Professional Documents
Culture Documents
Furnishing of information on accident spots as per Police data for Black Spots in 2018 Letter No. 43009, Dt - 18.10.2019 to
2 all E.E.s . Date Line for submission - 25.10.2019. Defaulter Divisions- Sundergarh, Cuttack, Rayagada, Puri, Kantabanjhi,
Koraput, Bargarh, Balasore-I, Sambalpur
3 Requirement of funds for Road Safety Measures, Letter No- 42785 dtd- 17.10.2019. Sent to Govt. amounting to Rs.
8162.64 Lakh.
Sl No Planning Wing Page No
Updation of information in the Odisha Road Asset Management system (ORAMS) web portal
Carriageway
1
Shoulder
Landuse
Road Construction Layer
CBR
Bridge Inventory Information
Culvert Inventory Information
Project Details
1 UC under SARCA ( UC shall be submitted by special messenger) Not Applicable due to Non- receipt of
funds under SARCA Scheme
AGENDA SL No-9
Court Cases on GST and implementation Finance Department order no. 3853
1 Nil
dtd. 10.12.2018 for all ongoing contracts as on 01.07.2017.
AGENDA SL No-12
1
Action taken on disposal online aplication received through " GO SWIFT" up to 3 Nos Online Application
15.09.2019. Disposed
AGENDA SL No-1
1 Biju Expressway
Compliance to Road safety measures Letter No. 39726, Dt - 21.09.2019 to all S.E.s submitted vide this office
1 from C.E. (DPI & Roads), Odisha with reference to Supreme Court Committee letter no 4207 dtd
directives, Date Line for submission - 31.10.2019. Received from S.E., Balasore 30.10.2019 & Ltr No 4245
Circle & S.E., Phulbani Circle Dtd 02.11.19
AGENDA SL No-2
Furnishing of information on accident spots as per Police data for Black Spots in 2018
Letter No. 43009, Dt - 18.10.2019 to all E.E.s . Date Line for submission - 25.10.2019. submitted vide this office
1 Defaulter Divisions- Sundergarh, Cuttack, Rayagada, Puri, Kantabanjhi, Koraput, letter no4162 dtd 25.10.2019
Bargarh, Balasore-I, Sambalpur
AGENDA SL No-3
1
Requirement of funds for Road Safety Measures, Letter No- 42785 dtd- submitted vide this office letter
17.10.2019. Sent to Govt. amounting to Rs. 8162.64 Lakh. no 4032 dtd 11.10.2019
AGENDA SL No-1
Sl Planning Wing Remarks
No
Updation of information in the Odisha Road Asset Management system (ORAMS) web portal
Carriageway
Shoulder
1 Landuse
CBR
Project Details
AGENDA SL No-2
Sl Planning Wing Remarks
No
1 Block Head Quarter Connectivity Submitted vide this office letter no 3909 dtd
25.09.2019
AGENDA SL No-9
Tree Cutting Letter has been sent to DFO Rayagada, vide letter No- 2714 Dtd. 24.05.2019
for cutting of Tree.
Shifting of Letter has been sent to Executive Engineer South Co Rayagada/ Gunupur,
Widening and Strengthening to Hatamuniguda-Hukumtala Electrical Pole for joint verification and submission of Estimate shifting of Electrical Poles.
2 State Plan
Road from 0/00 to 10/00 km
Letter has been sent to Executive Engineer RWSS Rayagada, vide Letter No.
Shifting of Water 3073 Dtd. 17.07.2019 for joint verification and submission of Estimate
supply Line
shifting of Electrical Poles.
Land Acquisition Not Required
Tree Marking done after joint verification estimate to be received from DFO
Tree Cutting & OFDC
Letter has been sent to Executive Engineer South Co Rayagada , vide Letter
Shifting of No. 3071 Dtd. 17.07.2019 for joint verification and submission of Estimate
Improvement to Ambodola-Belghar Road from 00/00 to Electrical Pole
3 CRF shifting of Electrical Poles.
10/00 km
Letter has been sent to Executive Engineer RWSS Rayagada, vide Letter No.
Shifting of Water
3063 Dtd. 16.07.2019 for joint verification and submission of Estimate
supply Line shifting of Electrical Poles.
Land Acquisition Not Required
Tree Marking done after joint verification estimate to be received from DFO
Tree Cutting & OFDC
Widening &
Improvement Renewal Improvement
Strengthening
gth completed up to previous month Length completed during the month in Bridge/ROB/
during 2019-20 (in km) 2019-20 (in km) fly over
completed Remarks
during 2019-20
(in No.)
1 2 3 4 5 6 7
Rayagada
(R&B) “Construction of H.L. Bridge over
1 Division Rayagada Jagannathpur Nallah at 57/4-6 km of CRF 83.42 708.25
No.II Parvatipur-Gunupur road under CRF”
Rayagada
(R&B) Improvement to Gunupur-Gajapati border
7 Rayagada via Anjarasing,Putasing, State plan 10.000 1452.7
Division
Tolana Road
No.II
Rayagada
Improvement of road from Tumulupada to
(R&B)
9 Rayagada Badiguda road via New Tahasil Office and State plan 2.000 231.00
Division
New Bus Stand under Gudari NAC
No.II
Rayagada
(R&B) Improvement to Ambadala - Belghar road
10 Rayagada State plan 3.400 438.53
Division from 10/0 to 13/400 Km
No.II
Rayagada
(R&B) Improvement of Main road from Railway
11 Division Rayagada Level Crossing to Jagannath Temple via Old State plan 0.440 102.8
No.II Gunupur Jn.
Rayagada
(R&B) Construction of H.L Bridge over River
12 Division Rayagada Bansadhara at 55/9000 Km on Komtalpeta- State plan 111.8 926.43
No.II Muniguda-Tuumudibandh Raod
Rayagada
Construction of HL Bridge at 62/1 km over
(R&B)
14 Division Rayagada Madhumunda Nallah of Komtalpeta- SHDP 49.800 365.18
Muniguda-Tumudibandha Road. Road
No.II
Rayagada Construction of HL Bridge Over
15 (R&B) Rayagada Telengapadar Nallah at 65/590Km of SHDP 46.130 431.61
Division Komtalpeta-Muniguda-Tumudibandha
No.II Road.
Expend. Expend.
Total Incurred Incurred Total
during Expend.
Agency/
Agreement Date of Commencement/ Expend. during
Up to 2019-20 2019-20 Incurred till
value Scheduled March, up to during date for the
(Rs. In date of 2019 previous till report project
the Month (Rs.
Lakhs) In Lakhs)
Completion (Rs. In Month submitted (CI. 10+
Lakhs) (Rs. In
Lakhs) (Rs. In CI.11+ CI.12)
Lakhs)
8 9 10 11 12 13
SMUND
Construction
1198.01 Pvt.Ltd 0 0 0 0
07.03.2019-06.02.2020
OBCC
M/S Mahabir Prasad Agarwal
1080.15 08.06.2016/ 1204.5 0 0 1204.5
07.06.2017
BM-4.9/4.9 ,
SDBC - 4.9/4.9 ,
WMM-4.9/4.9
GSB Widening- 100 4.9
4.9/4.9 Km
Rcc Slab Culvert-14/14 nos
HP Culvert-3/3 nos
GSB Widening-9.532/9.532m
WMM-9.532/9.532m
BM & SDBC-9.532/9.532
Rcc Box Culvert-8/12 nos 79 9.532
HP Culvert-
15/10nos
Retaining wall-1670/1800m
BM-1.650/1.955km
SDBC 0.440/ 1.955km
WMM Left side-1.100/1.955km
WMM Right side-1.100/1.955km
GSB inWidening-340 Mtr
P.C.C Drain-350/320m
R.C.C Drain-770/984 m 72 0 0.44
Succer Drain-0/2142m
Box culvert - 7/7 nos
HP Culvert- 01/01 nos
Drain Cover Slab-160 Mtr
GSB Widening-5.000/10.000
WMM-0/10.000
BM & SDBC-0/10.000
Box Culvert-1 No 9 0 0
HP Culvert Double Row-1 No
HP Culvert Single Row-1 No
work started - 0
BM-0/1200
SDBC-0/1200
C.C road-800/800
Earth work Widening-400 mtr
44 0.4 0.4
GSB-400 Mtr
Toe wall=70 Mtr
HP Culvert=3 No
BM-2.500/2.983 km
SDBC-2.500/2.983 km
GSB-2.900/2.983
83 0 2.5
WMM-2.900/2.983 1st layer
WMM-2.900/2.983 2nd layer
9 Nos/9Nos HPC completed
G.S.B-0.440/0.480
W.M.M-0.440/0.480
B.M-0.440/0.480 100 0 0.44
S.D.B.C-0.440/0.480
Key Wall-0.440/0.480
SDBC=8.51 /8.51 km
BM = 8.45/8.51km
WMM ( 1st/2nd) =8.67/8.51km
GSB(Coarse Gr-II-widening) =8.51/ 8.51km
GSB( close Gr-II-widening) =8.51/ 8.51km
HP Culvert(single Row) =10/10 Nos
95 8.51
Box Culvert =11/17 No.
R.W=460/696mtr.
Toe Wall = 180/350mtr
Drain with Cover-85/1480.00mtr
Drain- 580/240mtr
Rigid Pavement-1120/1200
SDBC=8.941/8.941 KM
GSB=8.941/8.941 Km
BM=8.941/8.941
WMM 1st layer=8.941/8.941
WMM 2nd layer=8.941/8.941
HPC=11/11 nos 95 8.941
Box = 17 Nos /17 Nos
T.Wall= 1279 mtr/1029 mtr
Drain= 1200/2900 mtr
BM-2.500/3.72km
SDBC -2.500/ 3.72km
WMM-
2.500/3.72km
G.S.B -2.800/3.72km
Box culvert-2/2 nos
85 0 2.500
0 0 0 0
0.000 0.000 0.000 0.000
0.000
Govt. of Odisha
WORKS DEPARTMENT
PARTMENT
CUTIVE ENGINEER,
SION NO-II, RAYAGADA
ION NO-II , RAYAGADA.
O BE HELD ON 08.11.2019
INFORMATION ABOU
1 2 3 4 5 6 7
Rayagada
“Construction of H.L. Bridge over
(R&B)
1 Rayagada Jagannathpur Nallah at 57/4-6 km of CRF 83.42 708.25
Division Parvatipur-Gunupur road under CRF”
No.II
Expend. Expend.
Incurred Total
Total Incurred during Expend.
Agreement Agency/ Expend. during
Date of Commencement/ Up to 2019-20 2019-20 Incurred till
value Scheduled March, up to during date for the
(Rs. In the Month project (Rs.
Lakhs) date of 2019 previous till report In Lakhs)
Completion (Rs. In Month submitted (CI. 10+
Lakhs) (Rs. In
Lakhs) (Rs. In CI.11+ CI.12)
Lakhs)
8 9 10 11 12 13
CTS.
14 15 16 17
Pier steining-21.95/21.95 Mtr EOT submitted to chief
Sinking-20.45/21.95 Mtr Engineer(DPI & Roads),on
AL steining-21.300 /21.95Mtr 30.4.2018 vide
Work in Progress
AL Sinking-19.45 /21.95Mtr Superintendent Engineer
AR steining- 20.80/21.95 Mtr letter No-686 Dtd
AR Sinking - 19.75/21.95 Mtr 31.07.2019
BM-4.9/4.9 ,
SDBC - 4.9/4.9 ,
WMM-4.9/4.9
Agency asked to submit the
GSB Widening-
4.9/4.9 Km EOT
Rcc Slab Culvert-14/14 nos
HP Culvert-3/3 nos Deviation under Final bill under
GSB Widening-9.532/9.532m preparation preparation
WMM-9.532/9.532m
BM & SDBC-9.532/9.532
Agency asked to submit the
Rcc Box Culvert-8/12 nos
HP Culvert- EOT
15/10nos
Retaining wall-1670/1800m
BM-1.650/1.955km
SDBC 0.440/ 1.955km
WMM Left side-1.100/1.955km
WMM Right side-1.100/1.955km
GSB inWidening-340 Mtr
P.C.C Drain-350/320m Agency asked to submit the Work in Progress
R.C.C Drain-770/984 m EOT
Succer Drain-0/2142m
Box culvert - 7/7 nos
HP Culvert- 01/01 nos
Drain Cover Slab-160 Mtr
DBM =14.500 /15.500Km EOT not required Deviation under Final bill under
BC =14.500/15.500 Km preparation preparation
BM-0/1200
SDBC-0/1200
C.C road-800/800
Earth work Widening-400 mtr Agency asked to submit the Work in Progress
GSB-400 Mtr EOT
Toe wall=70 Mtr
HP Culvert=3 No
BM-2.500/2.983 km
SDBC-2.500/2.983 km
GSB-2.900/2.983 EOT not required Deviation not Final bill under
WMM-2.900/2.983 1st layer required preparation
WMM-2.900/2.983 2nd layer
9 Nos/9Nos HPC completed
SDBC=8.51 /8.51 km
BM = 8.45/8.51km
WMM ( 1st/2nd) =8.67/8.51km
GSB(Coarse Gr-II-widening) =8.51/ 8.51km
GSB( close Gr-II-widening) =8.51/ 8.51km
HP Culvert(single Row) =10/10 Nos EOT under Scrutiny at Deviation under Final bill under
Division Office preparation preparation
Box Culvert =11/17 No.
R.W=460/696mtr.
Toe Wall = 180/350mtr
Drain with Cover-85/1480.00mtr
Drain- 580/240mtr
Rigid Pavement-1120/1200
SDBC=8.941/8.941 KM
GSB=8.941/8.941 Km
BM=8.941/8.941
WMM 1st layer=8.941/8.941
WMM 2nd layer=8.941/8.941 Deviation not Final bill under
HPC=11/11 nos EOT not required required Scrutiny at
Box = 17 Nos /17 Nos Division Office
T.Wall= 1279 mtr/1029 mtr
Drain= 1200/2900 mtr
BM-2.500/3.72km
SDBC -2.500/ 3.72km
WMM-
2.500/3.72km
G.S.B -2.800/3.72km
Box culvert-2/2 nos Agency asked to submit the Work in Progress
EOT
1 2 3 4
Improvement to Bhawanipatna-Muniguda
1 road from 37/0 to 45/0 km ,46/0 to 50/0 15.5Km
km & 53/0 to 56/500 km (State Plan)
5 6 7 8 9
Road Projects
Bridge
10 11 12 13
Widening-5.5.00
M/S Netrananada Pradhan Culvert-8 /19 No
222 P1 2018-19 Box Culvert=0/19
1859.64 SDBC=0/14.860
02.03.2019/ BM=0/14.860
01.04.2020 WMM=0/14.860
GSB=0/14.860
SMUND
Construction
Pvt.Ltd
1198.01 work started
327 P1 201-19
07.03.2019-06.02.2020
GSB Widening-5.000/10.000
WMM-0/10.000
M/S B. Ramanaiha Constructions
1371.63 269 P1 2018-19 BM & SDBC-0/10.000
Box Culvert-1 No
06.03.2019-05.03.2020 HP Culvert Double Row-1 No
HP Culvert Single Row-1 No
Remarks
14
INFORMATION ON NEW PROJECTS T
Sl Name of the (R&B) Name of the project Length of road taken up
No Division (In Km)/Bridge in mtr.
1 2 3 4
5 6 7 8 9
Road Projects
Bridge
10 11 12 13
BM-2.500/2.983 km
M/S RBS Construction SDBC-2.500/2.983 km
268 P1 2018-19 GSB-2.900/2.983
402.93
06.03.2019/ WMM-2.900/2.983 1st layer
05.09.2019 WMM-2.900/2.983 2nd layer
9 Nos/9Nos HPC completed
BM-0/1200
SDBC-0/1200
Sri Sanjeev Ku. Devta C.C road-800/800
Earth work Widening-400 mtr
203.57 131 P1 2018-19 GSB-400 Mtr
28.01.2019 to 27.07.2019 Toe wall=110 Mtr
HP Culvert=4 No
Executive Engineer
Rayagada (R&B) Division No-II
s wing Agenda-6
Remarks
14
INFORMATION ON NEW PROJECTS T
Sl Name of the (R&B) Name of the project Length of road taken up
No Division (In Km)/Bridge in mtr.
1 2 3 4
Improvement to Bhawanipatna-Muniguda
1 road from 37/0 to 45/0 km ,46/0 to 50/0 15.5Km
km & 53/0 to 56/500 km (State Plan)
5 6 7 8 9
Road Projects
Bridge
10 11 12 13
Widening-5.5.00
M/S Netrananada Pradhan Culvert-8 /19 No
222 P1 2018-19 Box Culvert=0/19
1859.64 SDBC=0/14.860
02.03.2019/ BM=0/14.860
01.04.2020 WMM=0/14.860
GSB=0/14.860
SMUND
Construction
Pvt.Ltd
1198.01 work started
327 P1 201-19
07.03.2019-06.02.2020
GSB Widening-5.000/10.000
WMM-0/10.000
M/S B. Ramanaiha Constructions
1371.63 269 P1 2018-19 BM & SDBC-0/10.000
Box Culvert-1 No
06.03.2019-05.03.2020 HP Culvert Double Row-1 No
HP Culvert Single Row-1 No
Remarks
14
Information on Tourist Spots not connected through PWD Ro
Ownership of
Carriageway Width of Formation Remarks if
the Road
Type ( BT/CC) Carriageway Width any
Stretch
Rural Works
BT 3.75 km 7.5
Department
Connectivity to Nearest Railway Station
Rayagada (R&B) Division No-II, Rayagada
Type of ULB
( Municipality,
Remarks
Municipal
Corporation, NAC etc.)
Municipality -
Municipality -
NAC
Double Lane
work in Progress
Status of Distressed of Bridges
Bridge Length with
Sl Name of the Name of the Road Bridge span Agreement Condition of Bridge during 2013 ( As
Location ( As reported by
No Bridge ( km) AMS Consultants) (In reported by AMS Consultants)
Mt)
1 2 3 4 5 6
Rayagada (R&B) Division No-II, Rayagada
Bridges
Status of
Maintenance/Rehabilitation Observation for any
taking as during the period from repair/Rehabilitation by S.E.
2012
7 8
good
30 1
open foundation good
43.8 4
open foundation good
26.31 3
open foundation good
53.85 5
open foundation good
24.00 3
open foundation good
37.5 3
open foundation good
24 3
open foundation good
24 3
open foundation good
32 4
open foundation good
100 10
open foundation good
24 3
open foundation good
32 4
open foundation good
21.43 1