SINGIDA GOLD PROJECT

• GRADE CONTROL ORE BLOCKS


PIT OUTLINE N
• MINE BENCH FROM 1690mRL-1685mRL

BLOCK ID TONNES(t) GRADE(g/t)

BLK2 200 7 BLK#2


BLK3 40 0.3
BLK#3
BLK4 130 4.5

BLK#4
SINGIDA GOLD PROJECT

• GRADE CONTROL ORE BLOCKS


N
• MINE BENCH FROM 1685mRL-1680mRL

PIT OUTLINE
BLOCK ID TONNES(t) GRADE(g/t)
BLK5 160 2.1 BLK#5
BLK6 405 1.6
BLK7 102 1.01
BLK#6
BLK8 1200 16.11
BLK#7
BLK#8
SINGIDA GOLD PROJECT

• GRADE CONTROL ORE BLOCKS


PIT OUTLINE N
• MINE BENCH FROM 1680mRL-1675mRL
BLK#9

BLOCK ID TONNES(t) GRADE(g/t)


BLK#10
BLK9 9700 2.1

BLK10 503 2.3 BLK#11


BLK11 354 0.9
BLK#12
BLK12 2001 16.5
SINGIDA GOLD PROJECT

• GRADE CONTROL ORE BLOCKS


N
PIT OUTLINE
• MINE BENCH FROM 1675mRL-1670mRL

BLOCK ID TONNES(t) GRADE(g/t)
BLK#13
BLK13 600 2.3
BLK14 502 1.42
BLK15 316 0.21
BLK#14
BLK17 1993 26.8 BLK#15

BLK#17
SINGIDA GOLD PROJECT

• GRADE CONTROL ORE BLOCKS


N
PIT OUTLINE
• MINE BENCH FROM 1670mRL-1665mRL

BLOCK ID TONNES(t) GRADE(g/t) BLK#18
BLK18 1302 1.2
BLK19 550 1.7 BLK#19
BLK20 493 0.4
BLK#20
BLK21 1006 0.9
BLK22 1500 34.1 BLK#21
BLK#22
SINGIDA GOLD PROJECT

• GRADE CONTROL ORE BLOCKS


N
• MINE BENCH FROM 1665mRL-1660mRL PIT OUTLINE

BLOCK ID TONNES(t) GRADE(g/t) BLK#24
BLK24 1500 0.9
BLK25 800 0.4
BLK26 1520 0.6 BLK#25
BLK27 2900 10.7
BLK28 7300 47.5 BLK#26
BLK#27
BLK#28
SINGIDA GOLD PROJECT BLK#24

• GRADE CONTROL ORE BLOCKS


PIT OUTLINE N
• MINE BENCH FROM 1660mRL-1655mRL
BLK#29
• BLOCK ID TONNES(t) GRADE(g/t)
BLK29 1200 0.2
BLK30 710 0.4
BLK31 1103 5.9 BLK#31 BLK#30
BLK32 1011 0.9
BLK33 2090 1 BLK#33 BLK#32
BLK34 914 17.1
BLK35 1231 1.1 BLK#34 BLK#36
BLK36 1100 30.8
BLK#35