1.

READ MANUALS AND SPECIFICATION PAGES OF


ENGINEERED REPORT.

2. PART SPECIFICATIONS CHANGE AT DIFFERENT


ELEVATIONS.

3. SOME WELDING MAY BE SPECIFIED.

4. BOLTING REQUIREMENTS CHANGE AT DIFFERENT


ELEVATIONS.

5. READ AND CALCULATE YOUR LAYOUT FOR


ASSEMBLY.

6. FASTENER SIZE AND TYPE HAVE SPECIFIC USES


AND LOCATIONS.

7. SORT AND COUNT ALL PARTS AND MATCH TO


DELIVERY RECEIPT FOR SHORTAGES BEFORE YOU
START.

8/14/2006 1
18999 US HWY. 27 N.
MARSHALL MI 49068
PHONE: 800-962-1495
WWW.JOHNSONSYSTEMINC.COM

ADJUSTABLE ROOF STAIR


MANUAL

8/14/2006 2
BOLT STEPS UPSIDE DOWN IN BOTTOM
RAILS. PUT ANGLE PLATES AT BOTTOM OF
EACH STAIR SECTION.

PUT ALL STEPS IN SECTION. 5/16” X 1 1/4”


FLANGE BOLT AND FLANGE NUT.

FOR ODD ANGLES


DRILL PLATES OR JUST
PUT 1” WELD ON
PLATE TO FRAME.

8/14/2006 3
INSTALL ALL STEPS AND BOLT ON HAND-
RAIL POSTS WITH ONE BOLT.

PUT ONE TOP FRAME ANGLE TO ANGLE


PLATE AND FLIP FIRST STEP OVER.

8/14/2006 4
PLIERS WILL HELP YOU
HOLD ALIGNMENT AFTER
ALLED TO ALIGN.

‘ALL’ WILL BE
NEEDED TO GET
GALVANIZE OUT OF
SOME HOLES.

8/14/2006 5
WORK POSTS AND FLIP
ALL STEPS OVER.

THEN START AT TOP


END OF SECTION AND
BOLT EACH STEP TO
ONE SIDE.

BOLT UP OTHER TOP


ANGLE FRAME.

8/14/2006 6
BOLT SPLICE BAR
TO END OF
SECTION THAT
GETS EXTENED.

HANDRAIL:

4A

4B 4C
BOLT ON HANDRAIL AS PICTURED IN FIG. 4A, 4B AND
4C.
FOR THE TOP HANDRAIL USE THE TOP HOLE OF THE
THREE.
FOR THE MIDDLE HANDRAIL USE THE BOTTOM HOLE OF
THE THREE.
8/14/2006 7
AFTER HANDRAILS ARE
TIGHT, TIGHTEN ALL
OTHER BOLTS.

5” PLATE CAN
CONNECT TO BIN
ROOF LADDER AND
STAIR FRAME
RAILS OR THRU
STEP FRAME.

8/14/2006 8