PAN SEJATI DEVELOPMENT (M) SDN. BHD.

HOSPITAL TANJUNG KARANG FASA 2


- KERJA RAWATAN TANAH & KERJA BANGUNAN SERTA KERJA-KERJA BERKAITAN (REKA DAN BINA)
QUALITY CONTROL
INSPECTION CHECKLIST
CONSTRUCTION PROCESS : RFI NO : ____________________
CAST-IN-SITU REINFORCED CONCRETE
- INSPECTION OF FORMWORK

Location : ………………………………………………………………………………………………………………………………..
Item Inspection Attributes Contractor Consultant
1 FORMWORK
1A Forms
Pass Fail Pass Fail
a - levels and alignment checked by Surveyor
b - Dimensions and verticality
c - Support or prop, adequate or as per approved
d - Joint tightness ( to withstand vibration)
e - Surface of formwork acceptable

e - All sawdust, debris and water removed

e - All gaps & holes between / in formwork properly sealed

e - Approved non-staining mould oil applied

e - Correct formwork used for specified (finish F1, F2 or F3)

e - Provide specified key along construction joint

f - Chamfer provided as specified

1B Openings and cast in items


Pass Fail Pass Fail
a - dimensions as per drawings
b - position as per drawings

c - embedded plates installed

d - fixing and supports

e - cast-in pipe and conduit

f - waterstop installed as specified

1C Wall and Column Forms


Pass Fail Pass Fail
a - type of form (steel, timber, other …………………….)

b - the bolts (number, location, etc)


c - fixing and supports

d - concrete covers (……………………..)

Reason for Failure or Re-inspection :


…………………………………………………………………………………………………………………………..
…………………………………………………………………………………………………………………………..
Non-conformance Report raised during inspection/re-inspection
Yes No
NCR No………..

Submitted by : Checked by : ( I.O.W/A.R.E ) Approved by : ( A.R.E/R.E )

Name : Name : Name :

Form No: PQP-007/CNS/02 Page 1 of 2


Date : Date : Date :

Form No: PQP-007/CNS/02 Page 2 of 2