Revision No: 0
Effective Date: 01-06-15
HAZARD IDENTIFICATION, RISK ASSESSMENT AND DETERMINING CONTROL (HIRADC )
JOB
Piling
PROJECT /LOCATION
CONDUCTED BY
NAME:
Narayanarao
NAME:
NAME:
CICET(M)CORPORATION SDN BHD Form No : HS-01-F01
Revision No: 0
Effective Date: 01-06-15
HAZARD IDENTIFICATION, RISK ASSESSMENT AND DETERMINING CONTROL (HIRADC )
SIGNATURE:
SIGNATURE:
SIGNATURE:
DOCUMENT NO.
HIRADC 007
REVISION DATE
1/3/2020
No
CICET(M)CORPORATION SDN BHD Form No : HS-01-F01
Revision No: 0
Effective Date: 01-06-15
HAZARD IDENTIFICATION, RISK ASSESSMENT AND DETERMINING CONTROL (HIRADC )
Job Step /Activity
N/NR
Hazard Identification
Risk Assessment
RS
Residual Risk
RS
Hazards
Legal Req.
F
CICET(M)CORPORATION SDN BHD Form No : HS-01-F01
Revision No: 0
Effective Date: 01-06-15
HAZARD IDENTIFICATION, RISK ASSESSMENT AND DETERMINING CONTROL (HIRADC )
1.
Designated & Trained Traffic controllers to be assigned. Traffic controller to be equipped with whistle, high visibility clothing & batons/ flags Proper signage to be placed to warn the public.
CICET(M)CORPORATION SDN BHD Form No : HS-01-F01
Revision No: 0
Effective Date: 01-06-15
HAZARD IDENTIFICATION, RISK ASSESSMENT AND DETERMINING CONTROL (HIRADC )
16
Traffic Controller
2.
CICET(M)CORPORATION SDN BHD Form No : HS-01-F01
Revision No: 0
Effective Date: 01-06-15
HAZARD IDENTIFICATION, RISK ASSESSMENT AND DETERMINING CONTROL (HIRADC )
Unloading of materials
Major injury due to contact with load or machinery during lifting operation
1.Workers to be following ergonomic method when unloading bakau to be unloaded using crane
3. Lifting Gears & Crane to be inspected & with valid fitness certificates 4.To lift using designated lifting points only
5.To only use tested and certified lifting gears & equipment only
16
1.Lifting must be supervised by designated lifting supervisor and signalman to use competent operator
3.
Lighting/rain
a) Workers to remain sheltered for 30 minute after the last thunder before resuming bakau pile installation work.
2
CICET(M)CORPORATION SDN BHD Form No : HS-01-F01
Revision No: 0
Effective Date: 01-06-15
HAZARD IDENTIFICATION, RISK ASSESSMENT AND DETERMINING CONTROL (HIRADC )
16
L – Legal
Compliance
Activity
F - Frequency
L -- Likelihood
S -- Severity
RS – Risk Score
Risk Level
Action
Y -- Yes
R- Routine
CICET(M)CORPORATION SDN BHD Form No : HS-01-F01
Revision No: 0
Effective Date: 01-06-15
HAZARD IDENTIFICATION, RISK ASSESSMENT AND DETERMINING CONTROL (HIRADC )
Plan activities.
Trivial
No action required.
N -- No
2 - Minor Injury
10- 25
Acceptable
NA – Not
Applicable
NR – Non Routine
26 -45
Moderate
4 – Critical Injury
46 - 85
Significant
RS - Risk Score
= F (Frequency) x L(Likelihood) x S (Severity)
5 – Hourly > once or more in an hour
5 – Catastrophic
85
Extensive
To implement program/ operation control & ensure valid permit is carried out.
JOB
CICET(M)CORPORATION SDN BHD Form No : HS-01-F01
Revision No: 0
Effective Date: 01-06-15
HAZARD IDENTIFICATION, RISK ASSESSMENT AND DETERMINING CONTROL (HIRADC )
Piling
PROJECT /LOCATION
Midhills Genting
CONDUCTED BY
NAME:
Arumugam
NAME:
NAME:
Thanasegaran
CICET(M)CORPORATION SDN BHD Form No : HS-01-F01
Revision No: 0
Effective Date: 01-06-15
HAZARD IDENTIFICATION, RISK ASSESSMENT AND DETERMINING CONTROL (HIRADC )
SIGNATURE:
SIGNATURE:
SIGNATURE:
DOCUMENT NO.
HIRADC 007
REVISION DATE
5/8/2015
NA – Not NR – Non Routine 3 - Weekly 1- 3 times a week 3- Likely - 1 case within 3-6 months 3 - Major Injury 26 -45 Moderate Additional control required.
Applicable Ad-hoc, emergency or 4 – Daily 1-5 times a day 4- Most Likely-1 case within 1-3 4 – Critical Injury 46 - 85 Significant To implement program/ operation
non-scheduled activities months control.
RS - Risk Score 5 – Hourly > once or more in an 5- Certain - 1 case < 1 months 5 – Catastrophic 85 Extensive To implement program/ operation
= F (Frequency) x L(Likelihood) x S (Severity) hour control & ensure valid permit is
carried out.
CICET(M)CORPORATION SDN BHD Form No : HS-01-F01
Revision No: 0
Effective Date: 01-06-15
HAZARD IDENTIFICATION, RISK ASSESSMENT AND DETERMINING CONTROL (HIRADC )
JOB Piling PROJECT /LOCATION Midhills Genting
NA – Not NR – Non Routine 3 - Weekly 1- 3 times a week 3- Likely - 1 case within 1-6 months 3 - Major Injury 26 -45 Moderate Additional control required.
Applicable Ad-hoc, emergency or 4 – Daily 1-5 times a day 4- Most Likely-1 case within 1-3 4 – Critical Injury 46 - 85 Significant To implement program/ operation
non-scheduled activities months control.
RS - Risk Score 5 – Hourly > once or more in an 5- Certain - 1 case < 1 months 5 – Catastrophic 85 Extensive To implement program/ operation
= F (Frequency) x L(Likelihood) x S (Severity) hour control & ensure valid permit is
carried out.