of NH-50 (Old NH-13)

Length 120 km

Total Project Cost Rs. 1,388 Cr

Name of the district,


the project passes Chitradurga, Bellary and Davangere
through

Stage Work in progress

Maharashtra/Karnataka Border to
Sangareddy section
4 Laning of MH/KNT Border to Sangareddy section of NH-09
Details
(New NH-65) under NHDP

Length 145 km

Total Project Cost Rs. 1,544.18 Cr

Name of the district,


the project passes Sangareddy and Bidar
through

Operation & Maintenance (Completed except COS


Stage
works of 2.2 Kms)

20
Bijapur-Gulbarga-Homnabad section
Development and Upgradation of Bijapur-Gulbarga-
Details Homnabad section of NH-218 to 2-lane with Paved
Shoulders

Length 220.01 km

Total Project Cost Rs. 523 Cr

Name of the district, the


Bijapur, Gulbarga & Bidar
project passes through
Stage Under Implementation

Bijapur–Hungund section
4 Laning of Bijapur – Hungund Section of NH-13 (New NH-50) in
Details the State of Karnataka under NHDP Phase-III on Design, Build,
Finance

Length 97.212 km

Total Project Cost Rs. 748 Cr

Name of the district,


the project passes Bijapur, Bagalkot
through
Stage Operation & Maintenance

21
Belgaum Maharashtra Border Road Project
Upgradation and rehabilitation of Belgaum Maharashtra
Details
border road

Length 77.705 km

Total Project Cost Rs. 599.49 Cr

Name of the district, the


Belgavi
project passes through
Stage Operation & Maintenance

22
Ongoing projects in
North Karnataka
Chittapur Cross to start of Yadgir Bypass
Widening to 2/4 lane with paved shoulders
Details
of NH-150

Length 36.90 km

Total Project Cost Rs. 314.9 Cr

Other Structures in
Construction of 1 Toll Plaza & 1 Grade separator
the Project

Mode of construction EPC

Status Work in progress

End of Yadgir Bypass to A P Border


Widening to 2/4 Lane with Paved Shoulders of
Details
NH-150 package 2

Length 38.82 km

Total Project Cost Rs. 329.01 Cr

Other Structures in
Construction of 2 Major Bridges, 1 Fly Over & 1 Toll Plaza
the Project

Mode of construction EPC

Status Work in progress

23
Maharashtra Border to Bidar section
Details Widening to 2/4 lane with Paved Shoulders of NH-50

Length 54.370 km

Total Project Cost Rs. 396.96 Cr

Other Structures in
Construction of 1 Toll Plaza & 1 Fly Over
the Project

Mode of construction EPC

Status Work in progress

Bidar-Humnabad section
Widening to 2/4 lane with Paved Shoulders of NH-50
Details
under package 2

Length 47.030 km

Total Project Cost Rs. 367.44 Cr

Other Structures in Construction of 3 Major Bridges, 1 Toll Plaza,


the Project 1 Fly Over & 1 Vehicle Underpass

Mode of construction EPC

Status Work in progress

24
Hagari-Jadacherla section
Widening to 2 lane with Paved Shoulders
Details
of NH-167

Length 30.174 km

Total Project Cost Rs. 175.19 Cr

Other Structures in
Construction of 1 Major Bridge and 1 Toll Plaza
the Project

Mode of construction EPC

Status Work in progress

Bijapur-Hubli section 1
Widening to 2 lanes with Paved Shoulders of NH-218
Details
from km 4.40 to km 56.00

Length 50.525 km

Total Project Cost Rs. 214.21 Cr

Other Structures in
Construction of 2 Major Bridges and 1 Toll Plaza
the Project

Mode of construction EPC

Status Work in progress

25
Bijapur-Hubli section 2
Widening 2 Lane with Paved Shoulders of NH-218 from
Details
km 56.00 to km 106.00

Length 50.00 km

Total Project Cost Rs. 159.12 Cr

Other Structures in
Construction of 1 Toll Plaza.
the Project

Mode of construction EPC

Status Work in progress

Bijapur-Hubli section 3
Widening to 2 lane with Paved Shoulders of NH-218 from
Details
km 106.00 to km 153.00

Length 45 km

Total Project Cost Rs. 165.67 Cr

Other Structures in
Culverts
the Project

Mode of construction EPC

Status Work in progress

26
Bijapur-Hubli section 4
Strengthening and widening with Paved Shoulders
Details
of NH-218 from km 153.00 to km 193.35

Length 40.305 km

Total Project Cost Rs. 110.9 Cr

Other Structures in
Construction of 1 Toll Plaza
the Project

Mode of construction EPC

Status Work in progress

Future Projects in Karnataka


Sl.
Name Length in km Total Cost (Rs. Cr)
No.

Widening of NH 73 declared to 2 lane


1 + paved shoulders/ 4 lane (in principle 6,433 38,598
declared NH)

2 28 projects under Bharatmala Pariyojana 2,094 56,300

3 120 works under progress 2,996 36,663

4 21 works to be awarded 278 2,285

  Total   1,33,846

27
Projects to be Awarded in Karnataka
Sl. Name of Project Length Sanctioned
No. (km) Cost / TPC
Rs. in Cr

1 Strengthening of NH-275 Bantwala - Bengaluru section 24.34 21.14

2 Improvement and Reconstruction to 2 lane with paved shoulders of 45.46 332.03


Mudigere – Kadur section of NH-173 -through EPC mode.

3 Two lane with paved houlders from km 214.88 to 235.100 of NH 150A 20.22 94.01

4 Construction of 4 lane ROB and its approaches in lieu of existing - 53.516


level crossing 56/T-C2 on NH 367

5 Construction of 4 lane ROB and its approaches in lieu of existing - 74.19


level crossing 14 at Km 276.820 on NH 150A

6 Construction of 4 lane ROB and its approaches in lieu of existing - 58.1294


Level Crossing 75 at Km 15 on NH 218

7 Construction of Major Bridge across river Krishna on NH 167 - 157.3184


Hagari Jadcherla section
8 Construction of 2 lane ROB and its approaches in lieu of existing - 42.46
level crossing No. 130 on NH 207 near Koraluru
9 Construction of 4 lane ROB and its approaches in lieu of existing - 86.33
level crossing 18 on NH 150A
10 Construction of proposed 4 lane ROB and its approaches in lieu of - 91.07
existing level crossing No. 48/E on NH 50 near Naubad

11 Reconstruction of Bridges on NH-234 - 14.72


12 Reconstruction of Major Bridge on Huliyar Banvara section - 14.09

13 Reconstruction to 2 Lane with Paved Shoulders on Huliyar-KB 50.06 242.61


Cross section & from KB Cross to Nelligere section of NH-150 A
through EPC mode
14 Minor Bridge parallel to existing bridge, NH 63 - -

15 Construction of four lane from Parkala to Malpe section of NH 169A 9 100

16 Upgradation of SH-57 to 2 lane with paved shoulder connecting 47.655 325.86


Chikkamagalur to Bilikere via Belur, Hassan, Holenarasipura,
Krishnarajanagar including 3 link road to NH on Hassan to
Yedegowdanahalli section
  Sub Total 197 1,707

Ongoing NHAI projects in Karnataka


Sl. Lok Sabha Project Stretch NH Project Length Start Date Likely
No. Constituency No. Cost in km date of
(Rs. Cr) completion

1 Ballari, Hospet - 13 1388 120 Feb-16 Aug-18


Davangere & Chitradurga
Chitradurga

2 Chitradurga & Chitradurga 4 1434 72.7 Dec-17 Jun-20


Davangere -Davanagere

3 Davangere & Davanagere 4 836 78.92 Feb-18 Jul-20


Haveri -Haveri

4 Haveri & Hubli - Haveri 4 1200 63.4 Feb-18 Feb-20


Dharwad

5 Belagavi Belgaum-Khanapur 4A 775.52 30 appointed -


Pkg I date pending

6 Belagavi & Khanapur-KN / 4A 380.07 54 appointed -


Uttara Kannada Goa Border (Pkg II) date pending

28
Ongoing NHAI projects in Karnataka
Sl. Lok Sabha Project Stretch NH Project Length Start Date Likely
No. Constituency No. Cost in km date of
(Rs. Cr) completion

7 Dharwad, Haveri Hubli - Hospet 63 2119 143.29 Apr-17 Apr-19


& Koppal section

8 Uttara Kannada Belakeri Port to SH- 360.6 59.3 appointed -


Kumta - Sirsi road of 69 date
Belekeri Port Road pending
Link Rd. and km
4.965 - km 60.00 of
SH-69
9 - Haveri - Yekambi SH- - 59.3 appointed -
69 date
pending

10 Bijapur, Bijapur - Gulbarga - 218 709 220.1 Mar-15 Sep-18


Gulbarga & Homnabad - ( New
Bidar NH No -50)
11 Bidar in MH / KNT Border 9 1267 145 Apr-14 Jun-18
Karnataka State Sangareddy
& Zaheerabad in
Telangana State
12 Dakshin Addahole to Baniwal 48 821 63.05 Mar-17 Sep-19
Kannada Pkg II

13 Hassan Hasan to Maranahally 48 574 45.14 Mar-17 Mar-19


Pkg I
14 Chitradurga Byrapura to 150A 779.8 49.95 appointed -
Challakere Section date
from km 308.550 to pending
km 358.500 of NH-
150 A
15 Ballari Hospet - Bellary - 63 870 95.37 Mar-17 Sep-19
Karnataka AP Border

16 Udupi & Dakshin Kundapur-Surathkal 17 804 90 Sep-10 Jun-18


Kannada & Mangalore - KNT /
Kerala Border
17 Uttara Kannada Goa / Karnataka 17 1655 187.24 Mar-14 Feb-19
(Karwar) Border-Kundapur
& Udupi Section
Chikkamagalur
18 Bangalore BRT Tiger Reserve 209 2030 170.92 Aug-17 Aug-19
south, Mandya & Boundary to
Chamrajnagar Bangalore section of
NH-209
19 Bangalore Bangalore-Nidagatta 275 1941.67 56.2 appointed -
North, date
Bangalore Rural pending
& Mandya
20 Mandya & Nidagatta-Mysore 275 2023.42 61 appointed -
Mysuru (Pkg II) date
pending
21 Tumkuru Tumkur-Shivamogga 206 877.51 53 appointed -
(Pkg-I) from date
Mallasandra to Karadi pending
village
22 Tumkuru & Tumkur-Shimoga 206 1155.15 57 appointed -
Hassan (Pkg-II) from km date
65.195 (Karadi) to km pending
121.900 (Banawara)
of NH-206
23 Hassan, Udupi, Tumkur-Shimoga 206 933.81 48 appointed -
Chikka (Pkg-III) from date
magaluru Banwara to pending
Bettadahalli

29
In-Principle declared NH in Karnataka

Sl. Stretch Tentative


No. Length (km)
As on
30/11/2017

1 From junction of NH-52 near Yallapur connecting Sidapura - Thalaguppa and 219.00
terminating at its junction with NH- 66 near Bhatkal

2 From junction of NH-48 near Belgaum connecting Bagalkot and terminating at 336.00
its junction with NH-167 near Raichur
3 From Sirsi, Haveri, Kudligi and termnating at its Junction with NH-150A near 247.00
Molakalnuru
4 From junction of NH-766 near Kalpetta connecting Mannanthavaadi in the 95.00
state of Kerala, H.D.Hote - Jayapura and terminating at Mysore in the state of
Karnataka (length in Karnataka = 95 km; Kerala = 50 km)
5 From junction of NH- 69 near Chintamani connecting Chelur, Rayacheruvu in 55.00
the state of Karnataka up to junction of NH- 42 near Tanakal in the state of A.P
(length in Karnataka= 55 km; Andhra Pradesh = 15 km)
6 From Junction of NH-150A near Molakalnuru- Rayadurg - Anantpur at junction 14.00
at NH-44 (length in Karnataka= 14 km; Andhra Pradesh = 110 km)
7 Tumkur-Kortatagere -Pavagada - Kalyandurg - joining up at Veparalla (length 116.00
in Karnataka= 116 km; Andhra Pradesh = 49 km)
8 From Junction of NH- 67 near Ram Nagar and terminating at its junction with 118.00
NH-66 near Sadashivagad in the state of Karnataka
9 From junction of NH- 48 near Davanagere and terminating at its junction with 60.00
NH 369 near Chennagiri
10 From junction of NH- 48 near Chitradurga connecting Chelkere, Pavagada 120.00
in the state of Karnataka and terminating at its junction of NH-44 near
Penukonda in the state of Andhra Pradesh (length in Karnataka= 120 km;
Andhra Pradesh = 26 km)
11 From junction of NH-50 near Gulbarga and terminating at its junction with NH- 64.00
65 near Umerga (length in Karnataka= 64 km; Maharashtra = 15 km)
12 From Junction of NH-48 near Sankeshwar connecting Gokak, Yargatta, 124.00
Munavalli and terminating at its junction with NH-52 near Nargunda
13 NH4 - Tadas - Kalgatagi - Dharwad - Hebsure - Navalgund - Annigeri - NH 63; 118.00
may be considered for In-Principle approval for preparation of DPR and subject
to adequacy of DPR, it may be considered for declaration as new NH
14 Stretch from Nargund (Nawalgund)– Belabaniki - Gajendragad - Kustagi - 141.00
Tavargere – Sindhanur on NH 150 A
15 Stretch from Koppal - Belgatti- Mundaragi- Bagevadi- Belhatti- Govandi- 114.00
Gurdur- Shiggon
16 Stretch from Khanapur- Haliyal- Yellapur on NH-52 101.00

17 Shringeri - Agalagundi – Jayapur –Balehannur – Hyrambi – Aldur – Nadipur 74.00

18 From Mysore(on NH-766) -Bannur-Mallavalli (on NH-948) 45.00

19 Raichur-Sindhnur 90.00

20 Bilikere-Holenarasipura-Hassan-Belur 131.00

21 Sankeshwar (Gotur) to Bijapur (SH 12) 185.00

22 Karnataka Border to Hunasanahalli-Kodihalli- Kanakapura-Ramanagara- 170.00


Magadi-Pavagada to Andhra Pradesh (Koratagere - Pavagada- Andhra Pradesh
is included at Sl. No. 72 balance length in Karnataka= 170 km)
23 Ginigera-Gangavathi-Manavi-Sindhnur-Kalmal-Raichur 130.00

24 Shimoga to NH 4 via Shikarpur, Hangal, Tadas 171.00

25 NH 4-Shimoga-Honnahalli-Malebennur-Harihara-NH 206 110.00

26 Karkala-Moodabidri-BC road (including overlapping stretch of 19 km of existing NH 44.00


169)
27 BC road-Kaikamba-Kateel-Mulki road 51.00

28 Thokkuttu-Mudippu-Melkar 28.00

29 Mariyammmnahalli-Itagi-Harapanahalli- Harihar Juction with NH4 140.00

30
In-Principle declared NH in Karnataka

Sl. Stretch Tentative


No. Length (km)
As on
30/11/2017

30 Junction with NH 206 at Sagara- Huvinalli-Holebaglu-Kalasvalli - Signadur 70.00


-Markutka (junction with NH 766 c)
31 Karwar-Kaiga-Mundgod-Savanur-Gadag-Gajendragad 318.00

32 Dandeli-Haliyal-Dharwad-Saundatti-Mudhol-Jamkandi-Vijaypura 270.00

33 Nargund-Gadag-Mundargi-Itgi-Jagalur 260.00

34 Afzalpur- Almel-Indi 42.00

35 Adoni - Raravi – Shiraguppa (Karnataka=19km, Telengana=25km) 19.00

36 Gangavathi – Tavaragera-Mudgal 70.00

37 Junction of NH 50 near Hungund-Aihole-Pattadakal-Badami- Ramdurg 85.00

38 Stretch starting from near Gurlapur-Mudhol-Bilgi cross on NH52 75.00

39 Lingasugur- Rodalabanda- Narayanapur- Nalatwad- Muddebihal- Huvinahippargi- 167.00


Devarhippargi- Tamba- Junction of SH41 and SH 34
40 Indi- Zalaki- Chadchan- Shiradona- Maharashtra border 48.00

41 Chincholi- Sedam- Chitapur- Wadi- Nalwar- Sannati- Shahapur (NH to NH link 170.00
road)
42 Jath (Mah)-Athani-near Gokak (Karnataka=92km, Maharashtra=26km) 92.00

43 Torangal- Sandur- Kudlagi 40.00

44 Bhalki-Basavakalyan (upto Jn of NH-65) 47.00

45 Belur to Chickmagalur 20.00

46 Channarayapattana-Holenarasipur-Arkalgud-Kodlipet-Madikeri 138.00

47 Kollegala-Hanur-MM Hills-Palar Road-Tamil Nadu border extended upto Mettur in 91.00


Tamil Nadu (Karnataka=91km, Tamil Nadu=30km)
48 Manipal-Karkala 18.00

49 Ramasmudra-Unjalkate 32.00

50 Beltangadi-Shiradi via Dharmasthala 25.00

51 Gundya-Subramanya 17.00

52 Kundapur-Koteshwar-Halady-Someshwara-Agumbe-Sringeri 88.00

53 Gundlupet (NH212) to Chamaraj Nagar (NH150A) 35.00

54 Manekhalli- Chincholi- Mariyan- Tandur- Mehboobnagar (Karnataka=54km, 54.00


Telangana=96km)
55 Madikeri- Virajpet- Makutta (in Karnataka) and connecting Kannur (in Kerala) 45.00
(Karnataka=45km, Kerala=55km)
56 The highway starting from its junction with NH-73 at Tumkur bypass connecting 47.20
Gulur, Nagavalli, Hebbur and terminating at its junction with new NH No-75 near
Kunnigal in the State of Karnataka.
57 Stretch from Kuppam on NH42 (Andhra Pradseh)- Kolar on NH-75 (Karnataka) 40.00
(Length in AP = 25km, Karnataka=40km)
58 Gooty connecting Pathikonda, Adoni, Madire, Hanaval, Kunthanahai, Upparahal, 15.00
Kowthalam, Urukunda, Halvi, Kumbalanuru, Manvi in the State of Karnataka
(Length in Andhra Pradesh-135.00 km, Karnataka-15.00 km)
59 Junction with NH-167 near Anjaneya Temple Swamy in the Andhra Pradesh 26.00
to Ballery in the State of Karnataka (length in Andhra Pradesh= 2.00 km,
Karnataka=26.00 km)
60 Junction of NH 161 near Nizampet-Narayankhed-Bidar (Junction at NH 50 in 11.00
Karnataka) (Length in Telangana=60 km; Karnataka= 11 km)
61 Hyderabad-Moinabad-Chevalla-Manneguda-Kodangal-Karnataka Border- Upto 45.00
Junction of NH 150 near Yadgir (Length in Telangana=135 km; Karnataka= 45 km)

31
In-Principle declared NH in Karnataka
Sl. Stretch Tentative
No. Length (km)
As on
30/11/2017

62 Bijapur- Yatnal (Karnatak) - Guddapur- Jatta- Junction of NH-166 near Nagaj 47.00
(Length in Maharashtra= 55 km ; Karnataka = 47 km)
63 NH-9 Connecting Tembhurni - Pandharpur-Mangalwedha-Vijapur Karnataka 15.00
border (Maharashtra= 125 km; Karnataka= 15 km)
64 Jahirabad-Bidar-Deglur (Maharashtra= 100; Karnataka= 58; Telangana= 25) 58.00

65 NH-3 Manmad – Kopargaon – Shirdi – Ahamednagar – Baramati – Phaltan – Vita – 73.00


Tasegaon – Miraj – Chikodi to NH 4 Belgaon (Maharashtra= 300 km; Karnataka= 73
km)
66 Joining NH 65 – Murval – Aalur – Akkalkote – Indi – Jhumuki (NH 13) – Bijapur 63.00
border (NH 13) (Maharashtra= 150 km Karnataka= 63 km)
67 Joining NH 65 – Jahirabad – Virur (NH 50) – Bhauki (NH 52) – Nilanga - Nitur - 42.00
Latur (Maharashtra= 100 km Karnataka= 42 km)
68 Rajura-Korpana-Adilabad road (Maharashtra= 61 km Karnataka= 21 km) 21.00

69 NH66-Sawantwadi-Aajara-Gadhinglaj-NH4 (Maharashtra= 102 km Karnataka= 4 4.00


km)
70 Vengurla-Math-Amboli- Chandgarh-Belgaon (Maharashtra= 100 km Karnataka= 11.00
11 km)
71 Madakasire-Rolla (AP/Karnataka border)-Sira in the State of Karnataka (Total 29.00
length= 67 km; Andhra Pradesh= 38 km; Karnataka= 29 km)
72 Road connecting Hodurg- Panathur- Bhagamandala- Madikeri (Kerala- 57 km and 53.00
Karnataka-53 km)
73 Road connecting Cherkala- Kalladka (Kerala- 28 km and Karnataka- 23 km) 23.00

74 Road connecting Vadakkenchery- Pollachi (Kerala- 40 km and Karnataka-22 km) 22.00

Sub Total 6392.20

75 Junction With NH-748 To Jamboti 20.00

76 Guruvayankare - Kandali 24.30

77 Kandali - Arsikere 26.50

78 Bidaregudi - Kodagihalli 21.10

79 Kodagihalli - Huliyar 22.90

80 Ballari - Alur Road 31.20

Sub Total 146.00

81 Sharavathi bridge connecting Sigandur temple with Sagartown located on NH- -


206
82 Hospet (NH-67) – Hampi– Gangawati 47.00

83 Chikmagalore – Magadi- Bellore Halgere 24.00

Sub Total 71.00

Total 6609.20

32
Key Indian National Highways

SRINAGAR
Jammu

Jalandhar

DELHI
Gurgaon
Jaipur Agra Lucknow Gorakhpur
Ajmer Muzaffarpur
Gwalior Kanpur
Allahabad Guwahati
Jhansi Purnea
Shivpuri
Udaipur Varanasi SILCHAR
Barhi
Ahmedabad Panagarh
Rajkot Vadodara Lakhnadon Kharagpur KOLKATA
PORBANDAR Surat
Nagpur
Bhubaneshwar
MUMBAI
Pune
Satara Hyderabad Vishakhapatnam
Arabian Sea
Eluru Vijayawada
Belgaum LEGEND
Chilakaluripet
Golden Quadrilateral
Tumkur
Hosur CHENNAI
Bangalore Ranipet North South Corridor
Selam Krishnagiri
Bay of Bengal East West Corridor
COCHIN Madurai
Lakshadweep
KANYAKUMARI
Indian Ocean

33
National Highways - India Story
Fast tracking National Highway Development

Building National Highways


A new Pace of Progress

NH LENGTH
NH LENGTH

91,287 km 1,26,350 km
Yr 2010-2014 Yr 2014-2018

New National Highways being built


86,371.5 km of New and In-Principle National
Highways added in 4 years

New NH
34,391.5 km
+
In principle NH length
51,980 km
New NH
Total
20,353.2 km
86,371.5 km

Yr 2010 - 2014 Yr 2014 - 2018

34
National Highways - India Story

Adding more National Highways


per day
Enhancing efficiency by building 28 km National 28
Highways per day in 4 years, up from 3 km km

22.5
km
16.6 2017-2018
km
12 2015-2016
km
2016-2017
2 3 2 3
km km km km
2014-2015

2013-2014
2012-2013
2010-2011 2011-2012 Rate of Highway
construction per day

Construction of roads
Rs. 3 lakh Cr worth investments in the road sector in 4 years
Significant growth of 158%
Yr 2014 - 2018

Yr 2010 - 2014 28,532 km


19,444 km

Total Cost
Rs. 1.16 lakh Cr
Total Cost
Rs. 3 lakh Cr

35
National Highways - India Story

Road Projects Awarded


100% increase in projects awarded with investments
of over Rs. 4.68 lakh Cr
Yr 2010-2014

Road Length Total Cost


25,609 km Rs. 1.62 lakh Cr
Yr 2014-2018

Road Length Total Cost


51,075.32 km Rs. 4.68 lakh Cr

Accelerated NH development
under Central Road Fund (CRF)
Significant increase of 207.6% in cost of CRF
works sanctioned for the upgradation & improvement
of roads /bridges in the Nation

2,876
Yr 2010 - 2014
Projects
935
Projects

Total Cost
Total Cost
Rs. 8,613.51 Cr Rs. 48,186.57 Cr
Yr 2014 - 2018

36
Transforming India’s Transport Sector
Key initiatives in 2014 -2018
Over the past four years, various smart initiatives on
Indian National Highways have resulted in transparent
processes, last mile connectivity, safer roads, upskilling,
new opportunities and employment for the people.

Motor Vehicle (Amendment) E Toll - FASTag to enhance


Bill 2017: To bring transparency, efficiency, and reduce long
reduce corruption queues at Toll plazas

E-Rickshaws for last mile Exemption from the


connectivity requirement of commercial
licence for LMV and LCV drivers

Driving training schools in every 0.2%-15% decrease in road


district for skill development accidents and fatalities till 2017

Road Safety Greater Compensation for Partnering with


Annual Plan accident victims of upto NGOs to ensure
Rs. 5 lakhs road safety

Green buses and electric vehicles have been introduced. Emission


standards have been upgraded for vehicles. BS VI norms along with
bio fuel B-100, flex-fuel E-85 or E-100 & ethanol ED-95, methanol
M-15 or M-100 and methanol MD-95 have been standardised

15% methanol blending can result in the replacement of around


31.9 million tons of crude oil. With crude oil prices at USD 54
per barrel, the use of clean energy biofuels will reduce fuel costs
resulting in significant savings. Compared to neat gasoline, M-15
reduces CO and HC emission by 40%. Biofuels will help in reducing
vehicle pollution levels in India

37
Anti Lock Braking System Model Automated
ensuring vehicle and Centres for checking
passenger safety fitness of vehicles

Vehicle Fleet modernization Simplified forms for


programme obtaining driving licences

Increasing Speed Limits from Taxi Policy Guidelines to


100 km/h to 120 km/h, at par ensure safe, secure and
with the global practices affordable journeys, while
reducing congestion
as well as pollution in cities

Indian Bridge Management System (IBMS), the world’s


largest inventory of bridges, has been created for proper
maintenance of these structures. Till date 1,72,519
bridges of all ages and structures have been inventoried
across India,and assigned GPS based Location Numbers,
Classification Numbers based on features, Structural Rating
& Socio-Economic Rating numbers

789 black spots have been identified and assigned unique


ID numbers. Guidelines have been prepared and notified for
investigation and rectification of these road accident-prone
black spots on National Highways. 265 spots have already
been rectified

Rectification measures at 318 spots have been sanctioned


and are in various stages of implementation. 139 spots are on
State Government roads or with other agencies. Remaining
67 spots would be taken up separately or rectified as part of
ongoing projects

38
Manzilen Abhi
Aur Bhi Hain

39
www.nitingadkari.org
www.spread.ooo

www.facebook.com/nitingadkary

www.twitter.com/nitin_gadkari

You might also like