Project Details Project Relevance

WAMIS Project External Dept. Value of Priority


S. No Name of Ongoing Project Code
Project Category Project Type Nature of Work
project?
Division Circle
Project Project?
Priority Reason Contract Start Date Physical Start Date

Type of Project Is project


underway (eg: funded by an Is this a Date on which
New Enter contract If Priority, choose
Enter the SH, ROB, Major external dept priority project had to begin Date on which on-site
Enter the name of ongoing project which is unique WAMIS
Road/Bridge/Buil
State Building
Construction/M
(eg: Sports,
value of
project in
relevant reason;
as per contract physical progress
physically underway Project Code
ding
etc.); "Others" if
aintenance/Imp
Health,
project (in
your
"None of the Above" if
began (DD-MM-YYYY)
rovement crores) not relevant
none are Education opinion? (DD-MM-YYYY)
relevant etc.)?

“Construction of H.L. Bridge over Connecting Major


New Rayagada(R&B)
1 Jagannathpur Nallah at 57/4-6 km of 3091/193 Bridges MDR
Construction
Yes
Division-II
Raygada 7.3 Yes Economic/Tourist 8/16/2016 8/25/2016
Parvatipur-Gunupur road under CRF” Centres

“Improvement such as Widening and


Strengthening to 4 lane Koraput-Laxmipur-
2
Rayagada-Gunupur-Paralakhemundi road (SH- 3091/678 Roads SH Improvement No
Rayagada(R&B)
Raygada 6.25 Yes
Connecting District
6/1/2018 6/10/2018
4) (Sub-Divisional Head Quarter of Gunupur Division-II HQ
portion) from 181/740 Km to 183/695 Km
under State Plan”

Widening & strengthening to Telengapadra-


Rayagada(R&B) Connecting District
3 Dangasoroda-Chandrapur Road from 25/0 Km 3091/1193 Roads ODR Improvement No
Division-II
Raygada 20.82 Yes
HQ
3/2/2019 3/12/2019
to 40/0 Km
Improvement to Gunupur-Gajapati border via
Rayagada(R&B) Connecting District
4 Anjarasing,Putasing, 3091/1133 Roads ODR Improvement No
Division-II
Raygada 15.36 Yes
HQ
3/6/2019 3/20/2019
Tolana Road

5
Widening and Strengthening to Hatimuniguda - Roads ODR Improvement No
Rayagada(R&B)
Raygada 13.41 No None of the Above 3/7/2019 3/15/2019
-Hukumtala Road from 0/00 to 10/0 KM Division-II

Improvement of road from Tumulupada to


Rayagada(R&B)
6 Badiguda road via New Tahasil Office and New 3091/198 Roads ODR Improvement No
Division-II
Raygada 2.28 No None of the Above 1/28/2019 2/8/2019
Bus Stand under Gudari NAC

Connecting Major
7
Improvement to Ambadala - Belghar road 3091/973 Roads ODR Improvement No
Rayagada(R&B)
Raygada 4.5 Yes Economic/Tourist 3/6/2019 3/11/2019
from 10/0 to 13/400 Km Division-II
Centres
Construction of H.L Bridge over River
New Rayagada(R&B) Connecting District
8 Bansadhara at 55/9000 Km on Komtalpeta- - Bridges SH
Construction
No
Division-II
Raygada 8.97 Yes
HQ
3/2/2019 3/20/2019
Muniguda-Tuumudibandh Raod

9
Improvement to Komtalpeta-Muniguda- 3091/1131 Roads SH Improvement No
Rayagada(R&B)
Raygada 9.18 Yes
Connecting District
6/13/2019 6/20/2019
Tumudibandha road from 30/0 to 50/00 Km Division-II HQ

Construction of HL Bridge at 62/1 km over


New Rayagada(R&B) Connecting District
10 Madhumunda Nallah of Komtalpeta- - Bridges SH
Construction
No
Division-II
Raygada 3.95 Yes
HQ
3/7/2019 3/15/2019
Muniguda-Tumudibandha Road. Road

Construction of HL Bridge Over Telengapadar


New Rayagada(R&B) Connecting District
11 Nallah at 65/590Km of Komtalpeta-Muniguda- - Bridges SH
Construction
No
Division-II
Raygada 4.22 Yes
HQ
3/2/2019 3/10/2019
Tumudibandha Road.

“Improvement such as Widening and


Strengthening to Gunupur- Padmapur road Connecting Major
12 3091/700 Roads MDR Improvement No Rayagada(R&B) Raygada 3.71 Yes 6/1/2018 6/10/2018
Economic/Tourist
(MDR) from 19/000 Km to 22/720 Km under Division-II
Centres
KBK (RLTAP)”

13 Widening and Strengthening of Ambadala - Belghar road Roads ODR


New
No
Rayagada(R&B)
Raygada Yes
Connecting District
from 0/00 to 10/00 Km under CRF for 2018-19 Construction Division-II HQ

Widening and Strengthening to Telengapadra-


New Rayagada(R&B) Connecting District
14 Dangasoroda-Chandrapur Road from 0/00 to 25/00 KM Roads ODR
Construction
No
Division-II
Raygada Yes
HQ
under CRF for 2018-19

15 Widening and Strengthening to Gunupur-Chinasari- Roads ODR


New
No
Rayagada(R&B)
Raygada Yes
Connecting District
Kulusingi from 0/00 to 20/0 KM under CRF for 2018-19 Construction Division-II HQ

Construction of Way Side Amenity Centre


16
(WAC) at 57/300 km on Bhawanipatna- 3091/1049 Buildings Others
New
No
Rayagada(R&B)
Raygada 1.73 Yes None of the Above 9/28/2018 10/5/2018
Muniguda Road near Dahikhal in Rayagada Construction Division-II
District

New Rayagada(R&B)
17 Construction of Charge office at Gunupur 3091/924 Buildings Others
Construction
No
Division-II
Raygada 0.41 Yes None of the Above 9/10/2018 9/22/2018

New Rayagada(R&B)
18 Construction of Charge office at Gudari 3091/925 Buildings Others
Construction
No
Division-II
Raygada 0.618 Yes None of the Above 10/1/2018 10/15/2018

TOTAL 102.09
Project Status
Current
Original Scheduled Current Scheduled End Current Project Forecasted Value of Assistance Other
Milestones in Project Completed Milestones Amount Disbursed Reason for Delay Completion
End Date Date Status Project Required Comments
Forecast

Date on which the Decision/suppor


Date on which the project Major reason behind
project was scheduled Best estimate for Forecasted amount of t required from
is now scheduled to end Number of milestones Number of milestones Amount of money (in Current Status (on delay. If reason not
to end as per original completion of money required for senior
as per amended contract present in project as completed in project crores) disbursed in time, delayed, etc.) available, choose Other
contract project completing the leadership for
provided in contract till date project till date of the project and mention reason in
(DD-MM-YYYY) project (in crores) expediting
(DD-MM-YYYY) 'Other Comments' column
(DD-MM-YYYY) project

Work delayed
due to Public
Major Delay (>20% Protest against
11/15/2017 2.06 Contractor working Slowly 3/31/2020 5.24
of project duration) heavy blow out
side the well &
sinking problem

Reasons for
delay:
tree cutting
Major Delay (>20%
1/31/2019 3.62 Shifting Electric Utilities 12/30/2019 2.63 Eviction of
of project duration)
illegal
encroachment,
unseasonal rain

4/1/2020 0.69 Major Delay (>20% Tree Cutting 12/30/2020 20.13


of project duration)

Major Delay (>20% Contractor working Slowly


3/5/2020 0.5 6/30/2020 14.86
of project duration)

Major Delay (>20% Contractor working Slowly rescind proposal


2/6/2020 0 8/31/2020 13.41
of project duration) initiated

delayed due to
process of land
donation &
Minor Delay
registration of
7/27/2019 0.77 (10.01% to 20% Other 1/31/2020 1.5
gift deed of local
project duration)
people for
construction of
Road

Very Minor Delay


Due to
9/5/2019 3.32 (<= 10% of project Other 11/30/2019 1.18
unseasonal rain
duration)
Confirmatory
Boring
Major Delay (>20%
3/1/2020 0 Other 9/1/2020 8.97 completed and
of project duration)
Design is
awaited

Due to
9/12/2019 2.41 On Time Other 10/31/2019 6.77
unseasonal rain

Very Minor Delay casting of


6/6/2020 0 (<= 10% of project Other 9/30/2020 3.95 foundation
duration) under process

Confirmatory
Very Minor Delay Boring
6/1/2020 0 (<= 10% of project Other 9/1/2020 4.22 completed and
duration) Design is
awaited

Standing crop
10/30/2018 2.09 Major Delay (>20% Other 11/30/2019 1.62 and due to
of project duration)
unseasonal Rain

Tender invited
for 2nd time.

Tender under
finalization at CE
office

Tender under
finalization at CE
office

delayed due to
Very Minor Delay shifting of
6/27/2019 0.38 (<= 10% of project Other 3/31/2019 1.35 Electric poles
duration) from proposed
land

delayed due to
Major Delay (>20%
2/9/2019 0.1 Other 12/31/2019 0.31 handing over of
of project duration)
proposed land

delayed due to
Major Delay (>20%
2/28/2019 0.095 Contractor working Slowly 12/31/2019 0.61 handing over of
of project duration)
proposed land

16.035 86.75