You are on page 1of 9

Prepare a bar chart master programme showing the construction time and sequence of the main activties/ components

Project: Four story shop house development

No TASK NAME START DATE END DATE DURATION

A Main Building Works

1 Site clearance 4/1/2020 3/1/2021 277


2 Site and soil survey 5/2/2020 4/2/2021 229
3 Planning 6/4/2020 5/5/2021 232
4 Detail designing 6/4/2020 5/6/2021 233
5 Cost estimation 6/4/2020 5/7/2021 234
6 Stone column 7/1/2020 6/30/2021 251
7 Piling 9/15/2020 9/8/2021 247
8 Ground Beam 9/16/2020 8/16/2021 230
9 Ground Slab 9/30/2020 9/16/2021 242
10 Ground Floor column 10/9/2020 9/30/2021 244
11 1st floor beam and slab 10/28/2020 9/29/2021 231
12 1st floor column 12/28/2020 11/29/2021 232
13 1st floor reinforce concrete staircase 12/28/2020 11/29/2021 232
14 2nd floor beam and slab 1/29/2021 12/28/2021 229
15 2nd floor column 27/02/2021 1/28/2022 232
16 2nd floor reinforce concrete staircase 27/02/2021 1/28/2022 232
17 3nd floor beam and slab 3/28/2021 2/28/2022 231
18 3nd floor column 4/28/2021 3/28/2022 229
19 3nd floor reinforce concrete staircase 4/28/2021 3/28/2022 229
20 Roof beam and slab 5/1/2021 4/28/2022 249
21 Door and window frame 5/15/2021 2/14/2022 188
22 Brickwall to Ground Floor 5/15/2021 3/15/2022 209
23 Brickwall to 1st Floor 6/16/2021 4/16/2022 211
24 Brickwall to 2nd Floor 7/17/2021 5/17/2022 207
25 Brickwall to 3nd Floor 8/18/2021 6/17/2022 209
26 installation of roof trusses 8/20/2021 5/14/2022 183
27 installation of concrete roof tiles 8/21/2021 5/16/2022 183
28 M&E work 10/2/2020 7/2/2022 439
29 Conventional Ceiling with White Paint 9/1/2021 7/7/2022 214
30 Internal wall with Gypsum Plaster 10/3/2021 8/10/2022 216
31 External wall with Gypsum Plaster 11/4/2021 9/12/2022 216
32 Internal Floor Finishes 12/12/2021 11/11/2022 232
33 External Floor Finishes 12/12/2021 11/11/2022 232
34 Staircase Finishes and Balustrading 1/13/2022 12/14/2022 231
35 Iron roll up door installation 1/15/2022 12/16/2022 232
36 Windows, Doors and Ironmongeries 1/18/2022 12/20/2022 233
37 lift installation 1/25/2022 1/10/2023 242
38 Fire System installation 1/30/2022 12/30/2022 231
39 Sanitary Appliances and Fittings 2/5/2022 1/6/2023 233
40 Handover 3/12/2023 3/15/2023 4

B Insfrastructure work
40 Sewerage work 3/6/2022 2/6/2023
41 Road Marking and Sundries Item 4/8/2022 3/9/2023
42 street light 5/10/2022 10/10/2022

No TASK NAME START DATE END DATE DURATION

A Main Building Works

1 Site clearance 4/1/2020 3/1/2021 277


2 Site and soil survey 5/2/2020 4/2/2021 229
3 Planning 6/4/2020 5/5/2021 232
4 Detail designing 6/4/2020 5/6/2021 233
5 Cost estimation 6/4/2020 5/7/2021 234
6 Stone column 7/1/2020 6/30/2021 251
7 Piling 9/15/2020 9/8/2021 247
8 Ground Beam 9/16/2020 8/16/2021 230
9 Ground Slab 9/30/2020 9/16/2021 242
10 Ground Floor column 10/9/2020 9/30/2021 244
11 1st floor beam and slab 10/28/2020 9/29/2021 231
12 1st floor column 12/28/2020 11/29/2021 232
13 1st floor reinforce concrete staircase 12/28/2020 11/29/2021 232
14 2nd floor beam and slab 1/29/2021 12/28/2021 229
15 2nd floor column 27/02/2021 1/28/2022 232
16 2nd floor reinforce concrete staircase 27/02/2021 1/28/2022 232
17 3nd floor beam and slab 3/28/2021 2/28/2022 231
18 3nd floor column 4/28/2021 3/28/2022 229
19 3nd floor reinforce concrete staircase 4/28/2021 3/28/2022 229
20 Roof beam and slab 5/1/2021 4/28/2022 249
21 Door and window frame 5/15/2021 2/14/2022 188
22 Brickwall to Ground Floor 5/15/2021 3/15/2022 209
23 Brickwall to 1st Floor 6/16/2021 4/16/2022 211
24 Brickwall to 2nd Floor 7/17/2021 5/17/2022 207
25 Brickwall to 3nd Floor 8/18/2021 6/17/2022 209
26 installation of roof trusses 8/20/2021 5/14/2022 183
27 installation of concrete roof tiles 8/21/2021 5/16/2022 183
28 M&E work 10/2/2020 7/2/2022 439
29 Conventional Ceiling with White Paint 9/1/2021 7/7/2022 214
30 Internal wall with Gypsum Plaster 10/3/2021 8/10/2022 216
31 External wall with Gypsum Plaster 11/4/2021 9/12/2022 216
32 Internal Floor Finishes 12/12/2021 11/11/2022 232
33 External Floor Finishes 12/12/2021 11/11/2022 232
34 Staircase Finishes and Balustrading 1/13/2022 12/14/2022 231
35 Iron roll up door installation 1/15/2022 12/16/2022 232
36 Windows, Doors and Ironmongeries 1/18/2022 12/20/2022 233
37 lift installation 1/25/2022 1/10/2023 242
38 Fire System installation 1/30/2022 12/30/2022 231
39 Sanitary Appliances and Fittings 2/5/2022 1/6/2023 233
40 Handover 3/12/2023 3/15/2023 4

B Insfrastructure work
41 Sewerage work 3/6/2022 2/6/2023 233
42 Road Marking and Sundries Item 4/8/2022 3/9/2023 232
43 street light 5/10/2022 10/10/2022 107
ain activties/ components for this project.

2020
APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR
2022
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
2021
APR MAY JUN JUL AUG SEP OCT NOV DEC
2023
JAN FEB MAR

You might also like