Account Account Weight

Technical 5

Financial 3
Schedule 2
Sub-Account
Construction
Impact on existing SCS infrastructure
Material availability
Reliability / Risk
Constructability
Flexibility to increase capacity in the future
Capital Cost
Project scheduling
Account Sub-Account

Construction

Impact on existing SCS


infrastructure

Material availability

Technical

Reliability / Risk
Constructability

Flexibility to increase capacity in the


future

Account Sub-Account

Financial Capital Cost

Account Sub-Account

Schedule Project scheduling


Sub-Account Description Sub-Account Weight

-Construction methods and materials are familiar to SMCV (or its


contractors). 3
-Concepts have been successfully implemented by SMCV (or its
contractors) previously.

-The impact that each alternative will have on the existing


2
infrastructure such as the containment wall, liner, abutments, others.

-Availability of construction materials. 2

-Possibility of slope failure, risk of loss of water retention if a failure


were to occur, that could potentially impact the WWTP. 4
-Long-term reliability of design.
-Complex, difficult, or laborious construction procedures could result
in delays, non-compliant quailty standard, equipment/material 3
damages, or additional safety hazards.

-Flexibility to increase capacity (by raising the crest) to meet the


5
requirements for the mine closure conditions.

Sub-Account Description Sub-Account Weight

-Cost to construct each alternative. 3

Sub-Account Description Sub-Account Weight

-Time to construct each alternative. As an assumption, the time of


3
procurement of materials has been excluded.
Metrics

5: High familiarity and previous experience


4: Moderate
3: Moderate to low
2: Low
1: No faimiliarity and previous experience.

5: No impact
4: Low
3: Moderate to low
2: Moderate
1: High impact

5: Material available within 5 km


4: Material avialable within 5-20 km
3: Material available > 20 km away.
2: Material will take more than a week to
arrive to site.
1: Material unavailable

5: Low to none possibility


4: Low
3: Moderate to low
2: Moderate
1: High
5: Low to none complexity
4: Low
3: Moderate to low
2: Moderate
1: High

5: High Flexibility
4: Moderate
3: Modetae to low
2: Low
1: No flexibility

Metrics

5: most preferable cost


4:
3:
2:
1: less preferable cost

Metrics

5: most preferable duration (days)


4:
3:
2:
1: less preferable duration (days)