Reviewer : All Approver : Wong Nit Chuw Final Approver : Zainal Huzairi
Name & Initial Name & Initial
Reviewer’s Status
Item Document / Drawings No. PDP’s Comment Code WPC’s Response
Name (Open/ Closed)
1. SSP-H-TRCP-STP5-SBSS- No Comment Mohd 1
ARC-LAP-508835_H00 Yahya/
SSP-H-TRCP-STP5-SBSS- Lokman
ARC-LOP-508836_H00 Syably/
SSP-H-TRCP-STP5-SBSS- Boon Keat
MMC GAMUDA KVMRT (PDP SSP) SDN. BHD.
PROJEK MASS RAPID TRANSIT LALUAN 2 : SG BULOH – SERDANG – PUTRAJAYA (SSP)
Reviewer’s Status
Item Document / Drawings No. PDP’s Comment Code WPC’s Response
Name (Open/ Closed)
ARC-STS-508837_H00 Khoo/ Zainal
SSP-H-TRCP-STP5-SBSS- Mokhtar/
ARC-STS-508838_H00 Adzhar
Fuad/ Chin
Guan Koh/
Mohd Nazli/
Abd Talib
MMC GAMUDA KVMRT (PDP SSP) SDN. BHD.
PROJEK MASS RAPID TRANSIT LALUAN 2 : SG BULOH – SERDANG – PUTRAJAYA (SSP)
Reviewer’s Status
Item Document / Drawings No. PDP’s Comment Code WPC’s Response
Name (Open/ Closed)
Reviewer’s Status
Item Document / Drawings No. PDP’s Comment Code WPC’s Response
Name (Open/ Closed)
4. SSP-H-TRCP-STP5-SBSS- 1) Vertical groove line & shadow line Mohd yahya 2
ARC-STS-508837_H00 are not allowed. Horizontal Groove line
at 600mm c/c (to refer general wall
groove line) is most preferred. To refer
CSO front elevation (metal panel)
profile
Reviewer’s Status
Item Document / Drawings No. PDP’s Comment Code WPC’s Response
Name (Open/ Closed)
5. SSP-H-TRCP-STP5-SBSS- 1) To coordinate with System & M&E Mohd yahya 2
ARC-STS-508838_H00 team on cable routing & alignment.