Consiste en
It consists of three
phases
The main
4. Identify Equipment / 4. People assigned to the project 4 Forecast of raw materials In estimation,
4. Identify critical bottlenecks in the 4. Fast track 4. Poor programming The time that factor to be
Resources receive: Motivation, direction and and expenses the
project. an activity will taken into
information continuous
be carried out account is Calculate total cost per Utilize current uptime by Selecting the critical
distribution is Maintain activity times
if everything the time in usually the week for each activity in finding critical routes path and appreciating
is done as which an most the network the least expensive
planned. activity will be appropriate collation cost
5. Microsoft project 5. Variation reports 5. Controls not well defined carried out. activity.
PROBABILITY
OF PROJECT
COMPLETION