You are on page 1of 2

PROGRAM UKUR BAHAN

FAKULTI SENIBINA, PERANCANGAN DAN UKUR


UNIVERSITI TEKNOLOGI MARA

DIRECT BILLING PAPER


PROJECT NO: CADANGAN UBAHSUAI SEBUAH PUSAT PAGE: 1
KEWANGAN

DRWG. NO: JUB/QSM551/QSB561/JUL2017/P1/1-5 DATE: 27/6/2020

AMOUNT
item DESCRIPTION UNIT QUANTITY RATE
RM SEN

ELEMENT: STEEL STRUCTURE FRAME

Erection of Steel Members


Erect 4 nos of Stanchion with a combined
A weight of 4 tonne comprising ITEM

Erect 4 nos of Primary girders with a


B combined weight of 3.86 tonne ITEM

Erect 1 nos of Secondary girders with a


C combined weight of 3 tonne ITEM

Erect 16 nos of Infillet girders with a


combined weight of 3 tonne
D ITEM

25mm diameter Holding Down Bolt 400mm


E long mild steel as anchorages NO 24

22mm diameter bottom mild steel bolts


100mm long heads, nuts and washer
F NO 32

16mm diameter standard sides of rivet heads


G 100mm long with washers NO 64

Prepare and apply two coat of Lead Oxide


H Paint on the surface M2 1

To Collection

You might also like